|
,,,....,
<br /> GENERAL NOTES AND DRAWING LIST W.
<br /> W ,,,....,
<br /> GENERAL ELECTRICAL NOTES COMMUNICATIONS PATHWAY NOTES DRAWING LIST
<br /> 1. COMPLY WITH NATIONAL ELECTRICAL CODE 2005 EDITION AND AIA 2006 GUIDELINES FOR HEALTHCARE. 1. COORDINATE INSTALLATION OF CONDUITS,LOW VOLTAGE SYSTEMS CABLE SUPPORTS,AND CABLE TRAYS E0.00 SYMBOLS AND ABBREVIATIONS E4.01B HOSPITAL LOW VOLTAGE PLAN,LEVEL B,SECTOR A
<br /> Z r0
<br /> WITH OTHER COMPONENTS AND SYSTEMS EQUIPMENT INSTALLED WITHIN CEILING AREAS. A E0.01 GENERAL NOTES AND DRAWING LIST E4.02B HOSPITAL LOW VOLTAGE PLAN,LEVEL B,SECTOR B
<br /> 2. THE LOCATIONS OF ELECTRICAL DEVICES OR LIGHTING FIXTURES INDICATED ON ARCHITECTURAL PLANS
<br /> /I ,E0.02 HOSPITAL PANEL SCHEDULES AND LIGHTING FIXTURE SCHEDULE E4.03B HOSPITAL LOW VOLTAGE PLAN,LEVEL B,SECTOR C la j .......
<br /> ELEVATIONS OR SECTIONS TAKE PRECEDENCE OVER LOCATIONS INDICATED ON THE ELECTRICAL 2. REFER TO SPECIFICATION DIVISION 27 FOR INSTALLATION INSTRUCTIONS FOR CONDUITS,LOW VOLTAGE ' '' • ' .` ,' E4.04,, HOSPITAL LOW VOLTAGE PLAN,LEVEL B,SECTOR D
<br /> DRAWINGS. SYSTEMS CABLE SUPPORTS,CABLE TRAYS,PULL BOXES AND FLOOR BOXES. 7" E0.05 HOSPITAL LOAD PANEL
<br /> SUMMARY SCHEULES AND LIGHTING FIXTURE SCHEDULE EE4.05B 4.0.ES LOW VOLTAGE PLAN,LEVEL B,SECTOR E
<br /> 0 .5.'14.
<br /> HOSPITAL LOW VOLTAGE PLAN,LEVEL B,SECTOR F
<br /> E0.06 ELECTRICAL SPECIFICATIONS E4.01 HOSPITAL LOW VOLTAGE PLAN,LEVEL G,SECTOR A
<br /> 3. REFER TO THE ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LIGHTING FIXTURE LOCATIONS. 3. MAINTAIN MINIMUM BEND RADIUS OF 10X O.D.FOR CONDUITS GREATER THAN 2"DIAMETER.MAINTAIN E4.02 HOSPITAL LOW VOLTAGE PLAN,LEVEL G,SECTOR B
<br /> MINIMUM BEND RADIUS OF 6X 0.0.FOR CONDUITS GREATER THAN 1"DIAMETER. E1.00 OVERALL ELECTRICAL SITE PLAN E4.03 HOSPITAL LOW VOLTAGE PLAN,LEVEL G,SECTOR C
<br /> 4. NOT ALL SYMBOLS SHOWN ON THIS DRAWING ARE USED IN THIS DRAWING SET. E1.02 SOUTH ELECTRICAL SITE PLAN E4.04 HOSPITAL LOW VOLTAGE PLAN,LEVEL G,SECTOR D
<br /> 4. REAM THE ENDS OF ALL CONDUITS AND INSTALL WITH A GROUNDING LOCKNUT AND PLASTIC BUSHING. E1.03 SOUTH SITE LIGHTING PLAN E4.05 HOSPITAL LOW VOLTAGE PLAN,LEVEL G,SECTOR E
<br /> 5. FOR LIGHTING CONTROLS WHICH INCLUDE DAYLIGHT OR OCCUPANT SENSING AUTOMATIC CONTROLS, E1.200 EXISTING HOSPITAL ELECTRICAL DEMOUTION PLAN,PARTIAL GROUND FLOOR E4.06 HOSPITAL LOW VOLTAGE PLAN,LEVEL G,SECTOR F 4'-'; C '
<br /> AUTOMATIC SHUT-OFF CONTROLS,OCCUPANCY SENSORS OR AUTOMATIC TIME SWITCHES THE LIGHTING 5. GROUND ALL CONDUITS AND CABLE TRAYS TO APPROPRIATE COMMUNICATIONS GROUNDING BUSBAR. E1.300 EXISTING MOB ELECTRICAL DEMOLITION PLANS E4.07 HOSPITAL LOW VOLTAGE PLANS,TYPICAL LEVEL G ROOMS
<br /> CONTROLS SHALL BE TESTED TO ENSURE THAT CONTROL DEVICES,COMPONENTS,EQUIPMENT AN E4.11 HOSPITAL LOW VOLTAGE PLAN,LEVEL 1,SECTOR A
<br /> SYSTEMS ARE CALIBRATED,ADJUSTED AND OPERATE IN ACCORDANCE WITH PROJECT PLANS AND 6. INSTALL AND LEAVE IN PLACE A NYLON PULL CORD IN ALL CONDUITS. E2.01B HOSPITAL LIGHTING PLAN,LEVEL B,SECTOR A E4.12 HOSPITAL LOW VOLTAGE PLAN,LEVEL 1,SECTOR B
<br /> t' " '34 an",
<br /> SPECIFICATIONS. SEQUENCE OF OPERATION SHALL ALSO BE FUNCTIONALLY TESTED TO ENSURE IT IS E2.02B HOSPITAL LIGHTING PLAN,LEVEL B,SECTOR B E4.13 HOSPITAL LOW VOLTAGE PLAN,LEVEL 1,SECTOR C
<br /> OPERATING IN ACCORDANCE WITH PROJECT PLANS AND SPECIFICATIONS. A COMPLETE REPORT OF 7. INSTALL CABLE TRAYS AT A MINIMUM OF 6"FROM CORRIDOR WALLS. E2.03B HOSPITAL LIGHTING PLAN,LEVEL B,SECTOR C E4.14 HOSPITAL LOW VOLTAGE PLAN,LEVEL 1,SECTOR Dt' (*.I) '''
<br /> TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND FILED WITH THE OWNER. E2.04B HOSPITAL LIGHTING PLAN,LEVEL B,SECTOR D E4.15 HOSPITAL LOW VOLTAGE PLAN,LEVEL 1,SECTOR E
<br /> E2.05B HOSPITAL LIGHTING PLAN,LEVEL B,SECTOR E E4.16 HOSPITAL LOW VOLTAGE PLAN,LEVEL 1,SECTOR F
<br /> 8. REFER TO SPEC SECTION 270528.33 TO DETERMINE WHICH TELECOM OUTLET LOCATIONS WILL BE E2.06B HOSPITAL LIGHTING PLAN,LEVEL B,SECTOR F E4.17 HOSPITAL LOW VOLTAGE PLAN,LEVEL 1,SECTOR G
<br /> 10
<br /> 6. COORDINATE ALL WALL-MOUNTED DEVICES AND EQUIPMENT WITH ARCHITECT PRIOR TO ROUGH-IN. PROVIDED WITH A BOX AND CONDUIT STUB UP AND WHICH TELECOM OUTLET LOCATIONS WILL BE E2.01 HOSPITAL LIGHTING PLAN,LEVEL G,SECTOR A E4.21 HOSPITAL LOW VOLTAGE PLAN,LEVEL 2,SECTOR A
<br /> HOSPITAL LOW VOLTAGE PLAN,LEVEL 2,SECTOR B
<br /> .02 HOSPITAL LIGHTING PLAN,LEVEL G SECTOR B `� "`'<<
<br /> PROVIDED WITH A PULL STRING ONLY. EZ � E4.22
<br /> 7. PROVIDE A#12 GREEN GROUNDING CONDUCTOR(MINIMUM SIZE)FOR ALL 120V AND ALL 277 POWER E2.03 HOSPITAL LIGHTING PLAN,LEVEL G,SECTOR C E4.23 HOSPITAL LOW VOLTAGE PLAN,LEVEL 2,SECTOR C
<br /> AND LIGHTING BRANCH CIRCUITS. 9. REFER TO MECHANICAL DRAWINGS FOR HVAC DUCTWORK AND PLUMBING ROUTING DETAILS AND E2.04 HOSPITAL LIGHTING PLAN,LEVEL G,SECTOR D E4.24 HOSPITAL LOW VOLTAGE PLAN,LEVEL 2,SECTOR D
<br /> COORDINATE WITH MECHANICAL CONTRACTOR PRIOR TO PERFORMING PATHWAY ROUGH-IN WORK. E2.05 HOSPITAL LIGHTING PLAN,LEVEL G,SECTOR E E4.25 HOSPITAL LOW VOLTAGE PLAN,LEVEL 2,SECTOR E
<br /> 8. MULTIWIRE BRANCH CIRCUITS NOT PERMITTED.PROVIDE DEDICATED NEUTRAL CONDUCTOR FOR EACH E2.06 HOSPITAL LIGHTING PLAN,LEVEL G,SECTOR F E4.26 HOSPITAL LOW VOLTAGE PLAN,LEVEL 2,SECTOR F
<br /> CIRCUIT. 10. THREE 90 DEGREE BENDS MAY BE ALLOWED IF TOTAL CONDUIT LENGTH IS NOT MORE THAN 33 FEET OR E2.07 HOSPITAL LIGHTING PLAN,LEVEL G,SECTOR D EAST E4.27 HOSPITAL LOW VOLTAGE PLAN,LEVEL 2,SECTOR G
<br /> E2.08 HOSPITAL UGHTING PLAN,LEVEL G,SECTOR F SOUTH E4.28 EXISTING HOSPITAL LOW VOLTAGE PLAN,LEVEL 3,SECTOR G
<br /> CONDUIT IS INCREASED TO NEXT TRADE SIZE.CONDUIT BENDS SHALL CONFORM TO ACCEPTED RADII FOR E2.11 HOSPITAL LIGHTING PLAN,LEVEL 1,SECTOR A E4.28C HOSPITAL LOW VOLTAGE PLAN,CANCER CENTER BRIDGE WAS ,'TON
<br /> 9. FOR ALL 277 CIRCUITS EXCEEDING 300 FEET AND ALL 120V CIRCUITS EXCEEDING 100 FEET IN LENGTH, THE SIZE OF CONDUIT USED.THERE SHALL BE NO MORE THAN 270-DEGREES OF BEND IN ANY ONE E2.12 HOSPITAL UGHTING PLAN,LEVEL 1,SECTOR B HOSPITAL LOW VOLTAGE PLANS,TYPICAL LEVELS 2 AND 3 ROOMS
<br /> CONTRACTOR SHALL INCREASE THE INDICATED CONDUCTORS BY ONE SIZE(MINIMUM)TO COMPENSATE CONDUIT RUN WITHOUT INCLUSION OF A PULL BOX. E4.39
<br /> E2.13 HOSPITAL LIGHTING PLAN,LEVEL 1,SECTOR C E4.31 HOSPITAL LOW VOLTAGE PLAN,LEVEL 3,SECTOR A
<br /> FOR VOLTAGE DROP. E2.14 HOSPITAL LIGHTING PLAN,LEVEL 1,SECTOR D E4.32 HOSPITAL LOW VOLTAGE PLAN,LEVEL 3,SECTOR B
<br /> 10. LOCATE AND ROUTE ALL RACEWAYS AWAY FROM MECHANICAL ACCESS AREAS SO THAT RACEWAYS DO 11. ALL ELECTRICAL RACEWAYS,DEVICES AND FLUSH MOUNTED UNLESS OTHERWISE NOTED. E2.16
<br /> BOXES IN CONCRETE AND CMU WALL SHALL BE E2.15 HOSPITAL LIGHTING PLAN,LEVEL E2.16 HOSPITAL LIGHTING PLAN,LEVEL 1,SECTOR F E4.34 SECTOR E E4.33 HOSPITAL LOW VOLTAGE PLAN,LEVEL 3,SECTOR C Gv[\]S,l.
<br /> HOSPITAL LOW VOLTAGE PLAN,LEVEL 3,SECTOR D
<br /> NOT BLOCK ACCESS TO SMOKE/FIRE DAMPERS,VALVES,HVAC TERMINAL BOXES,FILTER BOXES,OR E2.17 HOSPITAL UGHTING PLAN,LEVEL 1,SECTOR G E4.35 HOSPITAL LOW VOLTAGE PLAN,LEVEL 3,SECTOR ES'S-2
<br /> OTHER ABOVE CEILING EQUIPMENT REQUIRING ACCESS. SEE ARCHITECTURAL REFLECTED CEILING PLAN 12. RACEWAYS SHALL NOT BE INSTALLED IN CONCRETE FLOOR OR CEILING SLABS EXCEPT WHERE E2.18 HOSPITAL LIGHTING PLAN,LEVEL 1,SECTOR A WEST E4.36 HOSPITAL LOW VOLTAGE PLAN,LEVEL 3,SECTOR F
<br /> FOR MOST LOCATIONS OF ACCESS TILES AND ACCESS PANELS. COORDINATE WITH MECHANICAL AS SPECIFICALLY INDICATED. E2.19 HOSPITAL LIGHTING PLAN,LEVEL 1,SECTOR D EAST E4.37 HOSPITAL LOW VOLTAGE PLAN,LEVEL 3,SECTOR G
<br /> REQUIRED. E2.21 HOSPITAL LIGHTING PLAN,LEVEL 2,SECTOR A E4.41 HOSPITAL LOW VOLTAGE PLAN,LEVEL 4,SECTOR A
<br /> 13. REFER TO ARCHITECTURAL DRAWING LS SERIES LIFE SAFETY PLAN FOR FIRE RATED WALLS ON LEVELS B E2.22 HOSPITAL LIGHTING PLAN,LEVEL 2,SECTOR B E4.42 HOSPITAL LOW VOLTAGE PLAN,LEVEL 4,SECTOR B --- f
<br /> 11. PROVIDE A PULL STRING FROM END TO END IN ALL SPARE RACEWAYS PROVIDED UNDER THIS THROUGH ROOF. E2.23 HOSPITAL LIGHTING PLAN,LEVEL 2,SECTOR C ,42m HOSPITAL LOW VOLTAGE PLAN,LEVEL 4 MEZZANINE,SECTOR B N
<br /> E2.24 HOSPITAL LIGHTING PLAN,LEVEL 2,SECTOR D E4.43 HOSPITAL LOW VOLTAGE PLAN,LEVEL 4,SECTOR C
<br /> CONTRACT. E2.25 HOSPITAL LIGHTING PLAN,LEVEL 2,SECTOR E E4.44 HOSPITAL LOW VOLTAGE PLAN,LEVEL 4,SECTOR D �ir C
<br /> E2.26 HOSPITAL LIGHTING PLAN,LEVEL 2,SECTOR F E4.45 HOSPITAL LOW VOLTAGE PLAN,LEVEL 4,SECTOR E
<br /> 12. COORDINATE ALL RACEWAY ROUTING,CIRCUIT CONNECTIONS,ETC.WITH ALL MATCHLINES INDICATED. E2.27 HOSPITAL LIGHTING PLAN,LEVEL 2,SECTOR G E4.4i6 HOSPITAL LOW VOLTAGE PLAN,LEVEL 4,SECTOR F (),T EC�S��
<br /> E2.28 EXISTING HOSPITAL LIGHTING PLAN,LEVEL 3,SECTOR G E4.51 HOSPITAL LOW VOLTAGE PLAN,LEVEL 5,SECTOR A
<br /> 13. PROVIDE TAMPER RESISTANT RECEPTACLES FOR ALL DEVICES UNDER 42"AFF IN PATIENT CARE AREAS, E2.28C HOSPITAL LIGHTING PLAN,CANCER CENTER BRIDGE E4.52 HOSPITAL LOW VOLTAGE PLAN,LEVEL 5,SECTOR B
<br /> WAITING ROOMS,CONSULT ROOMS,FAMILY/QUIET ROOMS,ETC.AND ELSEWHERE AS REQUIRED BY E2.31 HOSPITAL LIGHTING PLAN,LEVEL 3,SECTOR A E4.53 HOSPITAL LOW VOLTAGE PLAN,LEVEL 5,SECTOR C
<br /> ADOPTED CODES AND RELEVANT GUIDELINES. TAMPER RESISTANT RECEPTACLES SHALL NOT BE E2.32 HOSPITAL LIGHTING PLAN,LEVEL 3,SECTOR B E4.54 HOSPITAL LOW VOLTAGE PLAN,LEVEL 5,SECTOR D Ardlss s/MN./b.tr D
<br /> INSTALLED AT ANY PATIENT ROOM HEADWALLS. E2.33 HOSPITAL LIGHTING PLAN,LEVEL 3,SECTOR C E4.56 HOSPITAL LOW VOLTAGE PLAN,LEVEL 5,SECTOR F RAW Soli Los AN ss Wirier DC
<br /> E2.34 HOSPITAL LIGHTING PLAN,LEVEL 3,SECTOR D E4.61 HOSPITAL LOW VOLTAGE PLAN,LEVEL 6,SECTOR A
<br /> 14. HOMERUNS WITH MULTIPLE CIRCUITS HAVE PHASE CONDUCTORS INDICATED VIA"TICK MARKS." NOT E2.35 HOSPITAL LIGHTING PLAN,LEVEL 3,SECTOR E E4.63 HOSPITAL LOW VOLTAGE PLAN,LEVEL 6,SECTOR B 925 Forth Ave.,,Sake 2400
<br /> E2.36 HOSPITAL LIGHTING PLAN,LEVEL 3,SECTOR F E4.63 HOSPITAL LOW VOLTAGE PLAN,LEVEL 6,SECTOR C
<br /> ALL TICK MARKS FOR CIRCUIT CONDUCTORS HAVE BEEN SHOWN ON BRANCH CIRCUITING. CONTRACTOR E2.37 HOSPITAL LIGHTING PLAN,LEVEL 3,SECTOR G E4.64 HOSPITAL LOW VOLTAGE PLAN,LEVEL 6,SECTOR D Seattle,Washington 98104
<br /> SHALL FOLLOW CIRCUITS OUT TO END OF BRANCH CIRCUIT AND PROVIDE FOR THE APPROPRIATE COMMUNICATIONS OUTLET NOTES E2.41 HOSPITAL LIGHTING PLAN,LEVEL 4,SECTOR A E4.66 HOSPITAL LOW VOLTAGE PLAN,LEVEL 6,SECTOR F
<br /> NUMBERS OF CIRCUITS AND QUANTITIES OF CONDUCTORS AS REQUIRED BY BRANCH CIRCUITING SHOWN. E2.42 HOSPITAL LIGHTING PLAN,LEVEL 4,SECTOR B E4.67 HOSPITAL LOW VOLTAGE PLANS,TYPICAL LEVELS 6-10 ROOMS
<br /> 1. THE LOCATIONS AND MOUNTING HEIGHT OF COMMUNICATION OUTLETS INDICATED ON ARCHITECTURAL E2.42M HOSPITAL UGHTING PLAN,LEVEL 4 MEZZANINE,SECTOR B E4.71 HOSPITAL LOW VOLTAGE PLAN,LEVEL 7,SECTOR A 206 623 9414
<br /> 15. ALL PANELS,DISCONNECTS,CIRCUIT BREAKERS/ENCLOSURES,TRANSFORMERS,ETC.SHALL BE OF E2.43 HOSPITAL LIGHTING PLAN,LEVEL 4,SECTOR C E4.72 HOSPITAL LOW VOLTAGE PLAN,LEVEL 7,SECTOR B (F 206 623 7568
<br /> SAME MANUFACTURER. PLANS,INTERIOR ELEVATIONS AND/OR SECTIONS TAKE PRECEDENCE OVER LOCATIONS INDICATED ON THE E2.44 HOSPITAL LIGHTING PLAN,LEVEL 4,SECTOR D E4.73 HOSPITAL LOW VOLTAGE PLAN,LEVEL 7,SECTOR C
<br /> TELECOM DRAWINGS AND COMMUNICATIONS OUTLET SCHEDULES. COORDINATE BEFORE PERFORMING E2.45 HOSPITAL LIGHTING PLAN,LEVEL 4,SECTOR E E4.74 HOSPITAL LOW VOLTAGE PLAN,LEVEL 7,SECTOR D
<br /> 16. THE FIRST EMERGENCY GENERATOR STARTS AND LOADS TRANSFER WITHIN 10 SECONDS PER NFPA ROUGH-IN WORK. E2.46 HOSPITAL LIGHTING PLAN,LEVEL 4,SECTOR F E4.76 HOSPITAL LOW VOLTAGE PLAN,LEVEL 7,SECTOR F
<br /> REQUIREMENTS. LIFE SAFETY AND CRITICAL LOADS IN THE CRITICAL CARE AREAS ARE E2.51 HOSPITAL LIGHTING PLAN,LEVEL 5,SECTOR A E4.81 HOSPITAL LOW VOLTAGE PLAN,LEVEL 8,SECTOR A
<br /> 2. CONTRACTOR TO COORDINATE FINAL MOUNTING HEIGHT,LOCATION,&DIMENSIONS OF DDC,FIRE ALARM, E2.52 HOSPITAL LIGHTING PLAN,LEVEL 5,SECTOR B E4,82 HOSPITAL LOW VOLTAGE PLAN,LEVEL 8,SECTOR B
<br /> PRIORITIZED FOR THE FIRST EMERGENCY GENERATOR PER NFPA 99 REQUIREMENTS. SECURITY AND ELEVATOR COMMUNICATIONS OUTLETS IN THE FIELD WITH EQUIPMENT VENDOR PRIOR TO E2.53 HOSPITAL LIGHTING PLAN,LEVEL 5,SECTOR C HOSPITAL LOW VOLTAGE PLAN,LEVEL 8,SECTOR C
<br /> E4.83
<br /> PERFORMING ROUGH-IN WORK. E2.54 HOSPITAL LIGHTING PLAN,LEVEL 5,SECTOR D E4.84 HOSPITAL LOW VOLTAGE PLAN,LEVEL 8,SECTOR 0
<br /> LIT SAFETY17. THE EMERGENCY GENERATORS HAVE 96 HOURS OF FUEL SUPPLY. E2.55 HOSPITAL LIGHTING PLAN,LEVEL 5,SECTOR E E4.86 HOSPITAL LOW VOLTAGE PLAN,LEVEL 8,SECTOR F ROLF JENSB 1&ASSOCIATES
<br /> E2.56 HOSPITAL LIGHTING PLAN,LEVEL 5,SECTOR F HOSPITAL LOW VOLTAGE PLAN,LEVEL 9,SECTOR A
<br /> 3. REFER TO ARCHITECTURAL FURNITURE AND CASEWORK PLANS FOR ROUTING OF CABLES BETWEENE4.9119125 North Creek parkway Ste 120
<br /> 18. ALL PANELS HAVE BEEN RATED FOR THE AVAILABLE FAULT CURRENT. SEE CALCULATED FAULT CONDUIT INFEED AND FINAL OUTLET LOCATIONS.
<br /> E2.61 HOSPITAL LIGHTING PLAN,LEVEL 6,SECTOR A E4.g2 HOSPITAL LOW VOLTAGE PLAN,LEVEL 9,SECTOR B �, ■ W 98011
<br /> CURRENT VALUES SHOWN ON THE POWER RISER DIAGRAMS AND THE PANEL SCHEDULES. E2.62 HOSPITAL LIGHTING PLAN,LEVEL 6,SECTOR B E4.93 HOSPITAL LOW VOLTAGE PLAN,LEVEL 9,SECTOR C
<br /> E2.63 HOSPITAL LIGHTING PLAN,LEVEL 6,SECTOR C E4.94 HOSPITAL LOW VOLTAGE PLAN,LEVEL 9,SECTOR D
<br /> 19. ALL POWER CIRCUITS RUN IN SLAB OF BUILDING TO BE INSTALLED IN PVC OR RIGID STEEL CONDUIT.
<br /> 4. REFER TO ARCHITECTURAL DRAWINGS FOR AREA OF REFUGE(AOR)LOCATIONS/SIGNAGE.LOCATIONS 3 E2.64 HOSPITAL LIGHTING PLAN,LEVEL 6,SECTOR D E4.96 HOSPITAL LOW VOLTAGE PLAN,LEVEL 9,SECTOR F 2VL
<br /> EXCEPTION:ALL EMERGENCY POWER CONDUIT SERVING PATIENT CARE AREAS SHALL BE NON-FLEXIBLE SHOWN ON"A"SERIES DRAWINGS TAKE PRECEDENCE OVER THOSE SHOWN ON"E4"SERIES. E2.66 HOSPITAL LIGHTING PLAN,LEVEL 6,SECTOR F E4.101 HOSPITAL LOW VOLTAGE PLAN,LEVEL 10,SECTOR A
<br /> E2.67 HOSPITAL LIGHTING PLANS,TYPICAL LEVELS 6-10 ROOMS E4.102 HOSPITAL LOW VOLTAGE PLAN,LEVEL 10,SECTOR B M I c Associates
<br /> METAL CONDUIT. E2.71 HOSPITAL LIGHTING PLAN,LEVEL 7,SECTOR A E4.103 HOSPITAL LOW VOLTAGE PLAN,LEVEL 10,SECTOR C 1301 Fifth Avenue,Suite 3200
<br /> E2.72 HOSPITAL LIGHTING PLAN,LEVEL 7,SECTOR B E4.104 HOSPITAL LOW VOLTAGE PLAN,LEVEL 10,SECTOR D Seattle W 98101-26 9
<br /> 20. POWER UTILITY COMPANY IS SNOHOMISH COUNTY PUD.CONTACT NICK FADICH(425-783-4363)OR E2.73 HOSPITAL LIGHTING PLAN,LEVEL 7,SECTOR C E4.106 HOSPITAL LOW VOLTAGE PLAN,LEVEL 10,SECTOR F
<br /> FOREST BIGENHO(425-783-5031). E2.74 HOSPITAL LIGHTING PLAN,LEVEL 7,SECTOR D E4.101R HOSPITAL LOW VOLTAGE PLAN,ROOF LEVEL,SECTOR A
<br /> E2.76 HOSPITAL LIGHTING PLAN,LEVEL 7,SECTOR F E4.102R HOSPITAL LOW VOLTAGE PLAN,ROOF LEVEL,SECTOR B I AN INCAPE ARCIINCT
<br /> 21. THE FOLLOWING ALTERNATES DETAILED IN THIS AND OTHER DISCIPLINES.PACKAGES SHALL HAVE AN E2.81 HOSPITAL UGHTING PLAN,LEVEL 8,SECTOR A E4.103R HOSPITAL LOW VOLTAGE PLAN,ROOF LEVEL,SECTOR C
<br /> ELECTRICAL COMPONENT INCLUDED IN PRICING: E2.82 HOSPITAL LIGHTING PLAN,LEVEL 8,SECTOR B E4.104R HOSPITAL LOW VOLTAGE PLAN,ROOF LEVEL,SECTOR D Sloe Workshop
<br /> E2.83 HOSPITAL LIGHTING PLAN,LEVEL 8,SECTOR C E4.106R HOSPITAL LOW VOLTAGE PLAN,ROOF LEVEL,SECTOR F 927 Post
<br /> -PHARMACY PNEUMATIC TUBE KIOSK E2.84 HOSPITAL LIGHTING PLAN,LEVEL 8,SECTOR D E4.102MR HOSPITAL LOW VOLTAGE PLAN,ELEVATOR MACHINE ROOM LEVEL,SECTOR BEXISIING Seattle,WZngton 98101
<br /> -ONE OPTIONAL BRANCH TRANSFER SWITCH IN TOWER(ATS-03) E2.86 HOSPITAL LIGHTING PLAN,LEVEL 8,SECTOR F E4.200 HOSPITAL LOW VOLTAGE PLAN,PARTIAL FIRST FLOOR
<br /> -OUTLET BOXES AND CORDS FOR SURGE SPACE CONNECTIONS TO SPIDER BOXES E2.91 HOSPITAL LIGHTING PLAN,LEVEL 9,SECTOR A
<br /> -COMBINATION SMART/PROXIMITY CARD READERS AND CARDS FOR ACCESS CONTROL(REFER TO E2.92 HOSPITAL LIGHTING PLAN,LEVEL 9,SECTOR B Ea. HOSPITAL RAD ROOM CO203 EQUIPMENT PANS STRUCTURAL ENGINEER
<br /> SECTION 281300,PARAGRAPHS 2.3A3 AND 2.4A2). E2.93 HOSPITAL LIGHTING PLAN,LEVEL 9,SECTOR C E5.020 HOSPITAL RAD ROOM F0205 EQUIPMENT PLANS
<br /> -INTEGRAL CARD READERS ON SELECTED DOOR HARDWARE(REFER TO SCHEDULE,SHEET T9.00) E2.94 HOSPITAL LIGHTING PLAN,LEVEL 9,SECTOR D E5.030 HOSPITAL CT PROCEDURE F0265 EQUIPMENT PANSKiemendc Associates
<br /> E2.96 HOSPITAL LIGHTING PLAN,LEVEL 9,SECTOR F HOSPITAL CT PROCEDURE 81081 EQUIPMENT PLANS 1 1 FRtl Averase Slate 3200
<br /> -DIGITAL METERING SYSTEM(REFER TO SECTION 260575,PARAGRAPH 1.2) E2.101 HOSPITAL LIGHTING PLAN,LEVEL 10,SECTOR A E5.115 HOSPITAL CT PROCEDURE B1083 EQUIPMENT PLANS Seattle,Washington 98101-2699
<br /> E2.102 HOSPITAL LIGHTING PLAN,LEVEL 10,SECTOR B E5.120 HOSPITAL CT PROCEDURE B1085 EQUIPMENT PLANS
<br /> E2.103 HOSPITAL LIGHTING PLAN,LEVEL 10,SECTOR C E5.125 HOSPITAL MRI C1097 EQUIPMENT PLANS
<br /> _� E2.104 HOSPITAL LIGHTING PLAN,LEVEL 10,SECTOR D E5.130 HOSPITAL C-ARM E1171 EQUIPMENT PLANS MECHANICAL ENG/NEM
<br /> E2.106 HOSPITAL LIGHTING PLAN,LEVEL 10,SECTOR F E5.135 HOSPITAL R/F ROOM E1172 EQUIPMENT PLANS
<br /> E2.101R HOSPITAL LIGHTING PLAN,ROOF LEVEL,SECTOR A E5.140 HOSPITAL R/F ROOM E1198 EQUIPMENT PLANS COIE
<br /> , E2.102R HOSPITAL LIGHTING PLAN,ROOF LEVEL,SECTOR B E5.145 HOSPITAL RAD ROOM E1175 EQUIPMENT PANS
<br /> �_.. , 4200 Oh Street S.W,SWte200
<br /> E2.103R HOSPITAL LIGHTING PLAN,ROOF LEVEL,SECTOR C E5.150 HOSPITAL RAD ROOM E1177 EQUIPMENT PLANS Lynnwood,Washington 98036
<br /> E2.104R HOSPITAL LIGHTING PLAN,ROOF LEVEL,SECTOR D E5.155 HOSPITAL RAD ROOM E1191 EQUIPMENT PLANS
<br /> i E2.106R HOSPITAL UGHTING PLAN,ROOF LEVEL,SECTOR F
<br /> E5.160 HOSPITAL NM SCAN C1145 EQUIPMENT PLANS ELECTRICAL
<br /> E2.102MR HOSPITAL LIGHTING PLAN,ELEVATOR MACHINE ROOM LEVEL,SECTOR B E5.165 HOSPITAL NM SCAN C1146 EQUIPMENT PLANS
<br /> E2.200 EXISTING HOSPITAL LIGHTING PLAN,PARTIAL FIRST FLOOR A E5.170 HOSPITAL NM SCAN C1147 EQUIPMENT PLANS SPARING
<br /> E5.175 HOSPITAL MRI C1101 EQUIPMENT PLANS 720 Olive Way,Suite 1400
<br /> E3.01B HOSPITAL POWER PLAN,LEVEL B,SECTOR A E5.180 HOSPITAL NM SCAN E1206B EQUIPMENT PLANS
<br /> E3.02B HOSPITAL POWER PLAN,LEVEL B,SECTOR B E5.310 HOSPITAL CATH LAB 83176 EQUIPMENT PLANS Seattle,Washington 98101-18101
<br /> E3.0313 HOSPITALPOWER PLAN,LEVEL B,SECTOR C E5.320 HOSPITAL CATH LAB E3192 EQUIPMENT PLANS
<br /> E3.04B HOSPITAL POWER PLAN,LEVEL B,SECTOR D E5.330 HOSPITAL CATH LAB E3193 EQUIPMENT PLANS C�rrRACTaR
<br /> E3.05B HOSPITAL POWER PLAN,LEVEL B,SECTOR E E5.340 HOSPITAL EP LAB E3191 EQUIPMENT PLANS
<br /> E3.06B HOSPITAL POWER PLAN,LEVEL B,SECTOR F E5.350 HOSPITAL IR ROOM E3197 EQUIPMENT PLANS M.A.Mortenson Company
<br /> E5.360 HOSPITAL IR ROOM E3204 EQUIPMENT PLANS 14719 NE.29th Place
<br /> E3.01 HOSPITAL POWER PLAN,LEVEL G,SECTOR A � E5.370 HOSPITAL IR ROOM E3205 EQUIPMENT PLANS Belevue,Washington 98007
<br /> E3.02 HOSPITAL POWER PLAN,LEVEL G,SECTOR B '/J) E5.380 HOSPITAL VASO HYBRID OR E3203 EQUIPMENT PLANS
<br /> E3.03 HOSPITAL POWER PLAN,LEVEL G,SECTOR C E6.00B HOSPITAL FEEDER PLAN,LEVEL B
<br /> E3.04 HOSPITAL POWER PLAN,LEVEL G,SECTOR D E6.00 HOSPITAL FEEDER PLAN,LEVEL G
<br /> E3.05 HOSPITAL POWER PLAN,LEVEL G,SECTOR E E6.10 HOSPITAL FEEDER PLAN,LEVEL 1 Rsvrroos
<br /> E3.06 HOSPITAL POWER PLAN,LEVEL G,SECTOR F E6.20 HOSPITAL FEEDER PLAN,LEVEL 2
<br /> E3.07 HOSPITAL POWER PLANS,TYPICAL LEVEL G ROOMS E6.30 HOSPITAL FEEDER PLAN,LEVEL 3
<br /> E3.07B HOSPITAL KITCHEN EQUIPMENT POWER PLAN E6.40 HOSPITAL FEEDER PLAN,LEVEL 4
<br /> E3.08B HOSPITAL KITCHEN EQUIPMENT CONNECTION SCHEDULE E6.50 HOSPITAL FEEDER PLAN,LEVEL 5
<br /> E3.11 HOSPITAL POWER PLAN,LEVEL 1,SECTOR A E6.60 HOSPITAL FEEDER PLAN,LEVEL 6 DOCUMENT RELEASE 09 11/03/08
<br /> E3.12 HOSPITAL POWER PLAN,LEVEL 1,SECTOR B E6.70 HOSPITAL FEEDER PLAN,LEVEL 7
<br /> E3.13 HOSPITAL POWER PLAN,LEVEL 1,SECTOR C E6.80 HOSPITAL FEEDER PLAN,LEVEL 8 DOCUMENT RELEASE 11 02/09/09
<br /> E3.14 HOSPITAL POWER PLAN,LEVEL 1,SECTOR D E6.90 HOSPITAL FEEDER PLAN,LEVEL 9
<br /> E3.15 HOSPITAL POWER PLAN,LEVEL 1,SECTOR E E6.100 HOSPITAL FEEDER PLAN,LEVEL 10
<br /> E3.16 HOSPITAL POWER PLAN,LEVEL 1,SECTOR F E6.10OR HOSPITAL FEEDER PLAN,ROOF LEVEL DOCUMENT RELEASE 13 03/09/09
<br /> E3.17 HOSPITAL POWER PLAN,LEVEL 1,SECTOR G E6.200 EXISTING HOSPITAL FEEDER PLAN,FIRST FLOOR DR16/ADDENDUM 3 04/06/09
<br /> E3.21 HOSPITAL POWER PLAN,LEVEL 2,SECTOR A E6.210 EXISTING HOSPITAL FEEDER PLAN,SECOND FLOOR
<br /> E3.22 HOSPITAL POWER PLAN,LEVEL 2,SECTOR B
<br /> E3.23 HOSPITAL POWER PLAN,LEVEL 2,SECTOR C E7.01 ENLARGED ELECTRICAL ROOM PLANS LEVEL B 10 WORK PROPOSAL 19 11/25/09
<br /> E3.24 HOSPITAL POWER PLAN,LEVEL 2,SECTOR D E7.02 ENLARGED ELECTRICAL ROOM PLANS LEVELS G,1,2,3
<br /> E3.25 HOSPITAL POWER PLAN,LEVEL 2,SECTOR E E7.03 ENLARGED ELECTRICAL ROOM PLANS LEVELS 4,5,6,7 A WORK PROPOSAL 87.1R1 03/10/11
<br /> E3.26 HOSPITAL POWER PLAN,LEVEL 2,SECTOR F E7.04 ENLARGED ELECTRICAL ROOM PLANS LEVELS 8,9,10
<br /> E3.27 HOSPITAL POWER PLAN,LEVEL 2,SECTOR G E7.05 ENLARGED ELECTRICAL ROOM PLANS ROOF LEVEL,MDF ROOM
<br /> E3.28 EXISTING HOSPITAL POWER PLAN,LEVEL 3,SECTOR G CLOSEOUT DRAWINGS 04/02/12
<br /> E3.28C HOSPITAL POWER PLAN,CANCER CENTER BRIDGE E8.00 PRIMARY POWER RISER DIAGRAM NORMAL SYSTEM
<br /> E3.29 HOSPITAL POWER PLANS,TYPICAL LEVELS 2 AND 3 ROOMS E8.01 PRIMARY POWER RISER DIAGRAM EMERGENCY SYSTEM A WORK PROPOSAL 144 04/11/14
<br /> E3.31 HOSPITAL POWER PLAN,LEVEL 3,SECTOR A E8.02 HOSPITAL POWER RISER DIAGRAM LEVEL B-SOUTH WING ,:.„:___.,„,i-_,_,
<br /> E3.32 HOSPITAL POWER PLAN,LEVEL 3,SECTOR B E8.03 HOSPITAL POWER RISER DIAGRAM LEVELS G-2-SOUTH WING
<br /> WORK PROPOSAL 145 05/30/14
<br /> E3.33 HOSPITAL POWER PLAN,LEVEL 3,SECTOR C E8.04 HOSPITAL POWER RISER DIAGRAM LEVELS 3-6-SOUTH WING
<br /> E3.34 HOSPITAL POWER PLAN,LEVEL 3,SECTOR D E8.05 HOSPITAL POWER RISER DIAGRAM LEVELS 7-9-SOUTH WING
<br /> E3.35 HOSPITAL POWER PLAN,LEVEL 3,SECTOR E E8.06 HOSPITAL POWER RISER DIAGRAM LEVELS 10-SOUTH WING
<br /> E3.36 HOSPITAL POWER PLAN,LEVEL 3,SECTOR F E8.07 HOSPITAL POWER RISER DIAGRAM ROOF LEVEL-SOUTH WING
<br /> E3.37 HOSPITAL POWER PLAN,LEVEL 3,SECTOR G E8.08 HOSPITAL POWER RISER DIAGRAM LEVEL B-NORTH WING
<br /> E3.41 HOSPITAL POWER PLAN,LEVEL 4,SECTOR A E8.09 HOSPITAL POWER RISER DIAGRAM LEVELS G-2-NORTH WING
<br /> E3.42 HOSPITAL POWER PLAN,LEVEL 4,SECTOR B E8.10 HOSPITAL POWER RISER DIAGRAM LEVELS 3-6-NORTH WING
<br /> E3.42M HOSPITAL POWER PLAN,LEVEL 4 MEZZANINE,SECTOR B E8.11 HOSPITAL POWER RISER DIAGRAM LEVELS 7-9-NORTH WING
<br /> E3.43 HOSPITAL POWER PLAN,LEVEL 4,SECTOR C E8.12 HOSPITAL POWER RISER DIAGRAM LEVELS 10-NORTH WING
<br /> E3.44 HOSPITAL POWER PLAN,LEVEL 4,SECTOR D E8.13 HOSPITAL POWER RISER DIAGRAM ROOF LEVEL-NORTH WING
<br /> E3.45 HOSPITAL POWER PLAN,LEVEL 4,SECTOR E E8.20 GARAGE POWER RISER DIAGRAM
<br /> E3.46 HOSPITAL POWER PLAN,LEVEL 4,SECTOR F E8.21 EXISTING HOSPITAL POWER RISER DIAGRAM-WINGS A&B(208V)
<br /> E3.51 HOSPITAL POWER PLAN,LEVEL 5,SECTOR A E8.22 EXISTING HOSPITAL POWER RISER DIAGRAM-WINGS B&C
<br /> E3.52 HOSPITAL POWER PLAN,LEVEL 5,SECTOR B
<br /> E3.53 HOSPITAL POWER PLAN,LEVEL 5,SECTOR C E9.01 LIGHTING CONTROL DETAILS
<br /> E3.54 HOSPITAL POWER PLAN,LEVEL 5,SECTOR D E9.02 ELECTRICAL DETAILS
<br /> E3.55 HOSPITAL POWER PLAN,LEVEL 5,SECTOR E E9.03 ELECTRICAL DETAILS
<br /> E3.56 HOSPITAL POWER PLAN,LEVEL 5,SECTOR F E9.04 ELECTRICAL DETAILS DMA.Me
<br /> E3.61 HOSPITAL POWER PLAN,LEVEL 6,SECTOR A E9.05 ELECTRICAL DETAILS
<br /> E3.62 HOSPITAL POWER PLAN,LEVEL 6,SECTOR B E9.06 GROUNDING RISER DETAIL GENERAL NOTES AND
<br /> E3.63 HOSPITAL POWER PLAN,LEVEL 6,SECTOR C E9.30 ATS CONTROL WIRING DIAGRAM
<br /> E3.64 HOSPITAL POWER PLAN,LEVEL 6,SECTOR
<br /> E3.66 HOSPITAL POWER PLAN,LEVEL 6,SECTOR OFDRAWING LIST
<br /> E3.67 HOSPITAL POWER PLANS,TYPICAL LEVELS 6-10 ICU PATIENT ROOM T6.O0B HOSPITAL TELECOM PLAN,LEVEL B
<br /> T6.00 HOSPITAL TELECOM PLAN,LEVEL G
<br /> E3.68 HOSPITAL POWER PLANS,TYPICAL LEVELS 6-10 ACU PATIENT ROOM T6.10 HOSPITAL TELECOM PLAN,LEVEL 1
<br /> E3.69 HOSPITAL POWER PLANS,TYPICAL LEVELS 6-10 SEMI-PRIVATE PATIENT ROOM T6.20 HOSPITAL TELECOM PLAN,LEVEL 2
<br /> E3.71 HOSPITAL POWER PLAN,LEVEL 7,SECTOR A T6.30 HOSPITAL TELECOM PLAN,LEVEL 3
<br /> E3.72 HOSPITAL POWER PLAN,LEVEL 7,SECTOR B Y6.40 HOSPITAL TELECOM PLAN,LEVEL 4
<br /> E3.73 HOSPITAL POWER PLAN,LEVEL 7,SECTOR C T6.50 HOSPITAL TELECOM PLAN,LEVEL 5
<br /> E3.74 HOSPITAL POWER PLAN,LEVEL 7,SECTOR D T6.60 HOSPITAL TELECOM PLAN,LEVEL 6
<br /> E3.76 HOSPITAL POWER PLAN,LEVEL 7,SECTOR F T6.70 HOSPITAL TELECOM PLAN,LEVEL 7
<br /> E3.81 HOSPITAL POWER PLAN,LEVEL 8,SECTOR A T6.80 HOSPITAL TELECOM PLAN,LEVEL 8
<br /> E3.82 HOSPITAL POWER PLAN,LEVEL 8,SECTOR B T6.90 HOSPITAL TELECOM PLAN,LEVEL 9
<br /> E3.83 HOSPITAL POWER PLAN,LEVEL 8,SECTOR C T6.100 HOSPITAL TELECOM PLAN,LEVEL 10
<br /> E3.84 HOSPITAL POWER PLAN,LEVEL 8,SECTOR D T6.100R HOSPITAL TELECOM PLAN,ROOF LEVEL �, D. i f
<br /> E3.86 HOSPITAL POWER PLAN,LEVEL 8,SECTOR F T6.200 EXISTING HOSPITAL TELECOM PLAN,FIRST FLOOR .. of A s j
<br /> E3.91 HOSPITAL POWER PLAN,LEVEL 9,SECTOR A T6.210 EXISTING HOSPITAL TELECOM PLAN,SECOND FLOOR 5 l ;,,`
<br /> E3.92 HOSPITAL POWER PLAN,LEVEL 9,SECTOR B , ',� ,1,1_. b: :"
<br /> E3.93 HOSPITAL POWER PLAN,LEVEL 9,SECTOR C T7.01B HOSPITAL ENLARGED NW TELECOM ROOM PLAN-LEVEL B
<br /> E3.94 HOSPITAL POWER PLAN,LEVEL 9,SECTOR D T7.02B HOSPITAL ENLARGED SW TELECOM ROOM PLAN-LEVEL B
<br /> E3.96 HOSPITAL POWER PLAN,LEVEL 9,SECTOR F T7.04B HOSPITAL ENLARGED SE TELECOM ROOM PLAN-LEVEL B38180
<br /> E3.101 HOSPITAL POWER PLAN,LEVEL 10,SECTOR A T7.05B HOSPITAL ENLARGED TELECOM SERVICE ENTRANCE ROOM PLAN-LEVEL B 1,0.�,4, ZS P
<br /> E3.102 HOSPITAL POWER PLAN,LEVEL 10,SECTOR B T7.01 HOSPITAL ENLARGED NW TELECOM ROOM PLAN-LEVEL G `0TJONA 0, 5 j`
<br /> E3.103 HOSPITAL POWER PLAN,LEVEL 10,SECTOR C T7.02 HOSPITAL ENLARGED SW TELECOM ROOM PLAN-LEVEL G
<br /> E3.104 HOSPITAL POWER PLAN,LEVEL 10,SECTOR D T7.03 HOSPITAL ENLARGED NE TELECOM ROOM PLAN-LEVEL G
<br /> E3.106 HOSPITAL POWER PLAN,LEVEL 10,SECTOR F T7.04 HOSPITAL ENLARGED SE TELECOM ROOM PLAN-LEVEL G
<br /> E3.101R HOSPITAL POWER PLAN,ROOF LEVEL,SECTOR A T7.11 HOSPITAL ENLARGED NW TELECOM ROOM PLAN-LEVEL 1
<br /> E3.102R HOSPITAL POWER PLAN,ROOF LEVEL,SECTOR B 77.12 HOSPITAL ENLARGED SW TELECOM ROOM PLAN-LEVEL 1
<br /> E3.103R HOSPITAL POWER PLAN,ROOF LEVEL,SECTOR C T7.13 HOSPITAL ENLARGED NE TELECOM ROOM PLAN-LEVEL 1
<br /> E3.104R HOSPITAL POWER PLAN,ROOF LEVEL,SECTOR D T7.14 HOSPITAL ENLARGED SE TELECOM ROOM PLAN-LEVEL 1
<br /> E3.106R HOSPITAL POWER PLAN,ROOF LEVEL,SECTOR F T7.21 HOSPITAL ENLARGED NW TELECOM ROOM PLAN-LEVEL 2 Date NOVEMBER 03,2000
<br /> E3.102MR HOSPITAL POWER PLAN,ELEVATOR MACHINE ROOM LEVEL,SECTOR B T7.22 HOSPITAL ENLARGED SW TELECOM ROOM PLAN-LEVEL 2
<br /> E3.111 HOSPITAL MECHANICAL EQUIPMENT CONNECTION SCHEDULE 17.23 HOSPITAL ENLARGED NE TELECOM ROOM PLAN-LEVEL 2 Job N. S5060.01
<br /> E3.112 HOSPITAL MECHANICAL EQUIPMENT CONNECTION SCHEDULE T7.24 HOSPITAL ENLARGED SE TELECOM ROOM PLAN-LEVEL 2
<br /> F E3.200 EXISTING HOSPITAL POWER PLAN,PARTIAL FIRST FLOOR 17.31 HOSPITAL ENLARGED NW TELECOM ROOM PLAN-LEVEL 3 p� 8,YT7.32 HOSPITAL ENLARGED SW TELECOM ROOM PLAN-LEVEL 3MA
<br /> m T7.33 HOSPITAL ENLARGED NE TELECOM ROOM PLAN-LEVEL 3 Checked. Npj
<br /> z T7.34 HOSPITAL ENLARGED SE TELECOM ROOM PLAN-LEVEL 3
<br /> T7.41 HOSPITAL ENLARGED MDF PLAN-LEVEL 4
<br /> m
<br /> T7.42 HOSPITAL MDF RACK ELEVATION DETAILS-LEVEL 4
<br /> a T7.51 HOSPITAL ENLARGED NW TELECOM ROOM PLAN-LEVELS 5&9 Die No.
<br /> g; T7.52 HOSPITAL ENLARGED SW TELECOM ROOM PLAN-LEVELS 5&9
<br /> T7.61 HOSPITAL ENLARGED NW TELECOM ROOM PLAN-LEVELS 6,7,8&10
<br /> 5 17.62 HOSPITAL ENLARGED SW TELECOM ROOM PLAN-LEVELS 6,7,8&10
<br /> N T7.101R HOSPITAL ENLARGED RADIO ROOM PLAN-ROOF LEVEL
<br /> N
<br /> S T8.00 TELECOM BACKBONE SCHEMATICS
<br /> 3 T8.01 TELECOM BACKBONE SCHEMATICS
<br /> EO
<br /> TT9.00 SECURITY SUPPORT SYSTEMS DETAILS
<br /> i T9.01 SECURITY SUPPORT SYSTEMS DETAILS
<br /> .01
<br /> m T10.00 PAGING SYSTEM SCHEMATIC
<br /> i T10.01 PAGING SYSTEM BLOCK DIAGRAM
<br /> i
<br /> `Vco T11.00 CAN BACKBONE SCHEMATICS
<br /> EI-'
<br /> 1700 13th St-PGMC 2na Floor Surgery-
<br /> B1406-017
<br />
|