Laserfiche WebLink
• <br /> 7 . Mini-Park at Grand/High/Norton intersection up to <br /> a maximum of $15 , 000 in the following priority: <br /> a. clearing of berry bushes <br /> b. fencing <br /> c . sodding <br /> (Estimated Cost: $15, 000) <br /> 8 . Extruded cement concrete curbs on both sides of Norton <br /> Bridge (3300 Block) <br /> (Estimated Cost: $3, 135) <br /> 9 . Completion of Item #6 above, if not completed with <br /> budgeted $25 , 000 . <br /> 10. Sidewalk reconstruction on Gedney and Wall in the <br /> following priority: <br /> a. Sidewalk reconstruction on west side of Gedney <br /> (Estimated Cost: $1, 350) <br /> b. Sidewalk reconstruction on Wall from Nassau to Bond <br /> (Estimated Cost: $1 , 740) <br /> C. Northeast Everett Neighborhood Improvements : <br /> 1. Curbs, gutters and drainage on N.W. 140 feet on 17th <br /> Street between Cedar and Pine <br /> (Estimated Cost: $3 , 213) <br /> 2. Curbs , gutters , drainage and sidewalk on the west side <br /> of Pine Street between 9th and 10th and a 22 foot <br /> asphalt roadbed along the Pine Street right-of-way <br /> between 9th and 10th. <br /> (Estimated Cost: $54, 777) <br /> 3. Repair of Wiggums Hollow Park <br /> (Estimated Cost: $10 , 000) <br /> 4 . Curbs , gutters, drainage and sidewalks on the east and <br /> west sides of the 1300 and 1400 blocks of Maple and an <br /> asphalt overlay of the existing roadbed in the 1300 and <br /> 1400 blocks of Maple. <br /> (Estimated Cost: $72 , 954) <br /> 5. Sidewalk on the west side of Walnut from 9th to Butler <br /> (Estimated Cost: $4 , 108) <br /> 6 . Sidewalk on the N.W. 140 feet of 17th Street between <br /> Cedar and Pine <br /> (Estimated Cost: $2, 000) <br /> D. Lowell Neighborhood Improvements - (as amended by Lowell <br /> residents December 19 , 1979) : <br /> 1. Planning Study of Lowell <br /> (Estimated Cost: $20, 000) <br /> 2 . One tennis court at Lowell Park <br /> (Estimated Cost: $25 , 000) <br /> - 6 - <br />