My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Otak Inc 9/12/2018 Amendment 7
>
Contracts
>
6 Years Then Destroy
>
2020
>
Otak Inc 9/12/2018 Amendment 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 10:33:05 AM
Creation date
9/13/2018 10:33:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Otak Inc
Approval Date
9/12/2018
Council Approval Date
8/29/2018
End Date
6/30/2020
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Stormwater Project
Public Works WO Number
UP3398 34
Amendment/Change Order
Amendment
Amendment/Change Order Number
7
Total Compensation
$212,775.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
500-503 Attending Project/Site Meetings, when Requested <br /> When requested, the Consultant will attend the pre-construction meeting, periodic field meetings during <br /> construction, and final project walk-through. Budget for this task is based on the Consultant preparing for <br /> and attending a maximum of twelve (12) two-hour meetings to discuss construction issues. <br /> 500-504 Client Coordination and Reporting, during Construction <br /> The Consultant will direct and supervise internal staff team members and their activities for the duration of <br /> the construction project. The Consultant will monitor and track scope activities, budget expenditures, and <br /> prepare monthly progress reports and invoices with sufficient detail to demonstrate expended effort and <br /> budget status. <br /> Task 500 Deliverables: <br /> • Prepared Addenda <br /> • "Conformed" plans and specifications <br /> • Returned submittal reviews and RFI response/clarifications <br /> • Revised drawings (construction changes/change orders) <br /> • Monthly Progress Reports and Invoices <br /> • Department of Ecology O&M documentation (water quality treatment units) <br /> Task 500 Assumptions: <br /> • City shall be responsible for: <br /> • Printing bid documents, distributing and tracking document distribution. <br /> ▪ Distributing addenda, facilitating pre-bid and bid opening, and distributing bid tabulation. <br /> ▪ Acting as primary contact for receiving bidding questions. <br /> • Printing and issuing "for construction" documents. <br /> ▪ Providing the Consultant with three sets (specifications and half-size plans), of"Approved for <br /> Construction" documents. <br /> • Directly communicate with the contractor on all issues. <br /> Monitoring contractor tracking and documenting of all changes during construction necessary <br /> to preparing record drawings, including obtaining red-line markups from the contractor. <br /> • Preparation of record drawings. <br /> • The number of construction RFIs, submittal reviews, and change orders is unknown and actual level <br /> of effort for this task will vary. Budget for this task is established from assumed hours for anticipated <br /> staff based upon similar assistance provided on previous comparable projects. Task budget to be <br /> expanded as necessary as project progresses and consultant will monitor budget status and advise <br /> client when the task budget is 85% exhausted to determinate at that time if an amendment should be <br /> executed. <br /> • Addendum preparation budget is based on preparation of two addenda. <br /> • Project bid solicitation is anticipated to occur no sooner than November 2018 <br /> • Project construction assistance services budget is based on providing services for consecutive <br /> eighteen (18) month duration (bid solicitation through project closeout). <br /> • Project progress reports and invoicing will be submitted monthly. Invoice backup information <br /> (timesheets, mileage and expense logs, etc.)will not be submitted with invoicing, except for copies of <br /> subconsultant invoice documentation. Backup information will be made available for staff auditing <br /> purposes, if requested. <br /> • Labor and expense task level-of-effort budgets are estimates and consultant reserves the right to <br /> transfer unused task budgets to accomplish other service-task scope activities, if necessary, and only <br /> upon approval from the City. <br /> City of Everett 2 <br /> Cleveland Avenue Sewer System Replacement and Storm Water Separation Otak <br />
The URL can be used to link to this page
Your browser does not support the video tag.