Laserfiche WebLink
EXHIBIT B-1 <br /> Subconsultant Fee Determination - Summary Sheet <br /> (Mandatory when Subconsultants are utilized) <br /> Project: Everett UP No. 3698 - Water Main Replacement"U" <br /> Sub Consultant: Krazan and Associates, Inc. - Proposal No. G18689WAL <br /> Direct Salary Cost (DSC): <br /> Classification Man Hours Rate Cost <br /> Senior Geotechnical Engineer 4 x $ 44.000 = $ 176.00 <br /> Project Engineer/Geologist 52 x $ 24.500 = $ 1,274.00 <br /> Drafting 8 x $ 24.500 = $ 196.00 <br /> Total DSC = $ 1,646.00 <br /> Overhead (OH Cost-- including Salary Additives): <br /> OH Rate x DSC of 158.88% x $ 1,646.00 = 2615.23 <br /> Fixed Fee (FF): <br /> FF Rate x DSC of 30.00% x $ 1,646.00 = $ 493.80 <br /> Reimbursables: <br /> Itemized <br /> Laboratory Services = $ 840.00 <br /> Traffic Control Plan and Flaggers(cost+ 5%) = $ 2,100.00 <br /> Drill Rig &Concrete Coring (cost+5%) = $ 8,745.00 <br /> Total reimbursables = $ 11,685.00 <br /> SubConsultants Total: _ $4,755.03 <br /> Contingency = $ 2,000.00 <br /> Grand Total $ 18,440 <br /> Prepared by: Mike Rundquist Date: 8/16/2018 <br /> DOT Form 140-089 EF Exhibit G-1 <br /> Revised 01-09 <br />