Laserfiche WebLink
4. Five street lights and poles: <br /> a. northwest corner of Wall and Federal intersection <br /> b. mid-block on west side of 2900 Nassau <br /> c. northwest corner of Wall and Nassau intersection <br /> d. mid-block on west side of 3000 Nassua <br /> e. northwest corner of Pacific and Nassau intersection <br /> (Estimated cost: $3,500) <br /> 5. Sidewalk (driveway) repair at 3617 Rockefeller. <br /> (Estimated cost: :$300) <br /> 6. Improvements on 38th and 39th between Friday and Grand <br /> up to a maximum of $25,000 in the following priority: <br /> a. curbs, gutters, sidewalk and rockery on north side <br /> and street repairs on 38th. <br /> (Estimated cost: $17,793) <br /> b. curbs, gutters and sidewalk on north side and <br /> street repairs on 39th. <br /> (Estimated cost: $14,568) <br /> 7. Mini-park at Grand/High/Norton intersection up to a <br /> maximum of $15,000 in the following priority: <br /> a. clearing of berry bushes <br /> b. fencing <br /> c. sodding <br /> (Estimated cost: $15,000) <br /> 8. Extruded cement concrete curbs on both sides of Norton <br /> Bridge (3300 Block) <br /> (Estimated cost: $3,135) <br /> 9. Completion of Item #6 above, if not completed with <br /> budgeted $25,000. <br /> 10. Sidewalk reconstruction on Gedney and Wall in the <br /> following priority: <br /> a. Sidewalk reconstruction on west side of Gedney <br /> (Estimated cost: $1,350) <br /> b. Sidewalk reconstruction on Wall from Nassau to Bond <br /> (Estimated cost: $1,740) <br /> C. Northeast Everett Neighborhood Improvements: <br /> 1. Curbs, gutters and drainage on N.W. 140 feet on 17th Street <br /> between Cedar and Pine <br /> (Estimated cost: $3,213) <br /> -3- <br />