My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1317 HEWITT AVE WAXOLOGY AND BEAUTY BOUTIQUE 2018-09-11
>
Address Records
>
HEWITT AVE
>
1317
>
WAXOLOGY AND BEAUTY BOUTIQUE
>
1317 HEWITT AVE WAXOLOGY AND BEAUTY BOUTIQUE 2018-09-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 11:22:40 AM
Creation date
9/11/2018 11:22:38 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
1317
Tenant Name
WAXOLOGY AND BEAUTY BOUTIQUE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IBC Section 1109.2.1, as per Level 1 alterations IEBC Section 705.1.9 as amended by <br /> the State of Washington. <br /> 2. Additional comments for accessibility: <br /> a. Please indicate the turning radius on the plans, per A117.1-2009 section 603.2.1. <br /> b. Please indicate the clear floor space required by A117.1-2009 section 305.3 if the <br /> door swings into the toilet room, per A117.1-2009 Section 603.2.2 (2). <br /> c. The pull side clearance on the door, if the doorswing is reversed, should be 18 <br /> inches per A117.1-2009 Figure 404.2.3.2. <br /> Energy <br /> 1. RECHECK COMMENT: Please include actual code section language for <br /> interior lighting controls, sensors, and all other methods of compliance covered in <br /> electrical power and lighting systems per WSEC section C405. <br /> All codes cited refer to the 2015 International Building Code (IBC), the 2015 International <br /> Existing Building Code (IEBC), the 2015 International Property Maintenance Code (IPMC), the <br /> 2015 International Fire Code (IFC), the 2015 International Mechanical Code (IMC), and the <br /> 2015 Washington State Energy Code (WSEC), as amended by the State of Washington and <br /> adopted by the City of Everett. The current IBC referenced standard for accessible design is <br /> the 2009 "Accessible and Usable Buildings and Facilities" (ICC/ANSI A117.1). Federal ADA <br /> regulations and standards may be more restrictive. Compliance with these regulations is the <br /> responsibility of the owner of the building. <br /> Upon submittal of the drawings, your application will be given priority and plan review will <br /> recommence. If you have any questions, please call me at 425-257-8813. <br /> All required submittals shall be sufficient detail and contain sufficient information to ensure that <br /> the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> Me <br /> Meg Haley, RA <br /> Plan Review Architect <br /> Permit Services, City of Everett, WA <br /> Direct: 425-257-8813 <br /> CITY OF EVERETT PERMIT SERVICES 3200 CEDAR ST, EVERETT, WA 98201 425-257-8810 <br /> website:www.everettwa.pov/permit January 24, 2017 email: everetteps(@.everettwa.pov <br />
The URL can be used to link to this page
Your browser does not support the video tag.