My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HWA GeoSciences Inc 8/23/2018 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2020
>
HWA GeoSciences Inc 8/23/2018 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2018 11:09:21 AM
Creation date
8/28/2018 11:09:17 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HWA GeoSciences Inc
Approval Date
8/23/2018
Council Approval Date
8/22/2018
End Date
12/31/2020
Department
Public Works
Department Project Manager
Ed Fisher
Subject / Project Title
Beverly Lake Sanitary Sewer Replacement
Public Works WO Number
UP3529 1
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 30, 2018 <br /> HWA Project No. 2016-044-21 <br /> Geotechnical Project Management <br /> • Task Management: HWA will prepare monthly invoices, and progress reports if <br /> required. We will correspond with the City of Everett and possible design team in the <br /> form of emails, fax, and telephone calls, as necessary. <br /> ASSUMPTIONS: <br /> • The CITY will obtain permission to access the proposed boring locations. <br /> • Any required street use, and other permit fees will be paid by others. <br /> • The City will provide As-Built documents for the adjacent buildings. <br /> DELIVERABLES: <br /> • Exploration Figure <br /> • Draft Geotechnical Report <br /> • Final Geotechnical report <br /> COST ESTIMATE <br /> Based on our understanding of the project and assumed site conditions,we propose to provide the <br /> above geotechnical engineering scope of services, to provide final design analysis and <br /> supplementary explorations,on a time and materials basis not to exceed$25,979. HWA currently <br /> has approximately$18,964 remaining in our initial budget for this project. Therefore,the proposed <br /> final design and supplementary explorations will require a budget supplement of $7,015. <br /> However, if during the project unexpected conditions are revealed that require alteration of our <br /> work scope, or the Client or Owner request analyses and evaluations which would require a level <br /> of effort beyond the scope of our proposed study and budget, we will contact you immediately to <br /> discuss any necessary modifications to our scope of services and/or budget estimate. A summary <br /> of our estimated costs are presented on the attached spreadsheet. <br /> 0•0 <br /> HWA Scope <br />
The URL can be used to link to this page
Your browser does not support the video tag.