Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF WORK <br /> PROJECT OVERVIEW <br /> The City of Everett has requested that CG Engineering provide professional structural engineering services for two <br /> projects at Reservoir#3,which is located at 6003 Evergreen Way in Everett,Washington. <br /> The first project involves the design of a new Ianding platform inside the valve vault,which has deteriorated and <br /> requires replacement.The existing platform is wood-framed and supported on existing concrete walls of the vault <br /> and steel beams that are bolted to the vault walls.The replacement platform will likely be framed with stainless steel, <br /> aluminum,or fiberglass framing. A new fixed ladder will also be installed with a new access hatch at the landing <br /> platform.CG Engineering will provide structural construction documents for the new platform and ladder. <br /> The second project involves the structural evaluation of the reservoir's concrete lid,which is exhibiting cracking at <br /> the joints and some spalling at the top of the perimeter walls.CG Engineering will provide a structural evaluation <br /> report with recommendations for future repair or replacement. <br /> Project 1 —Valve Vault Landing Platform Replacement Estimated Fee: $20,830.00 <br /> Project 2—Reservoir Lid Evaluation Estimated Fee: $8,360.00 <br /> 20%Contingency(City Project Manager's Authorization Required) Estimated Fee: $5,838.00 <br /> Total Estimated Fee Not to Exceed: $35,028.00 <br /> PROJECT 1 —VALVE VAULT LANDING PLATFORM REPLACEMENT <br /> CG Engineering will provide structural calculations and drawings for a new steel platform to replace the existing <br /> wood and steel landing platform inside the existing concrete vault structure. <br /> Task 1 —Project Management <br /> CG Engineering will manage all aspects of the structural scope,schedule and budget.Project management services <br /> include. <br /> 1.1 Correspondence and coordination with City project manager and staff <br /> 1.2 CG Engineering staff management <br /> 1.3 Attend design kick-off meeting with City staff <br /> Assumptions <br /> • City will take the lead of overall project management. <br /> Deliverables <br /> • Email progress updates and coordination with City staff. <br /> Task 2—Data Collection and Field Investigation <br /> CG Engineering will evaluate existing conditions and collect data of the vault. <br /> 2.1 Review available existing records for the vault and landing platform. <br /> 2.2 Conduct(1)site visit with City staff to evaluate the as-built conditions of the existing vault. <br /> 2.3 Organize data collected in the field to be used in design. <br /> Assumptions <br /> • City will provide us with available drawings and information. <br /> • City will coordinate and schedule site visit access to the vault. <br /> • We have assumed CG Engineering staff will be allowed inside the vault. Otherwise,City personnel will <br /> Page 12 <br /> (CG Engineering July 23,2018) <br />