Laserfiche WebLink
2. For mailing and copying expenses for Greater <br /> Riverside Organization (G.R.O. ) meetings . This <br /> will be paid for from 1978 Block Grant Neighbor- <br /> hood Improvements Fund No. 329 , Program 718, Work <br /> Order 714 . <br /> (Cost: $300) <br /> 3 . Replace sections of sidewalks on Highland between <br /> 23rd and Everett Avenue. <br /> (Estimated Cost: $12, 797) <br /> 4 . Install drainage tile on 2400 block of Highland and <br /> on Walnut between 21st and 22nd. <br /> (Estimated Cost: $6 , 000) <br /> B. Port Gardner Neighborhood Improvements : <br /> 1 . Complete any 1978 Port Gardner Neighborhood projects <br /> which were approved by City Council in 1978 but cannot <br /> be completed with 1978 Port Gardner Block Grant funds , <br /> up to a maximum of $10 , 000 . <br /> 2. Two reflective tape crosswalk signs on the north sides <br /> of the 35th and Hoyt intersection and the 36th and <br /> Hoyt intersection. <br /> (Estimated Cost: $300) <br /> 3. Improvements on 35th from Hoyt to Rucker up to a <br /> maximum of $33, 000 in the following priority: <br /> a. curbs and gutters on north and south sides <br /> b. sidewalk on south side <br /> c . street repairs (fill and overlay) <br /> d. driveway and alley apron on north side <br /> (Estimated Cost: $33, 000) <br /> 4 . Five street lights and poles : <br /> a. northwest corner of Wall and Federal intersection <br /> b. mid-block on west side of 2900 Nassau <br /> c. northwest corner of Wall and Nassau intersection <br /> d. mid-block on west side of 3000 Nassau <br /> e . northwest corner of Pacific and Nassau intersection <br /> (Estimated Cost: $3 , 500) <br /> 5 . Sidewalk (driveway) repair at 3617 Rockefeller. <br /> (Estimated Cost: $300) <br /> 6 . Improvements on 38th and 39th between Friday and Grand <br /> up to a maximum of $25 , 000 in the following priority : <br /> a. curbs, gutters , sidewalk and rockery on north side <br /> and street repairs on 38th. <br /> (Estimated Cost: $17 , 793) <br /> b. curbs , gutters and sidewalk on north side and <br /> street repairs on 39th. <br /> (Estimated Cost: $14 , 568) <br /> - 5 - <br />