Laserfiche WebLink
• <br /> which provided for specific improvements in the specified neighborhoods; <br /> NOW, THEREFORE, BE IT ORDAINED BY THE EVERETT CITY COUNCIL THAT: <br /> Section 1: A special construction fund is hereby established <br /> as Fund No. 333 entitled "1979 Block Grant Neigh- <br /> borhood Improvement Fund" to accomplish the actions authorized <br /> in subsequent sections of this ordinance. <br /> Section 2: Authorization is hereby given to provide for the <br /> development of contract plans, specifications and <br /> detailed cost estimates and construction required to provide the <br /> following. <br /> A. Riverside Neighborhood Improvements: <br /> 1. Overlay Cedar, 19th to 21st, widen and install <br /> curbs both sides. <br /> (Estimated Cost: $50,000) <br /> 2. Replace sections of sidewalk on Chestnut <br /> between 23rd Street and Everett Avenue. <br /> (Estimated Cost: $8,422) <br /> 3. (tie) Replace sections of sidewalks on Highland <br /> between 23rd and Everett Avenue. <br /> (Estimated Cost: $12,797) <br /> 4. (tie) Pave 22nd Street from Rainier to Baker. <br /> (Estimated Cost: $21,473) <br /> B. Port Gardner Neighborhood Improvements <br /> 1. Complete any 1978 Port Gardner Neighborhood projects <br /> which were approved by City Countil in 1978 but <br /> cannot be completed with 1978 Port Gardner Block <br /> Grant funds, up to a maximum of $10,000. <br /> 2. Two reflective tape crosswalk signs on the north <br /> sides of the 35th and Hoyt intersection and the <br /> 36th and Hoyt intersection. <br /> (Estimated cost: $300) <br /> 3. Improvements on 35th from Hoyt to Rucker up to a <br /> maximum of $33,000 in the following priority: <br /> a. curbs and gutters on north and south sides <br /> b. sidewalk on south side <br /> c. street repairs (fill and overlay) <br /> d. driveway and alley apron on north side <br /> (Estimated cost: $33,000) <br /> -2- <br />