Laserfiche WebLink
c) Program 723 - Traffic Signals at 37th Street/Colby <br /> & 35th/Rucker <br /> 1) Appropriation 14,457 <br /> 2) Source of Funds <br /> FAM 11 ,566 <br /> 1/2¢ Gas Tax 2,891 <br /> 14,457 <br /> d) Program 724 - Traffic Signals on Evergreen Way <br /> at Peck's Drive, Madison St, 75 St, 79 St, and <br /> Evergreen Way Interconnect <br /> 1 ) Appropriation 31 ,500 <br /> 2) Source of Funds <br /> FAM 25,500 <br /> 1/2¢ Gas Tax 6,300 <br /> 31 ,500 <br /> e) Program 763 - Traffic Signal Control System Purchase <br /> for the Evergreen Way/SR 526 Ramps/Casino Road <br /> Intersections: <br /> 1 ) Appropriation 70,000 <br /> 2) Source of Funds <br /> FAM 14,756 <br /> WSDOT DIST #1 45,500 <br /> 1/2¢ Gas Tax 10,244 <br /> 70,000 <br /> f) These appropriations shall not lapse, but shall <br /> be carried forward from year to year until fully <br /> expended or the purpose has been accomplished or <br /> abandoned without necessity of re-appropriation <br /> as per R.C.W. 35.33.151 . <br /> ARE HEREBY AMENDED AS FOLLOWS: <br /> Section 2: <br /> Authorization is given to provide for the reconstruction <br /> and improvement of traffic signal systems at the intersections <br /> of: <br /> 1 ) 47th/Evergreen Way <br /> 2) 50th/Evergreen Way <br /> 3) 52nd/Evergreen Way <br /> 4) Peck's Dr/Evergreen Way <br /> 5) Madison/Evergreen Way <br /> 6) 75 St/Evergreen Way <br /> 7) 79 St/Evergreen Way <br /> 8) 41 St/Rucker <br /> 9) 41 St/Colby <br /> 10) 37 St/Colby <br /> 11 ) 35 St/Rucker <br /> 12) Evergreen/Casino Road/SR 526 Ramps <br /> -2- <br />