My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HWA GeoSciences Inc 8/23/2018 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2020
>
HWA GeoSciences Inc 8/23/2018 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2018 11:09:21 AM
Creation date
8/28/2018 11:09:17 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HWA GeoSciences Inc
Approval Date
8/23/2018
Council Approval Date
8/22/2018
End Date
12/31/2020
Department
Public Works
Department Project Manager
Ed Fisher
Subject / Project Title
Beverly Lake Sanitary Sewer Replacement
Public Works WO Number
UP3529 1
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> July 30, 2018 <br /> HWA Project No. 2016-044-21 <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett, Washington 98201 <br /> Attention: Ed Fisher,P.E. <br /> Subject: Additional Geotechnical Engineering Services <br /> Beverly Lake Sewer Improvements <br /> Everett, Washington <br /> Dear Ed: <br /> As requested, HWA GeoSciences Inc. (HWA) is pleased to present this scope of work to provide <br /> additional geotechnical engineering services for the assessment of the Beverly Lake Sewer <br /> Improvements in Everett, Washington. The need for additional services is associated with utility <br /> alignment changes will require additional geotechnical explorations and analysis to complete the <br /> design. <br /> PROJECT UNDERSTANDING <br /> It is our understanding that the City of Everett would like to reconstruct portions of the sewer lines <br /> serving the apartment and condo buildings situated along the eastern end of Beverly Lake. We <br /> understand that the current sewer system consists of a series of gravity lines and associated <br /> manholes. We understand that the City has adopted a specific improvement plan (option B) that <br /> could serve to alleviate the need to regular maintenance of the system. The improvements include <br /> abandoning the existing gravity city main and easement and subsequently adding a new private <br /> main gravity/easement gravity and city force main systems. The alignment of the city gravity main <br /> and easement will be directed away from Beverly Lake rather than within the lake. <br /> We understand that the City of Everett desires to evaluate the soil and slope conditions in the <br /> vicinity of the system to help in developing and designing a preferred sewer improvement <br /> alternative. <br /> Supplementary Field Explorations <br /> • Plan Supplementary Field Exploration Program: HWA will plan a supplementary field <br /> exploration program that provides subsurface soils and groundwater information along the <br /> unexplored portion of the chosen utility alignment. HWA will coordinate with local <br />
The URL can be used to link to this page
Your browser does not support the video tag.