Laserfiche WebLink
.A <br /> 1 $1,200 for direct connection to the Everett public sewer system of a <br /> triplex or three family structure. <br /> 2 <br /> $1,575 for direct connection to the Everett public sewer system of a <br /> 3 fourplex or four family structures. <br /> 4 <br /> D. Area 4 - (Lift Station Areas in South Everett), as shown on the <br /> 5 attached map: <br /> 6 $500 for each direct connection to the Everett public sewer system <br /> of a single family residence. <br /> 7 <br /> $850 for direct connection to the Everett public sewer system of a <br /> 8 duplex. <br /> 9 $1,200 for direct connection to the Everett public sewer system of a <br /> triplex or three family structure. <br /> 10 <br /> $1,575 for direct connection to the Everett public sewer system of a <br /> 11 fourplex or four family structure. <br /> 12 <br /> E. Area 5 - (Southwest Everett), as shown on the attached map: <br /> 13 <br /> $500 for each direct connection to the Everett public sewer system <br /> 14 of a single family residence; provided that in the event the <br /> property to be connected has been assessed or has paid a <br /> 15 charge for the Southwest sewer interceptor, the connection <br /> charge shall be $263 <br /> 16 <br /> 4850 for direct connection to the public sewer system of a duplex; <br /> 17 provided that in the event the property to be connected has <br /> been assessed or has paid a charge for the Southwest sewer <br /> 18 interceptor, the connection charge shall be $384. <br /> 19 $1,200 for direct connection to the public sewer system of a triplex <br /> or three family structure; provided that in the event property <br /> 20 to be connected has been assessed or has paid a charge for <br /> the Southwest sewer interceptor, the charge shall be $510. <br /> 21 $1,575 for direct connection to the Everett public sewer system of a <br /> 22 fourplex or four family structure; provided that in the event <br /> the property to be connected has been assessed or has paid a <br /> 23 charge for the Southwest sewer interceptor, the charge shall <br /> be $680. <br /> 24 <br /> 25 Section 2: The said connection charges shall be assessed based on the number <br /> 26 of units in the structure to be connected, regardless of whether the units are connected <br /> 27 to the public sewer system line in common or individually. <br /> 28 Section 3: The Director of Public Works shall establish rules, regulations and <br /> 29 procedures for administration of the said fees, including but not limited to <br /> 30 determination of the boundaries between the aforesaid areas of the City. <br /> 31 <br /> -3- <br /> 32 <br />