My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc 8/23/2018
>
Contracts
>
6 Years Then Destroy
>
2019
>
Perteet Inc 8/23/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2018 11:22:50 AM
Creation date
8/28/2018 11:22:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc
Approval Date
8/23/2018
Council Approval Date
8/22/2018
End Date
12/31/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Provide Civil Engineering Services
Public Works WO Number
PW3640
Tracking Number
0001377
Total Compensation
$339,618.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT DOWNTOWN STREETSCAPE IMPROVEMENT — RUCKER AVE. <br /> Agreement with Perteet Inc. July 16, 2018 <br /> Task 8 - 100% Roadway Design & PS&E Preparation <br /> The Consultant will prepare the 100% design and PS&E package based on comments <br /> and direction from the City's review of the 90% submittal. <br /> This task will consist of the following work elements: <br /> 8.1 Preparation of 100% Plans: <br /> It is anticipated the 100% level PS&E plan set will include the same sheets as <br /> identified under Task 7. <br /> This work element will include the Consultants review of the City's 90% PS&E <br /> review comments based upon the 90% submittal. The Consultant will attend one <br /> review meeting with the City staff, and provide a written response to the City's <br /> comments. <br /> 8.2 Preparation of 100% Specifications: <br /> The Consultant will review the City's review comments based on the 90% <br /> submittal and prepare the 100% technical specifications. <br /> 8.3 Preparation of 100% Opinion of Cost Estimate: <br /> The Consultant will prepare a quantity estimate and 100% Engineer's Opinion of <br /> Cost Estimate. The Consultant will also review the City's review comments based <br /> on the 90% submittal, and make revisions as necessary. <br /> 8.4 QA/QC Review: <br /> An internal Consultant quality assurance/quality control review of deliverables will <br /> be conducted, as well as confirmation that comments received have been <br /> addressed. A record of comments received will be maintained. Response to each <br /> comment received will be tracked to confirm that they have been addressed. <br /> Page 17 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.