My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/09/05 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/09/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 9:24:19 AM
Creation date
9/11/2018 9:23:25 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/5/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A 3 <br /> Scope of Work <br /> SCOPE OF WORK • <br /> LAC has outlined a scope to assist the City of Everett with its asset management system <br /> evaluation process for various infrastructure including water filtration plant assets,wastewater <br /> collection assets,water transmission and distribution systems,transportation and right-of-way <br /> systems, and stormwater systems. Other departments such as parks,facilities, and transit are <br /> NOT included in this scope in Phase A yet will be evaluated on limited basis just for their <br /> maintenance management system needs in Phase B. <br /> STUDY APPROACH <br /> Successful completion of this comprehensive operations evaluation is dependent on successful <br /> interaction and participation between LAC and City personnel, as well as LAC's background and <br /> experience. The work plan has been developed to ensure effective and interactive <br /> communication—leading to a comprehensive result that reflects the true needs for the City's <br /> maintenance and operations. The City has outlined four work products for the project,identified <br /> in three Phases. Our scope has been developed to provide the City with these desired <br /> deliverables. <br /> The first major work product is to evaluate the City's existing operations and asset management <br /> practices. This effort will lead into LAC providing Asset Management Program and work <br /> practice optimization recommendations. This work will also provide the basis for a draft scope of <br /> work and specifications for a Computer Maintenance Management System(CMMS)that will <br /> meet the needs and objectives of the City.Many of the Asset Management Program and work <br /> practice optimization recommendations will utilize the new CMMS software functionality. A <br /> final report will be provided by LAC to the City,that will include actionable recommendations <br /> for improvement opportunities. In this phase,LAC will produce two working papers, a draft, and <br /> final report.At four stages in the process, a working presentation will be made to the review <br /> committee,and at three stages in the effort,a presentation will be made to all the employees <br /> (eighteen meetings). The final report will be the basis for replacement and enhancement of the <br /> City's CMMS and Asset Management Program. <br /> The next work product is to assist in the selection of an enhanced Computerized Maintenance <br /> Management System(CMMS)in Phase B. The efforts for this task will include drafting the <br /> request for proposal(RFP), and assisting in the proposal reviews and selection process of the <br /> CMMS. LAC will assist in providing technical guidance during the evaluation of the proposals. <br /> Those firms that are shortlisted will be required to make a presentation,in which LAC will assist <br /> with the preparation of the presentation script and provide relevant City data for the proposed <br /> vendor to utilize. LAC with then assist the City to.select the best system and related modules <br /> matching their specific needs. This system will be used as a tool to manage City assets and <br /> operations,in adherence with the recommendations from the first deliverable. LAC will then <br /> work with the selected Vendor and the City to set up and configure the system. <br /> The third key work product is the production of an implementation plan, also in Phase B that will <br /> address how new business processes can be implemented and optimize the new CMMS system, <br /> as well as outline the system rollout and related configuration. The Tmplementation Plan will <br /> detail how the recommended improvements to the Asset Management Program should be <br /> implemented using the selected CMMS to meet the identified opportunities. <br /> 8/14/18 Exhibit A- 1 City of Everett,WA <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.