My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LA Consulting Inc 9/12/2018
>
Contracts
>
6 Years Then Destroy
>
2020
>
LA Consulting Inc 9/12/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 10:43:03 AM
Creation date
9/13/2018 10:42:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
LA Consulting Inc
Approval Date
9/12/2018
End Date
6/1/2020
Department
Public Works
Department Project Manager
Grant Moen
Subject / Project Title
Asset & Maintenance Management Software
Tracking Number
0001423
Total Compensation
$188,270.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> Scope of Work <br /> The project as outlined in the scope in Phase A and B (see products) has many deliverables as <br /> listed below: <br /> 1. Kickoff presentation in Task A-1 with seven sessions <br /> 2. Baseline working paper in Task A-2 with one presentation <br /> 3. Findings working paper in Task A-4 with seven presentations <br /> 4. Draft final report in Task A-5 with seven presentations <br /> 5. Final report in Task A-6 <br /> 6. Phase A Status report monthly Task A-7 <br /> 7. Draft RFP in Task B-2.1 <br /> 8. Review of proposals in Task B-2.1 outlined in a short working paper along with an <br /> acknowledgement letter <br /> 9. List of CMMS vendors in Task B-2.1 <br /> 10. Short list compilation in Task B-2.2 <br /> 11. Script outline and sample data for short list presentations in Task B-2.3 <br /> 12. Final selection compilation in Task B-2.4 <br /> 13. Outline of module and licenses requirements in Task B-3.1 <br /> 14. Assist in system load confirmation in Task B-3.2 <br /> 15. Assistance in CMMS configuration in Task B-3.3 <br /> 16. Implementation plan and meeting in Task B-3 <br /> 17. Phase B Status report monthly Task B-4 <br /> 8/14/18 Exhibit A- 15 City of Everett, WA <br />
The URL can be used to link to this page
Your browser does not support the video tag.