My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3010 EVERETT AVE 2018-09-07
>
Address Records
>
EVERETT AVE
>
3010
>
3010 EVERETT AVE 2018-09-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2018 3:53:05 PM
Creation date
9/7/2018 3:52:58 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERETT AVE
Street Number
3010
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4/10/2018 Page 1 <br /> City of Everett <br /> 7:5) <br /> 12:21:26P1dI <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B0709-029 Site Address 3010 EVERETT AVE <br /> Applied 9/19/2007 Applicant Lot <br /> Approved 11/20/2007 Owner SOUNDVIEW CONTRACTORS LLC Block <br /> Issued 11/20/2007 Contractor SOUNDVIEW CONTRACTORS LLC Tract <br /> Parent Permit No. Description NEW MIXED USE(OFFICE&2 APTS) <br /> Notes <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 12/3/2007 12/3/2007 UFER Ground DWF Approval See notes Contractor will verify setbacks and install <br /> UFER ground <br /> 12/3/2007 12/3/2007 Footing DWF Approval OK for **Pump water out of footing forms area <br /> concrete**SEE before concrete is poured <br /> NOTES** <br /> 12/3/2007 12/3/2007 Foundation DWF Approval As per notes Footings ok for concrete <br /> Contractor will verify setbacks <br /> Contractor will install UFER ground <br /> ***pump water out of footing forms area <br /> before concrete is poured <br /> 12/7/2007 12/7/2007 Foundation DWF PtAppr-CorrReq See notes Corrections: <br /> 1. Need to add to footing"toe"minimum <br /> 4inches on one side of foundation wall. <br /> Crawl space area <br /> 2. Need a letter from architect/engineer <br /> regarding change to plan on craawl space- <br /> "pour a slab" <br /> 12/7/2007 12/7/2007 Footing MWH Approval Dowels-See notes Dowels going in for footing extension on <br /> North Side <br /> 12/14/2007 12/14/2007 StructSlab MWH Approval Changed to slab by <br /> engineer <br /> 12/14/2007 12/14/2007 InsulBldg MWH Approval <br /> 1/24/2008 1/24/2008 ShearNailing DWF Approval Ok to cover <br /> 2/8/2008 2/8/2008 Framing MWH Approval Deck <br /> framing/soffits- <br /> north and south <br /> 2/14/2008 2/14/2008 DrywallNailing DWF Approval See notes Drywall(fire wall on west side of building) <br /> OK for cover. <br /> 2/22/2008 2/22/2008 ShearNailing MWH Approval West side exterior <br /> gypsum <br /> 2/27/2008 2/27/2008 Framing MWH PartialApproval Ok to insulate as per 1. Draftstop pony wall at top of party wall <br /> notes 2. Firestop top of pony wall <br /> 3. Mechanical sign off--2nd floor both <br /> units <br /> 2/29/2008 2/29/2008 InsulBldg MWH PartialApproval 2nd floor only <br /> 3/5/2008 3/5/2008 Framing MWH PartialApproval 1st Floor-garages <br /> 3/5/2008 3/5/2008 DrywallNailing MWH PartialApproval 2nd floor units <br /> 3/13/2008 3/13/2008 Framing MWH Approval Floor trusses-per <br /> engineering-OK <br /> 3/13/2008 3/13/2008 DrywallNailing MWH PartialApproval Stairways& <br /> shop-Doesn't include <br /> Lid <br /> 3/13/2008 3/13/2008 Framing MWH Approval Office area <br /> 3/13/2008 3/13/2008 Framing MWH Approval Roof trusses per <br /> engineering <br /> 3/17/2008 3/17/2008 InsulBldg MWH Approval Front office&Shop <br /> area-OK <br /> 3/19/2008 3/19/2008 DrywallNailing MWH Approval 1st layer at ceiling in <br /> shop <br /> INSP12 CRWS YSTEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.