Laserfiche WebLink
NOW, THEREFORE, BE IT ORDAINED THAT: <br /> Section 1: <br /> A special construction fund is hereby established as Fund No. 328 entitled <br /> EVERGREEN WAY SIGNALIZATION, ET. AL for the preliminary Engineering and <br /> construction activities required to construct the improvements defined in the following <br /> sections. <br /> Section 2: <br /> Authorization is given to provide for the reconstruction of traffic signal <br /> systems at the intersections of: <br /> 1) 47th/Evergreen Way <br /> 2) 50th/Evergreen Way <br /> 3) 52nd/Evergreen Way <br /> 4) 41st/Colby <br /> 5) 41st/Rucker <br /> 6) 37th/Colby <br /> 7) 35th/Rucker <br /> 8) Madison/Evergreen Way <br /> 9) 79th/Evergreen Way <br /> 10) Casino/SR 526/Evergreen Way <br /> Section3: <br /> The total estimated cost of the improvements herein authorized is $825,330 <br /> which shall include all cost of the design, plans, specifications, construction and <br /> associated costs. <br />