My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Krazan & Associates Inc 9/12/2018
>
Contracts
>
6 Years Then Destroy
>
2018
>
Krazan & Associates Inc 9/12/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 10:38:16 AM
Creation date
9/13/2018 10:38:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Krazan & Associates Inc
Approval Date
9/12/2018
End Date
12/31/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement U
Tracking Number
0001422
Total Compensation
$18,440.03
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-1 <br /> KRAZAN&ASSOCIATES,INC. <br /> Proposal No.G18689WAL <br /> Everett Water Main Replacement"U" <br /> Everett,WA <br /> August 16,2018 <br /> Page 4 <br /> 5. Geotechnical Communications,Design Report and Meetings <br /> A Statement of Qualifications and the resumes of key personnel are attached to this <br /> proposal. Our geotechnical engineer and geologist will be available to provide a <br /> summary of the subsurface conditions encountered in the explorations and answer <br /> questions after the field work is completed. During the construction phase of the project, <br /> our representative will be available,under a separate contract, to travel to the site on an <br /> as-needed basis to observe the soil conditions to confirm that they are consistent with the <br /> findings of our geotechnical evaluation. A separate cost estimate for construction <br /> monitoring can be given at a later date, at your request. We will coordinate with the <br /> City's survey consultant to allow time to locate the borings and establish ground <br /> elevations. <br /> 6. Project Milestones <br /> The project schedule in Exhibit A-1 indicates the Notice to Proceed (NTP) will be <br /> September 1,2018. <br /> The fieldwork would commence as soon as possible upon receiving your authorization to <br /> proceed, upon obtaining utility clearances, and the availability of the subcontracted <br /> flaggers and drill rig. We will begin laboratory testing immediately upon completing the <br /> field exploration. <br /> We intend to submit a Draft Report on or before October 19, 2018. We anticipate <br /> submitting our Final Geotechnical Engineering Report by October 26,2018. <br /> 7. Prevailing Wages <br /> Our cost estimate includes prevailing wages for drilling and traffic control operations. <br /> COST ESTIMATE <br /> A detailed unit price schedule and budget estimate for the scope of a geotechnical engineering <br /> investigation and report is attached to this proposal for your review. In developing this cost estimate,we <br /> have assumed that adequate access will be available to the soil boring locations, and that permission to <br /> access the site will be provided by you. <br /> We have also included a copy of the WSDOT Acceptance FYE 2016 ICR letter for Krazan for your <br /> review. <br /> The estimated total cost is based on our being able to acquire sufficient information with the proposed <br /> field investigation methods. If unforeseen conditions are encountered and we are not able to complete the <br /> study at the proposed cost, we will contact you immediately to discuss a revised scope of work and a <br /> revised cost estimate. <br /> We would be able to mobilize and begin our investigation as soon as practical, primarily based on the <br /> availability of the subcontracted drill rig,and assuming we have acceptable access to the property. Please <br /> arrange access to the site and inform us of the locations of any underground utilities. <br /> Krazan&Associates,Inc. <br /> Offices Serving The Western United States <br />
The URL can be used to link to this page
Your browser does not support the video tag.