My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 669-80
>
Ordinances
>
Ordinance 669-80
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2018 9:11:19 AM
Creation date
9/24/2018 9:11:17 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
669-80
Date
2/27/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> 1 Section 1: In addition to sewer connection permit fees as currently required <br /> 2 by Everett Municipal Code 14.08.130, or as such may be amended, and in addition to the <br /> 3 sewer lateral and trunk connection fees as currently established under Everett <br /> 4 Municipal Code 14.04.090, 14.04.100, 14.04.120 and 14.04.130, or as such may be <br /> 5 amended, there is hereby imposed upon, and the owners of properties which have not <br /> 6 paid an equitable share of the cost of the City's sewerage system under the sewer <br /> 7 system charges established under Ordinance No. 3731 and as later charged under <br /> 8 subsequent ordinance, shall pay, prior to connection to a City sewer, a special <br /> 9 connection charge in an amount to be computed as follows: <br /> 10 <br /> A. Area _1 - (North and South Central), as shown on the attached map <br /> 11 which is hereby incorporated by reference: <br /> 12 $221 for each direct connection to the Everett public sewer system <br /> of a single family residence. <br /> 13 <br /> $322 for direct connection to the Everett public sewer system of a <br /> 14 duplex. <br /> 15 $429 for direct connection to the Everett public sewer system of a <br /> triplex or three family structure <br /> 16 <br /> $572 for direct connection to the Everett public sewer system of a <br /> 17 fourplex or four family structure. <br /> 18 <br /> B. Area 2- (South End Interceptor), as shown on the attached map: <br /> 19 <br /> $263 for each direct connection to the Everett public sewer system <br /> 20 of a single family residence. <br /> 21 $384 for direct connection to the Everett public sewer system of a <br /> duplex. <br /> 22 <br /> $510 for direct connection to the Everett public sewer system of a <br /> 23 triplex or three family structure. <br /> 24 $680 for direct connection to the Everett public sewer system of a <br /> fourplex or four famliy structure. <br /> 25 <br /> 26 C. Area 3 - (Riverside), as shown on the attached map: <br /> 27 $500 for each direct connection to the Everett public sewer system <br /> of a single family residence. <br /> 28 <br /> $850 for direct connection to the Everett public sewer system of a <br /> 29 duplex. <br /> 30 <br /> 31 <br /> 32 -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.