My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/08/22 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/08/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 10:43:22 AM
Creation date
8/30/2018 10:41:30 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/22/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT DOWNTOWN STREETSCAPE IMPROVEMENT — RUCKER AVE. <br /> Agreement with Perteet Inc. July 16, 2018 <br /> Consultant may be provided as an additional service and may be <br /> supplemented to this Agreement. <br /> Deliverables: <br /> • Letter and preliminary plan set to franchise utilities. <br /> • Copies of 90%, 100%, and final plans to franchise utilities. <br /> • Meeting agendas and notes. <br /> Task 5 -- Water Main PS&E Coordination <br /> The City will prepare a design and Plans, Specifications, and Opinion of Costs (PS&E) for <br /> a water main replacement, anticipated to be installed on Rucker Avenue from Pacific to <br /> Everett Avenue. The Consultant will coordinate with the City.to incorporate those <br /> construction documents in to the Contract Documents for the Rucker Avenue <br /> Streetscape project being prepared by the Consultant. <br /> This work element shall include the following tasks: <br /> 5.1 Coordination With City: <br /> The Consultant will coordinate with the City on the progress and the design of <br /> the water main to ensure there are no conflicts between the two projects. This <br /> task will include checking for conflicts, horizontally and vertically, with the <br /> Consultant's design elements with the water main connections at the project <br /> match limits. This includes up to one (1) meeting with City staff. <br /> 5.2 Inclusion of Contract Documents: <br /> The Consultant will incorporate the water main construction documents in to the <br /> Rucker Avenue contract documents, including the Plans, Specifications, and <br /> Opinion of Costs. The Consultant will include the water main Plans, Specifications, <br /> and Opinion of Cost with the Consultant provided contract documents for the <br /> 90%, 100%, and Final Submittals. This task will also include incorporating the <br /> water main quantities in to the Bid Item List for advertisement. <br /> Page 10 10 7 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.