My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3327 FEDERAL AVE 2018-09-11
>
Address Records
>
FEDERAL AVE
>
3327
>
3327 FEDERAL AVE 2018-09-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 8:34:13 AM
Creation date
9/11/2018 8:32:30 AM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
3327
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS <br /> ft7 JLC d <br /> August 10, 2015 <br /> John Stout <br /> 3327 Federal Ave <br /> Everett, WA 98201 <br /> Subject: Project: John Stout <br /> Job Address: 3327 Federal Ave <br /> Plan Check No: BW1507-002 <br /> Dear Mr. Stout: <br /> In response to your application for a construction permit, your plans have been examined and <br /> you are advised that the issuance of a permit is being withheld for the reasons listed below. <br /> These comments address building issues only. Additional revisions or additions may be <br /> required by other departments (such as Utilities, Planning or Fire). All references refer to the <br /> (2012 International Building Code,) (2012 International Residential Code,) as amended by the <br /> State of Washington and/or Washington State Energy Code 2012 Edition, and adopted by the <br /> City of Everett, unless stated otherwise. <br /> In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two new complete sets of drawings reflecting the <br /> corrections requested. <br /> 1. Structures located less than 5 feet from the property line are required to be one-hour <br /> fire-resistive construction with protection from both sides. Provide details for one-hour <br /> fire-resistive assembly. Show location on plans. <br /> 2. Where supported by attachment to an exterior wall, decks shall be positively anchored <br /> to the primary structure and designed for both vertical and lateral loads. Such <br /> attachment shall not be accomplished by the use of toenails or nails subject to <br /> withdrawal. <br /> 3. Provide lateral connection detail per section R507.2 and show where on the deck the <br /> lateral anchors will be installed. <br /> 4. Where positive connection to the primary building structure cannot be verified during <br /> inspection, decks shall be self-supporting. • <br /> CITY OF EVERETT• 3200 Cedar Street• Everett, WA 98201 • (425)257-8800 • Fax(425)257-8882 ( /40,1\ <br /> S:\iCommon\Clerical\]Heilman\BW1507-002(3327 Federal Ave).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.