Laserfiche WebLink
ORDINANCE NO. j,)' b's" (� <br /> AN ORDINANCE amending Sections 2, 3 and 6 of Ordinance <br /> No. 611-79 creating a special design and construction <br /> fund entitled "Evergreen Way Signalization, et al", <br /> and increasing the expenditure required for this project <br /> from $825,330 to $839,830. <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1 : That Sections 2, 3 and 6 of Ordinance No. 611-79, <br /> which read as follows: <br /> Section 2: <br /> Authorization is given to provide for traffic signal intersection <br /> control improvement or reconstruction at: <br /> 1 ) 47th/Evergreen Way <br /> 2) 50th/Evergreen Way <br /> 3) 52nd/Evergreen Way <br /> 4) Peck's/Evergreen Way <br /> 5) Madison/Evergreen Way <br /> 6) 75/Evergreen Way <br /> 7) 79/Evergreen Way <br /> 8) Casino Road/SR 526 Ramps/Evergreen Way <br /> 9) 41/Rucker <br /> 10) 41/Colby <br /> 11 ) 37/Colby <br /> 12) 35/Rucker <br /> Section 3: <br /> The total estimated cost of the improvements herein authorized <br /> is $162,290 which shall include all cost of the design, plans, <br /> specifications, construction and associated costs. <br /> Section 6: <br /> The sum of $162,290 be appropriated to Fund 328 Evergreen <br /> Way Signals, et al, for the purposes of performing preliminary <br /> engineering and purchase of traffic control equipment for <br /> the Evergreen/Casino/SR 526 ramp intersections as follows: <br /> a. Program 716 - Traffic Signal Reconstruction on <br /> Evergreen Way at 47th Street, 50th Street, 52nd Street <br /> 1 ) Appropriation 27,915 <br /> 2) Source of Funds <br /> FAS 14,732 <br /> 1/2¢ Gas Tax 3,683 <br /> 27,915 <br /> b. Program 722 - Traffic Signals on 41st Street at <br /> Colby & Rucker <br /> 1 ) Appropriation 19 ,583 <br /> 2) Source of Funds <br /> FAM 16,054 <br /> 1/2¢ Gas Tax 3,529 <br /> 19 ,583 19,583 <br />