My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 738-80
>
Ordinances
>
Ordinance 738-80
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2018 9:57:31 AM
Creation date
8/24/2018 9:57:29 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
738-80
Date
10/29/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Port Gardner Neighborhood Improvements: <br /> 1. Complete any 1978 Port Gardner Neighborhood projects <br /> which were approved by City Council in 1978 but can- <br /> not be completed with 1978 Port Gardner Block Grant <br /> funds, up to a maximum of $10 , 000 . <br /> 2 . Two reflective tape crosswalk signs on the north <br /> sides of the 35th and Hoyt intersection and the 36th <br /> and Hoyt intersection. <br /> (Estimated Cost: $300) <br /> 3 . Improvements on 35th from Hoyt to Rucker up to a <br /> maximum of $33 , 000 in the following priority: <br /> a. curbs and gutters on north and south sides <br /> b. sidewalk on south side <br /> c. street repairs (fill and overlay) <br /> d. driveway and alley apron on north side <br /> (Estimated Cost: $33 , 000) <br /> 4 . Five street lights and poles : <br /> a. northwest corner of Wall and Federal inter- <br /> section <br /> b. mid-block on west side of 2900 Nassau <br /> c. northwest corner of Wall and Nassau inter- <br /> section <br /> d. mid-block on west side of 3000 Nassau <br /> e. northwest corner of Pacific and Nassau inter- <br /> section <br /> (Estimated Cost : $3 , 500) <br /> 5 . Sidewalk (driveway) repair at 3617 Rockefeller. <br /> (Estimated Cost: $300) <br /> 6 . Improvements on 38th and 39th between Friday and Grand <br /> up to a maximum of $25 , 000 in the following priority: <br /> a. curbs, gutters, sidewalk and rockery on north <br /> side and street repairs on 38th <br /> (Estimated Cost: $17 , 793) <br /> b. curbs, gutters and sidewalk on north side and <br /> street repairs on 39th <br /> (Estimated Cost: $14 , 568) <br /> 7 . Complete any 1979 or 1980 Port Gardner Neighborhood <br /> Projects that were approved by the City Council in <br /> 1979 and 1980 but cannot be completed with 1979 or <br /> 1980 Port Gardner Block Grant Funds up to a maximum <br /> of $15 , 000 . <br /> 8 . Extruded cement concrete curbs on both sides of Norton <br /> Bridge (3300 Block) . <br /> (Estimated Cost: $3 , 135) <br /> (5) <br />
The URL can be used to link to this page
Your browser does not support the video tag.