My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 725-80
>
Ordinances
>
Ordinance 725-80
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:22:57 AM
Creation date
9/4/2018 10:22:54 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
725-80
Date
9/3/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 1 building or structure must be secured, the order <br /> 2 shall require that the building be secured against <br /> 3 unauthorized entry within such time as the Building <br /> 4 Official shall determine is reasonable (not to <br /> 5 exceed 20 days from the date of the order) . <br /> 6 Section 7 : Section 403 (a) of the Uniform Code for the <br /> 7 Abatement of Dangerous Buildings is hereby amended by deleting : <br /> 8 Standards to be Followed. The following standards <br /> 9 shall be followed by the Building Official (and by <br /> 10 the Board of Appeals if an appeal is taken) in ordering <br /> 11 the repair , vacation or demolition of any dangerous <br /> 12 building or structure: <br /> 13 1. Any building declared a dangerous building <br /> 14 under this ordinance shall either be repaired <br /> 15 in accordance with the current building code <br /> 16 or shall be demolished at the option of the <br /> 17 building owner. <br /> 18 2 . If the building or structure is in such con- <br /> 19 dition as to make it immediately dangerous to <br /> 20 the life, limb, property or safety of the <br /> 21 public or its occupants, it shall be ordered <br /> 22 to be vacated. <br /> 23 and inserting in its place: <br /> 24 403 (a) - Standards to be followed. The following <br /> 25 standards shall be followed by the Building Official <br /> 26 (the City Council if a demolition resolution and by <br /> 27 the Board of Appeals if an appeal is taken) in ordering <br /> 28 the repair, vacation, or demolition of any dangerous <br /> 29 building or structure: <br /> 30 <br /> 31 <br /> 32 -9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.