My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc 8/23/2018
>
Contracts
>
6 Years Then Destroy
>
2019
>
Perteet Inc 8/23/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2018 11:22:50 AM
Creation date
8/28/2018 11:22:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc
Approval Date
8/23/2018
Council Approval Date
8/22/2018
End Date
12/31/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Provide Civil Engineering Services
Public Works WO Number
PW3640
Tracking Number
0001377
Total Compensation
$339,618.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT DOWNTOWN STREETSCAPE IMPROVEMENT — RUCKER AVE. <br /> Agreement with Perteet Inc. July 16, 2018 <br /> • If additional documentation (such as SEPA, or cultural resources support) is <br /> needed to support the water main replacement, this will be considered an <br /> additional service and may be prepared by the Consultant for a supplemental <br /> fee to this Agreement. <br /> Deliverables: <br /> • Draft and Final Form EZ1 and APE <br /> Task 11 — BIDDING ASSISTANCE <br /> The Consultant will assist the City with answering questions from the Contractors during <br /> the bidding process. The Consultant will also prepare addendums for the City (if necessary). <br /> This task will consist of the following work elements: <br /> 11.1 RFIs: <br /> Perteet will provide assistance to the City during the bidding period (assume four <br /> weeks) to respond to Contractor inquiries. <br /> 11.2 Addendums: <br /> Perteet will provide assistance to the City during the bidding period (assume four <br /> weeks) and prepare addenda as required (up to two assumed). <br /> Page 21 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.