My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc 8/23/2018
>
Contracts
>
6 Years Then Destroy
>
2019
>
Perteet Inc 8/23/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2018 11:22:50 AM
Creation date
8/28/2018 11:22:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc
Approval Date
8/23/2018
Council Approval Date
8/22/2018
End Date
12/31/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Provide Civil Engineering Services
Public Works WO Number
PW3640
Tracking Number
0001377
Total Compensation
$339,618.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT DOWNTOWN STREETSCAPE IMPROVEMENT — RUCKER AVE. <br /> Agreement with Perteet Inc. July 16, 2018 <br /> • Propose & Review (3) alternatives including "no trellis" design with city and <br /> select final concept to develop further. <br /> • Propose & Review final preferred alternative design with City. <br /> • Develop preferred alternative to 90% design. <br /> Deliverables: <br /> • (3) Draft concept alternatives (including no trellis alternative) handouts, <br /> drawings, plans, views. Up to (2) sheets per alternative. <br /> • Final concept handouts, drawings, plans, views. Up to (2) sheets. <br /> • Preliminary cost estimate <br /> Task 7 - Revised 90% Roadway Design & PS&E Preparation <br /> The Phase 1 Rucker and Hoyt 90% design will be separated into a stand-alone Rucker <br /> Avenue PS&E set. This portion will be reviewed and revised based on comments and <br /> direction from the City on the Phase 1 90% design. The Consultant will parse the <br /> project sheets from the previous 90% submittal for the complete project. The <br /> Consultant will prepare 90% contract plans, specifications and opinion of cost estimate <br /> for the proposed roadway improvements. <br /> PS&E design and preparation will be based on the following standards: <br /> • City of Everett "Design and Construction Standards and Specifications for <br /> Development", current edition as published on the City website; <br /> • City of Everett "Stormwater Management Manual", 2017 version; <br /> • AASHTO guidance "A Policy on Geometric design of Highways and Streets", 2011; <br /> • WSDOT "Standard Specifications for Road, Bridge, and Municipal Construction", <br /> 2018 edition; <br /> • Plan sheets will prepared based on City of Everett Public Works Survey & CADD <br /> Standards, using Autodesk Civil 3D 2016 or newer; <br /> Page 12 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.