|
2006 WSEC COMPLIANCE MECHANICAL LEGEND
<br /> 1. HVAC EQUIPMENT SHALL HAVE MINIMUM PERFORMANCE AT SPECIFIED RATING GENERAL EQUIPMENT PLUMBING AND PIPING(CONT) ABBREVIATIONS
<br /> CONDITIONS NOT LESS THAN THE VALUES INDICATED IN TABLE 14-1A THROUGH
<br /> 14-1M AND 1411.1 OF THE WSEC AND AS INDICATED ON THE CONTRACT DOCUMENTS. SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION ACU AIR CONDITIONING UNIT W C
<br /> 2. PROVIDE DEADBAND BETWEEN HEATING/COOLING SPACE SENSOR SETPOINTS OF HEAVY LINE INDICATES NEW WORK 0 THERMOSTAT OR TEMPERATURE SENSOR 0 FCO FLOOR CLEANOUT ABOP ADJUSTABLE BLOW OUT PANEL
<br /> U 61)
<br /> 5 DEGREES AS REQUIRED BY SECTION 1412.2 OF THE WSEC OR AS DESCRIBED Q DUCT SMOKE DETECTOR AFF ABOVE FINISH FLOOR
<br /> IN THE TEMPERATURE CONTROL SEQUENCES. LIGHT LINE INDICATES EXISTING WORK IWCO WALL CLEANOUT AHU AIR HANDLING UNIT
<br /> Z
<br /> Q NITROUS DIOXIDE SENSOR
<br /> ro
<br /> 3. HVAC SYSTEMS SHALL BE EQUIPPED WITH AUTOMATIC CONTROLS CAPABLE OF CENTERLINE AL ALUMINUM WALL HYDRANT/HOSE BIBB ARCH ARCHITECTURAL
<br /> ACCOMPLISHING SETBACK OR SHUTDOWN DURING UNOCCUPIED PERIODS AS --------- CONTROL WIRING/TUBING
<br /> iLi *--
<br /> REQUIRED BY SECTION 1412.4 OF THE WSEC AND AS DESCRIBED IN THE --- MATCHLINE MAV ---
<br /> TEMPERATURE CONTROL SEQUENCES. //////// EXISTING WORK TO BE REMOVED 2 f 2 TERMINAL UNIT, SEE SCHEDULE AAV MANUAL AIR VENT BHP BRAKE HORSEPOWER 0 ,,,,,a)
<br /> 4. PROVIDE BALANCING DEVICES IN ALL BRANCH DUCTS AND PIPE RUNS TO I. PIPELINE - NORMAL DIRECTION OF FLOW L-��-ACCESS AUTOMATIC AIR VENT BOT BOTTOM
<br /> TERMINAL DEVICES AS REQUIRED BY SECTION 1412.7 OF THE WSEC AND AS Q--- CFM CUBIC FEET PER MINUTE
<br /> INDICATED ON THE CONTRACT DOCUMENTS. SA FLOW ARROW (SUPPLY AIR SHOWN) .13- UNIT HEATER, SEE SCHEDULE RELIEF VALVE CLG CEILING
<br /> 5. ALL DUCTWORK SHALL COMPLY WITH SMACNA STANDARDS FOR CONSTRUCTIONr"'''' C *'-'
<br /> OF GALVANIZED DUCTWORK. ALL DUCTWORK SHALL BE SEALED AS REQUIRED 2lel 2 PUMP, SEE SCHEDULE STEAM RELIEF VALVE WITH CO CLEANOUT
<br /> O KEY NOTE CALLOUT DRIP PAN ELBOW COND CONDENSING
<br /> BY SECTION 1414.1 OF THE WSEC. DUCT TAPE NOT ALLOWED. CONN CONNECTION ..
<br /> fa; 5,,,p 0,
<br /> DUCTWORK STATIC PRESSURE AND SEAL CLASS: 0 REVISION CALLOUT PLUMBING AND PIPING _ THRUST BLOCK CONT CONTINUATION
<br /> WATER COLUMN SEAL CLASS CW COLD WATER
<br /> ih TO 2 INCHES SEAL TRANSVERSE JOINTS
<br /> IJ PPLUMBING FIXTURE OR DRAIN CALLOUT,
<br /> SEE SCHEDULE SYMBOL DESCRIPTION 11L VENT THROUGH ROOF DB DRY BULB
<br /> 2 TO 3 INCHES SEAL TRANSVERSE JOINTS AND LONGITUDINAL SEAMS - COLD WATER CI FLOOR DRAIN DDC DIRECT DIGITAL CONTROL
<br /> OUTLET CALLOUT, SEE SCHEDULE
<br /> A MEDICAL
<br /> DEG
<br /> DEGREE
<br /> 3 INCHES SEAL TRANSVERSE, JOINTS, LONGITUDINAL SEAMS O -__
<br /> ABOVE CHOT WATER 47:„„„„,,„„,„
<br /> AND DUCT WALL PENETRATIONS S POINT OF CONNECTION O ROOF DRAIN DIA DIAMETER
<br /> 6. ALL DUCTWORK SHALL BE INSULATED AS REQUIRED BY SECTION 1414.2 OF --- HOT WATER CIRCULATING DL DUCT LINER
<br /> THE WSEC AND AS DESCRIBED IN SECTION 15081 OF THE PROJECT MANUAL. (35.4 12) PIPE FLOW CALLOUT: SOIL OR WASTE - ABOVE GROUND MEDICAL AND LABORATORY DN DOWN
<br /> -PIPE SIZE (IN) -SI- SOIL OR WASTE - BELOW GROUND DWG DRAWING EVERETT,WASHINGTON
<br /> DUCT TYPE LOCATION R-VALUE SYMBOL DESCRIPTION
<br /> EA EXHAUST AIR
<br /> SUPPLY/RETURN NOT WITHIN CONDITIONED SPACE R-7 (INCLUDE APPROVED VOLUME FLOW RATE (GPM) RWL RAINWATER LEADER Dl DEIONIZED WATER EAT ENTERING AIR TEMPERATURE
<br /> WEATHERPROOF BARRIER) I EF-1 I EQUIPMENT CALLOUT, SEE SCHEDULE -ORWL- OVERFLOW RAINWATER LEADER RO- REVERSE OSMOSIS WATER EF EXHAUST FAN GU NSU
<br /> SUPPLY/RETURN/ IN GROUND OR CONCRETE R-5.3 ----- VENT - ABOVE GRADE EFF EFFICIENCY ��
<br /> CD2-300 DIFFUSER OR GRILLE CALLOUT, SEE SCHEDULE -- -- - WAGD WASTE ANESTHESIA GAS DISPOSAL ELEC ELECTRICAL ��
<br /> OUTSIDE AIR
<br /> OUTSIDE AIR WITHIN CONDITIONED SPACE R-7 (DAMPER AT ` -VOLUME FLOW RATE (CFM), NONE INDICATED HF VENT BELOW GRADE ENT ENTERING
<br /> HPA HIGH PRESSURE AIR (30+PSI) EQPT EQUIPMENT -� �'
<br /> (NOT CONSIDERED PART OF ENVEOPE PENETRATION) FOR TRANSFER GRILLE Ro REVERSE OSMOSIS (PURE WATER) -LA LABORATORY AIR ESPQEXTERNAL STATIC PRESSURELG r
<br /> THE BUILDING ENVELOPE) DIFFUSER OR GRILLE TYPE N .c2
<br /> TP TRAP PRIMING LINE -L02 LABORATORY OXYGEN EXH EXHAUST
<br /> SUPPLY WITHIN CONDITIONED SPACE R-3.3 0 INDICATES DIAMETER OR ROUND ID INDIRECT DRAIN EXIST (E) EXISTING �� ��
<br /> 7. ALL PIPING SHALL BE INSULATED AS REQUIRED BY SECTION 1415.1 OF THE . FLATOVAL G GAS Lv LABORATORY VACUUM EWT ENTERING WATER TEMPERATURE �yITEC�S
<br /> INDICATES WSEC AND AS DESCRIBED IN SECTION 15083 OF THE PROJECT MANUAL: cot CARBON DIOXIDE F FAHRENHEIT
<br /> Allh DETAIL CALLOUT: HPNP HIGH PRESSURE NON-POTABLE COLD WATER FCO FLUSH CLEANOUT
<br /> PIPE DIAMETER: - MA MEDICAL AIR FD FLOOR DRAIN/FIRE DAMPER Architecture/Planning/Interior Design
<br /> N P NON-POTABLE N-POTABLE COLD WATER Portland Seattle Los Angeles Washington DC
<br /> SYSTEM/TEMP (°F) INSULATION <1" I>1"-2"I>2"-4"I>4"-6"I>6" W��INDICATES DETAIL NUMBER - My MEDICAL VACUUM FDC FIRE DEPARTMENT CONNECTION
<br /> CONDUCTIVITY SHEET NUMBER WHERE DETAIL IS DRAWN -HPA HIGH PRESSURE AIR o2 OXYGEN FHV FIRE HOSE VALVE 925 Fourth Ave.,Suite 2400
<br /> INSULATION THICKNESS: CD CONDENSATE DRAIN FLA FULL LOAD AMPACITY Seattle,Washington 98104
<br /> Neo
<br /> HEATING ABOVE 350 .32-.34 2.5 2.5 3.0 3.5 3.5 SECTION CALLOUT: NITROUS OXIDEFLR FLOOR
<br /> 251-350 .29-.31 2.0 2.5 2.5 3.5 3.5 T TEMPERED WATER FPM FEET PER MINUTE
<br /> 201-250 .27-.30 1.5 1.5 2.0 2.0 3.5 ArhINDICATES DIRECTION OF CUTTING PLANE N2- NITROGEN (PH)206 623 9414
<br /> 141-200 .25-.29 1.5 1.5 1.5 1.5 1.5 NIF -HWS- HEATING WATER SUPPLY FT FEET/FOOT (FAX)206 623 7868
<br /> INDICATES SECTION LETTER -HD4) ZONE VALVE BOX FTU FAN TERMINAL UNIT
<br /> 105-140 .24-.28 1.0 1.0 1.0 1.5 1.5 -HWF HEATING WATER FLOW
<br /> DOMESTIC 105+ .24-.28 1.0 1.0 1.5 1.5 1.5 SHEET NUMBER WHERE SECTION IS DRAWN o MEDICAL GAS ALARM PANEL GAL GALLONS
<br /> 45-65 .24-.27 0.5 0.5 0.5 0.5 0.5 HWR HEATING WATER RETURN GPH GALLON PER HOUR Consultants
<br /> COOLING 40-55 .23-.27 0.5 0.75 1.0 1.0 1.0 -CWS- CHILLED WATER SUPPLY Q SYSTEM PRESSURE SENSOR GPM GALLONS PER MINUTE
<br /> BELOW 40 .23-.27 1.0 1.5 1.5 1.5 1.5 VENTILATION LIFE SAFETY
<br /> GW GREASE WASTE
<br /> -cWR CHILLED WATER RETURN GWB GYPSUM WALL BOARD ROLF JENSEN&ASSOCIATES
<br /> 8. INDIVIDUAL ZONE TERMINAL UNITS AND HVAC SYSTEMS SERVING PORTIONS OF DOUBLE SINGLE DESCRIPTIONNorth Creek ParkwaySuite 120
<br /> THE BUILDING HAVING LESS THAN 24-HOUR OPERATION SHALL BE SHUT OFF LCws 19125
<br /> LASER CHILLED WATER SUPPLY FIRE PROTECTION HEDV HOSE END DRAIN VALVE 19 25 Washington
<br /> DURING UNOCCUPIED PERIODS AS REQUIRED BY SECTION 1432.1 OF THE WSEC DUCT: 1ST SIZE (IN) INDICATES SIDE SHOWN,
<br /> 8011
<br /> AND AS DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES. MERL 0 0 2ND SIZE (IN) INDICATES SIDE NOT SHOWN, LCWR LASER CHILLED WATER RETURN SYMBOL DESCRIPTION HP HORSEPOWER/HIGH PRESSURE
<br /> INSIDE FREE AREA Mows MRI CHILLED WATER SUPPLY p� HOSE VALVE HW HOT WATER CIVIL ENGINEER
<br /> 9. SUPPLY AIR AND WATER TEMPERATURES SHALL BE AUTOMATICALLY RESET AS HWC HOT WATER CIRCULATING Magnusson Klemencic Associates
<br /> REQUIRED IN SECTION 1432.2.1 AND 1432.2.2 OF THE WSEC OR AS DESCRIBED +11:1+ 2-1 DOUBLE-WALL INSULATED DUCT MCWR MRI CHILLED WATER RETURN ® HOSE VALVE CABINET1301 Fifth Avenue,Suite 3200
<br /> IN THE TEMPERATURE CONTROL SEQUENCES. IA INTAKE AIR Seattle,Washington 98101-2699
<br /> 10. ALL AIR SYSTEMS SHALL BE PROVIDED WITH A 100% CAPABLE AIR ECONOMIZER I>< 0-1X1SUPPLY AIR DUCT - TURNING UP OR TOWARD Cws(s) CHILLED WATER SUPPLY SECONDARY F FIRE LINE ID INSIDE DIAMETER/INDIRECT DRAIN CAPABILITY AS REQUIRED BY THE SECTION 1413.1, 1423 AND 1433 OF THE WSEC cwR(s) IE INVERT ELEVATION
<br /> CHILLED WATER RETURN SECONDARY sD SPRINKLER DRY LANDSCAPE ARCHITECT
<br /> AND AS DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES. + Cxl MI SUPPLY AIR DUCT - TURNING DOWN OR AWAY cs CONDENSER WATER SUPPLY IN INCH Site Workshop
<br /> 11. AIR ECONOMIZERS SHALL BE CAPABLE OF PROVIDING PARTIAL COOLING EVEN -SP SPRINKLER PIPE ISO ISOLATION 927 Post Alley
<br /> UP OR TOWARD
<br /> WHEN ADDITIONAL MECHANICAL COOLING IS REQUIRED TO MEET THE REMAINDER l ,,__ '1 RETURN OR EXHAUST AIR DUCT - TURNING CR CONDENSER WATER RETURN • PENDENT HEAD KW KILOWATT Seattle,Washington 98101 OF THE COOLING LOAD. mill o -L.l RETURN OR EXHAUST AIR DUCT - TURNING NRC HEAT RECOVERY CIRCULATING A DRY PENDENT HEAD KWH KILOWATT HOUR
<br /> STRUCTURAL ENGINEER
<br /> 12. SIMULTANEOUS HEATING AND COOLING TO INDIVIDUAL ZONES SHALL BE I DOWN OR AWAY -HRS-- HEAT RECOVERY HOT WATER SUPPLY LAT LEAVING AIR TEMPERATURE
<br /> PROHIBITED AS DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES EXCEPT O UPRIGHT HEAD LBS POUNDS Magnusson Klemencic Associates
<br /> ' C ROUND DUCT - TURNING UP OR TOWARD HRR HEAT RECOVERY HOT WATER RETURN 1301 Fifth Avenue,Suite 3200
<br /> WHERE PERMITTED IN SECTION 1435, EXCEPTIONS 1 THROUGH 4 OF THE WSEC. -%,� ��� 4 SIDEWALL HEAD LP LOW PRESSURE Seattle,Washington 98101-2699
<br /> 13. VARIABLE FREQUENCY DRIVES SHALL BE PROVIDED FOR VARIABLE FLOW : • ROUND DUCT - TURNING DOWN OR AWAY HPs HEAT PUMP SUPPLY DRY SIDEWALL HEAD LVG LEAVING
<br /> a, HEATING AND AIR HANDLING SYSTEMS AS REQUIRED BY SECTION 1438 OF -Fr,- LS LOCK SHIELD MECHANICAL ENGINEER
<br /> THE WSEC AND AS DESCRIBED IN THE CONTRACT DOCUMENTS INCLUDING HPR HEAT PUMP RETURN 0 WET ALARM VALVE LWT LEAVING WATER TEMPERATURE
<br /> OVAL DUCT - TURNING UP OR TOWARD CDi Engineers
<br />' TEMPERATURE CONTROL SEQUENCES. �t� �� PCWs PROCESS CHILLED WATER SUPPLY MAX MAXIMUM 19203 36th Ave.W Suite 200
<br /> r' DRY ALARM VALVE
<br /> 14. DOMESTIC HOT WATER CIRCULATION PUMPS SHALL BE SHUT DOWN DURING ...( �r PCWP PROCESS CHILLED WATER RETURN MBH BRITISH THERMAL UNIT PER Lynnwood,Washington 98036
<br /> UNOCCUPIED PERIODS AS REQUIRED BY SECTION 1442 OF THE WSEC AND AS 0 -I it B OVAL DUCT - TURNING DOWN OR AWAY n ALARM BELL HOUR (THOUSAND)
<br /> DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES. PCws(s) PROCESS CHILLED WATER SUPPLY SECONDARY
<br /> ---2 TRANSITION H SUPERVISED VALVE MCA MINIMUM CURRENT AMPACITY ELECTRICAL ENGINEER
<br /> 15. MOTOR EFFICIENCY SHALL NOT BE LESS THAN THE MINIMUM CALLOUTS PER Pcw,$) PROCESS CHILLED WATER RETURN SECONDARY MECH MECHANICAL SPARLING
<br /> TABLE 14-4 AND SECTION 1437 OF THE WSEC FOR FULL LOAD EFFICIENCIES. FIRE DEPARTMENT CONNECTION MIN MINIMUM 720 Olive Way,Suite 1400
<br /> -F=1:3 + 2---1-0 TRANSITION - ROUND TO RECTANGULAR ----41Ps HIGH PRESSURE STEAM SUPPLY FLOW SWITCH MOD MOTOR OPERATED DAMPER Seattle,Washington 98101-1853
<br /> 16. RECORD DRAWINGS SHALL BE PROVIDED TO THE OWNER WITHIN 90 DAYS AFTER
<br /> THE DATE OF SYSTEM ACCEPTANCE AS REQUIRED BY SECTION 1416.1 OF THE WSEC. ME MPs MEDIUM PRESSURE STEAM SUPPLY MTD MOUNTED
<br /> GENERAL CONTRACTOR
<br /> THE DRAWINGS SHALL INDICATE THE LOCATION AND PERFORMANCE DATA OF �� TURNING VANES IN RECTANGULAR DUCT TURN LPs LOW PRESSURE STEAM SUPPLY INSTRUMENTATION NC NOISE CRITERIA/NORMALLY CLOSED M.A.Mortensen Company
<br /> EQUIPMENT, GENERAL CONFIGURATION OF DUCTWORK AND PIPING DISTRIBUTION -LPHS LOW PRESSURE HUMIDIFICATION STEAM ND NITROGEN DIOXIDE SENSOR 14719 N.E.29th Place
<br /> SYSTEMS, INCLUDING FLOW RATES AS A MINIMUM. SYMBOL DESCRIPTION NIC NOT IN CONTRACT Bellevue,Washington 98007
<br /> 17. OPERATION AND MAINTENANCE MANUALS SHALL BE PROVIDED TO THE OWNER AS 90° ELBOW (RADIUS = 1.5 x ELBOW DIAMETER) HCR HIGH PRESSURE CONDENSATE RETURN NO NORMALLY OPEN
<br /> REQUIRED BY SECTION 1416.2 OF THE WSEC. AS A MINIMUM, THE MANUALS MCR MEDIUM PRESSURE CONDENSATE RETURN 0 DENOTES CONTROL POINT NOM NOMINAL
<br /> SHALL INCLUDE: LCR LOW PRESSURE CONDENSATE RETURN NP NON-POTABLE
<br /> Revisions
<br /> ItA-1
<br /> 1. SUBMITTAL DATA. 2 2 RECTANGULAR BRANCH CONNECTION WITH A SUMMARY ALARM OA OUTSIDE AIR
<br /> 45° TAPER w VAPOR VENT AHU AIR HANDLING UNIT OD OUTSIDE DIAMETER
<br /> 2. OPERATION AND MAINTENANCE DATA FOR EQUIPMENT.
<br /> 3. NAMES AND ADDRESSES OF SERVICE AGENCIES.
<br /> -SRV- SAFETY RELIEF VENT Al ANALOG INPUT OFCI OWNER FURNISHED DOCUMENT RELEASE 09 11/03/08
<br /> 4. HVAC CONTOLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION. CONICAL BRANCH CONNECTION AMU AIR MEASURING UNIT CONTRACTOR INSTALLED -
<br /> PCR PUMPED CONDENSATE RETURN OR OPERATING ROOM DOCUMENT RELEASE 11 02/09/09
<br /> 5. NARRATIVE OF HOW SYSTEM IS INTENDED TO OPERATE. AO ANALOG OUTPUT
<br /> -LPHS LOW PRESSURE HUMIDIFIER SUPPLYAUX AUXILIARY DEVICE OR CONTACT ORD OVERFLOW ROOF DRAIN DOCUMENT RELEASE 13 03/09/09
<br /> 18. HVAC SYSTEMS SHALL BE BALANCED AS REQUIRED BY SECTION 1416.3 OF THE WSEC. -1,--149 45' LATERAL FITTING
<br /> 19. COMMISSIONING SHALL BE PROVIDED AND A REPORT OF COMMISSIONING BE D4 GATE VALVE CO CARBON MONOXIDE SENSOR PD PRESSURE DROP
<br /> SUBMITTED TO THE OWNER AS REQUIRED BY SECTION 1416.4 OF THE WSEC. D�4 GLOBE VALVE CO2 CARBON DIOXIDE SENSOR PDI PLUMBING AND DRAINAGE
<br /> -IF-14 g 2 0 45° LATERAL FITTING WITH 45° ELBOW CR CONTROL RELAY INSTITUTE
<br /> Dr4 BUTTERFLY VALVE CS CURRENT SENSOR PH PHASE
<br /> 8 BUTTERFLY VALVE, FLANGED POC POINT OF CONNECTION
<br /> 90° CONICAL TEE FITTING CT CURRENT TRANSMITTER PPH POUNDS PER HOUR
<br /> - J- CHECK VALVE DDC DIRECT DIGITAL CONTROL PR PUMP CONDENSATE RETURN
<br /> +-I 0 STOP BALANCING VALVE DI DIGITAL INPUT PSI POUNDS PER SQUARE INCH
<br /> POUNDS PER SQUARE INCH GAUGE
<br /> BELLMOUTH BRANCH CONNECTION DO DIGITAL OUTPUT PSIG
<br /> BALL VALVE
<br /> II' DP DIFFERENTIAL PRESSURE SWITCH RA RETURN AIR
<br /> 0k. 90° DIVERGING TEE a CIRCUIT BALANCING VALVE DPH DIFFERENTIAL PRESSURE SWITCH - RD ROOF DRAIN
<br /> PRESSURE REGULATING VALVE HIGH LIMIT RH RELATIVE HUMIDITY
<br /> il --��� PLUG VALVE DPL DIFFERENTIAL PRESSURE SWITCH - RL RAIN LEADER
<br /> 2 90° DIVERGING TEE LOW LIMIT RM ROOM
<br /> -► I- BACKFLOW PREVENTER DPS DIFFERENTIAL PRESSURE SENSOR/ RO RETURN OPENING
<br /> th '4-1 AUTOMATIC CONTROL DAMPER - TRANSMITTER RPM REVOLUTIONS PER MINUTE
<br /> OPPOSED BLADE (PROVIDE ACCESS) TWO-WAY CONTROL VALVE DPV DIFFERENTIAL PRESSURE VALVE S SOIL
<br /> PB PB THREE-WAY CONTROL VALVE ES DAMPER POSITION SA SUPPLY AIR CLOSEOUT PRINTING 04/01/12
<br /> AUTOMATIC CONTROL DAMPER -
<br /> PARALLEL BLADE ( D'4 PROVIDE ACCESS)
<br /> _■■- SOLENOID VALVE FCV FLOW CONTROL VALVE SEC SEATTLE ENERGY CODE
<br /> FM FLOW METER SF SUPPLY FAN
<br /> +-1--- . 1--F-2 VOLUME DAMPER IQ) GAS COCK FPT FREEZE PROTECTION THERMOSTAT SG SUPPLY GRILLE
<br /> SO SCREENED OPENING Drawing Title
<br /> BDD ,BOO - I= AUTOMATIC FLOW CONTROL VALVE FS FLOW SWITCH SS STAINLESS STEEL/SANITARY SEWER
<br /> 2--4--0 BACKDRAFT DAMPER -111/11- FLEXIBLE CONNECTION H HUMIDITY SENSOR SP STATIC PRESSURE/SPRINKLER PIPE MECHANICAL LEGEND
<br /> -11-- FLANGED CONNECTION ICV ISOLATION CONTROL VALVE SPEC SPECIFICATION
<br /> +i------+ 2_ COMBINATION FIRE/SMOKE DAMPER LS LEVEL SWITCH STM STEAM
<br /> (PROVIDE ACCESS) D CONCENTRIC REDUCER MOD MOTOR OPERATED DAMPER SUP SUPPLY
<br /> FD Fp '' ECCENTRIC REDUCER (TOP) NC NORMALLY CLOSED TBD TO BE DETERMINED
<br /> 0 T 2 FIRE DAMPER (PROVIDE ACCESS) NO NORMALLY OPEN TP TRAP PRIMER
<br /> SD 0
<br /> .- ECCENTRIC REDUCER (BOTTOM) TSP TOTAL STATIC PRESSURE
<br /> SMOKE DAMPER
<br /> SD2 -I I EXPANSION JOINT
<br /> PB PUSH-BUTTON NO2 NITROUS DIOXIDE TU'(S) TERMINAL UNIT (S)
<br /> R/D 0 BASKET STRAINER PI PULSE INPUT TYP TYPICAL
<br /> R/D x PIPE ANCHOR PM PULSE METER OR INITIATOR UH UNIT HEATER
<br /> ' 0----t INDICATES RISE OR DROP - UNO UNLESS NOTED OTHERWISE 3 D.40
<br /> - ALIGNMENT GUIDE RH RELATIVE HUMIDITY -,��
<br /> V VENT/VOLT I° '
<br /> IIIIIIIIIIIIIIIIIIIIIII N}It�H NH IHI FLEXIBLE DUCTWORK Y PORTABLE INSTRUMENT CONNECTION SCR SILICON RECTIFIER VD VOLUME DAMPER P, ,Yr%�SD SMOKE DETECTOR (DUCT) > Y''+� ,STRAINER VELVELOCITSS START STOP OM'
<br /> .
<br /> 1-L7r--4. 2--H-�-� FLEXIBLE CONNECTOR y START/STOP VENT STACK
<br /> 1 I STRAINER WITH BLOW-OFF VALVE T SPACE TEMPERATURE SENSOR/ VTR VENT THROUGH ROOF °`"+ ,,:-�%
<br /> 2- -SUPPLY GRILLE (SIDEWALL) ] TRANSMITTERW WASTE WATT *o AL
<br /> TEMP TEMPERATURE WASTE/
<br /> WATT
<br /> FLOW METER WB WET BULB
<br /> + --1r 0--'I-RETURN/EXHAUST GRILLE (SIDEWALL) ® HIGH PRESSURE STEAM TRAP ASSEMBLY TCV TEMPERATURE CONTROL VALVE WCO WALL CLEANOUT
<br /> TS TEMPERATURE SENSOR/ WG WATER GAGE
<br /> EXISTING COMBINATION FIRE/SMOKE DAMPER LOW PRESSURE STEAM TRAP ASSEMBLY TRANSMITTER (DUCT OR PIPE) WS WASTE STACK Date: NOVEMBER 03,2008
<br /> -Mk.- , y 1
<br /> FD INDICATES EXISTING FIRE DAMPER, c GAS METER VAV VARIABLE AIR VOLUME WSEC WASHINGTON STATE
<br /> SD INDICATES EXISTING SMOKE DAMPER VFD VARIABLE FREQUENCY DRIVE ENERGY CODE Job No: 080613.01
<br /> ® WATER METER
<br /> ZAP ZONE ALARM PANEL Drawn By: CDi
<br /> !DI CEILING DIFFUSER (FOUR-WAY AIRFLOW) FLOW METER ZVB ZONE VALVE BOX Checked By: FJ
<br /> El CEILING DIFFUSER (THREE-WAY AIRFLOW) -ill-- UNION
<br /> _ II BLIND FLANGE
<br /> ►!I CEILING DIFFUSER (TWO-WAY AIRFLOW) Drawing No.
<br /> ] PLUG AND/OR CAP
<br /> D-'-- RETURN/EXHAUST GRILLE io PIPE TURNING UP OR TOWARD
<br /> is PIPE TURNING DOWN OR AWAY
<br /> LINEAR DIFFUSER (FLOW ARROW SHOWN
<br /> ONLY IF AIRFLOW IS ONE DIRECTIONAL PRESSURE GAUGE
<br /> MO.02
<br /> THERMOMETER M 0
<br /> 02
<br /> SHEET ISSUED FOR REFERENCE
<br /> 1700 13th St-PGMC 2nD Floor Surgery-B1406-017
<br />
|