8
<br /> BID TABULATION
<br /> WPCF FEN Chlorination Building Upgrade
<br /> _ W.O.3614
<br /> . DATE 9111/215
<br /> °Prepared By:Eugene I6outby r -
<br /> Fort Each Brown,Project Engineer ENGINEER'S ESTIMATE IbrCO General Construction Inn Steller 7 Corporation Prospect Construction One. MCClure and Som Inc. Harbor Pacific Contractors Inc. Intensest Construction Inc.
<br /> UNIT TOTAL UNrr TOTAL UNIT TOTAL UNIT TOTAL (Sdrr TOTAL UNIT TOTAL UNIT TOTAL
<br /> S ITEMDESCRIPTION UNIT QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
<br /> I Supply god lesriltort pike per Section 31 62 13, 02. 6 51,76040 552.360.00 518,000.00 5106,000.0D ,520,00040 $120,000.00 $15,700.00 194,20040 525,000.00 $150,000.00 310,250.00 161,500.00 $12,00040 572,000,00
<br /> including pitn cnbffanddisposal.
<br /> 2 Ripply 16.5inch diameter concrete piles. LF 5025 596.60 5485.417.00 170.00 5351.750.00 555.00 3427,125.00 3135.00 0427,125.00 585.00 $427,125.00 $74.00 037450.00 580.00 5402.000.00
<br /> indudingddivay and unloading,per Senlion 31
<br /> 6213.Actudquondty will be bused on find
<br /> insmlled pilelsoglh.
<br /> 3 Inas 16,5 Inch diameter conuem pace,Aral LF 5025 52155 5106,300.00 526,00 3130,650.00 533.00 3165,12540 055.00 5276,375.00 035.00 $175,873.00 $21.00 5105,525.00 550.00 5251,250.00
<br /> quantity will be bond on pile length from tip to
<br /> cutoffaoundadlo the nearest lb.L tloit price
<br /> shall blade,butnol be Welted t.mobgtm0on
<br /> motuiol handling,pnvddlliog,pile driving,pile
<br /> cutoffonddisposel,rand demobilisation. •
<br /> 4 Supply IS Inca dlumetereon,wln piles.including LF 2004 5106.65 5213,720.00 082.00 3164.321.00 5100.00 5200,400.00 0108,00 5216,432,00 0100.00 5200,400.00 591.00 018236400 595.00 0100.300.00
<br /> delivery and unloading,per Section 31 62 13.
<br /> Actual quantity will be bescdon li eI installed
<br /> pile length
<br /> 5 Install 18 inch diameter concrelc pans.Aclunl LF 2004 123.00 547,606,00 330,00 376,15200 541.00 096,192.00 542.00 584,168.00 545.00 590,180.00 146.00 592,114.00 58400 5166336.00
<br /> quantity will be bond au pile length Ram rip to
<br /> cutoff rounded b the nearest foot Unit price
<br /> shall include,but not be limltd to.mobilisation.
<br /> .4[611 handing,path Ming.pile driving,pile
<br /> cutoff and disposal,and demobilization.
<br /> 1
<br /> 6 Supply prmmnam sheat pile,including delivery SF 4000 556.91 3227,653.00 521.03 3108400.00 522.00 381,000.00 523.00 592,000.00 524.00 396400.00 522.25 589,000.00 524.00 596,000,00
<br /> and unlooding,par Section 3162 17.Rush
<br /> retaining wall on thnoorth end of the project
<br /> isea Actual quantity will be bored on Saul .
<br /> nsmllndshat pile am.
<br /> 7 handl permanent shat pile,pas Section 3162 SF 4000 53.07 $12284.00 510.00 540,000.00 59.00 036.000.00 314,00 556,000.00 515.00 560.000.00 515.00 560,000.00 528.00 5112,000.00
<br /> 17,for the retaining well on the north and of the
<br /> p jel.reo.Chit price shall Include,but not be
<br /> Iimitedlo.mcbiaation,urand malarial
<br /> handling.shatpiic driving,material disposal,
<br /> ooddemobrSwtnm
<br /> OD a 7Ymeh Wet'Syaem(RCW 39.0(180) LSI 510,000,00 $10,000.00 35,00000 55,000.00 5450,000.00 $450,000.00 510,000.00 $10400.00 5650,000.00 0650,000.00 1344,425,00 5344,425.00 5205,000.00 6205,000.00
<br /> 9 PROCESS FACILITY BASE BID(MI Work b LSI 56.138,092,00 56,135.09240 05916,000,00 $5914000.00 55.748,000.00 55.746.000,00 56,173,749.00 36.173,749.00 15,640,979.00 13,646,97900 56,268,05200 56,260,05200 56,500.000.00 16.300,000.00
<br /> mm pima the project lint lsmteleny Included
<br /> in Bid hems I Ihroueh 8).
<br /> 10 Aaonwce(Sedl5501 2100) LSI 5150,000.00 $150,000.00 0150,000.00 1150.000,00 5150,000.00 5150,000.00 5150,000,00 3150,000.00 0150,000.00 0150,000.00 0150,000.00 S150,000.00 5150.000.00 5150,00040
<br /> SUBTOTAL(Bid Items I through ID) 07.445.721.00 $7,049,880.00 57,481,94200 57,580,049.00 •
<br /> 17,646,559,00 17,724.900.00 ii 57,946,966.00
<br /> Weshi0805 Stele SeleeTecf5 9.7%e 3732.234.94 3683,1138.56 $725,70957 5735,26(75 5741,716.22 5749,315.30 5770,155.70
<br /> Conant Tonic 38,167,95594 37,733,718.36 58207251.57 18.315.313.75 50/827522 08.474315.301 50,717,021.70
<br /> •
<br /> •
<br /> j