My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 686-80
>
Ordinances
>
Ordinance 686-80
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2018 9:22:15 AM
Creation date
9/21/2018 9:22:14 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
686-80
Date
4/30/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> and for the purchase of land to provide right-of-way at <br /> 13) Evergreen/Casino Road/SR 526 Ramps <br /> and for the purchase of a traffic signal control system at <br /> 14) Evergreen/Casino Road/SR 526 Ramps <br /> Section 3: <br /> The total estimated cost of the improvements herein authorized <br /> is $162,290 which shall include all cost of the design, plans, <br /> specifications, construction and associated costs. <br /> Section 6: <br /> The sum of $162,290 be appropriated to Fund 328 Evergreen <br /> Way Signals, et al, for the purposes of performing preliminary <br /> engineering and purchase of traffic control system hardware <br /> for the Evergreen/Casino Road/SR 526 Ramp intersections as <br /> follows: <br /> a. Program 716 - Traffic Signal Reconstruction on Evergreen <br /> Way at 47th Street, 50th Street, 52nd Street <br /> 1 ) Appropriation 27,915 <br /> 2) Source of Funds <br /> FAM 22,885 <br /> 1/2¢ Gas Tax 5,030 <br /> 27,915 <br /> b. Program 722 - Traffic Signals on 41st Street at Colby <br /> & Rucker <br /> 1 ) Appropriation 19,583 <br /> 2) Source of Funds <br /> FAM 16,054 <br /> 1/2¢ Gas Tax 3,529 <br /> 19 ,583 <br /> c. Program 723 - Traffic Signals at 37th Street/Colby & <br /> 35th/Rucker <br /> 1 ) Appropriation 14,457 <br /> 2) Source of Funds <br /> FAM 11 ,566 <br /> 1/2¢ Gas Tax 2,891 <br /> 14,457 <br /> d. Program 724 - Traffic Signals on Evergreen Way at Peck's <br /> Drive, Madison Street, 75 Street, 79 Street, and Evergreen <br /> Way (47 to 79) interconnect <br /> 1 ) Appropriation 31 ,500 <br /> 2) Source of Funds <br /> FAM 25,200 <br /> 1/2¢ Gas Tax 6,300 <br /> 31 ,500 <br /> e. Program 735 - Casino Road Improvements <br /> 1 ) Appropriation 6,000 <br /> Fund 002-General: <br /> Cash on Hand 6,000 <br /> 6,000 <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.