Laserfiche WebLink
1 <br /> 3. Improvements on 35th from Hoyt to Rucker up to a <br /> maximum of $33, 000 in the following priority: <br /> a. curbs and gutters on north and south sides <br /> b. sidewalk on south side <br /> c. street repairs (fill and overlay) <br /> d. driveway and alley apron on north side <br /> (Estimated Cost: $33, 000) <br /> 4. Five street lights and poles : <br /> a. northwest corner of Wall and Federal inter- <br /> section <br /> b. mid-block on west side of 2900 Nassau <br /> c . northwest corner of Wall and Nassau inter- <br /> section <br /> d. mid-block on west side of 3000 Nassau <br /> e. northwest corner of Pacific and Nassau inter- <br /> section <br /> (Estimated Cost: $3, 500) <br /> 5. Sidewalk (driveway) repair at 3617 Rockefeller. <br /> (Estimated Cost: $3, 500) <br /> 6 . Improvements on 38th and 39th between Friday and Grand <br /> up to a maximum of $25, 000 in the following priority: <br /> a. curbs, gutters, sidewalk and rockery on north <br /> side and street repairs on 38th <br /> b. curbs, gutters and sidewalk on north side and <br /> street repairs on 39th <br /> (Estimated Cost: $14, 568) <br /> 7 . Mini-Park at Grand/High/Norton intersection up to a max- <br /> imum of $15, 000 in the following priority: <br /> a. clearing of berry bushes <br /> b. fencing <br /> c . sodding <br /> (Estimated Cost: $15, 000) <br /> 8 . Extruded cement concrete curbs on both sides of Norton <br /> Bridge (3300 Block) <br /> (Estimated Cost: $3, 135) <br /> 9. Completion of Item #6 above, if not completed with budgeted <br /> $25, 000. <br /> 10. Sidewalk reconstruction on Gedney and Wall in the following <br /> priority: <br /> (2) <br />