Laserfiche WebLink
water and sewer system of the City, including the City' s storm <br /> water drainage system, consisting of the following "Water and Sewer <br /> Projects" : <br /> (a) Water improvements: <br /> (1 ) There shall be constructed a ground level water <br /> storage reservoir in the south part of the City. <br /> ( 2 ) There shall be constructed an extension of the No. 5 <br /> water transmission line to the ground level water <br /> storage reservoir referred to above to provide <br /> gravity-feed water to South Everett. <br /> ( 3 ) There shall be constructed a water pump station for <br /> the purpose of feeding water to the Casino tank from <br /> the ground level water storage reservoir referred to <br /> above. <br /> (b) Storm water drainage improvements: <br /> (1 ) The Pigeon Creek Basin Plan shall be implemented by <br /> upgrading the Evergreen Way drainage system and the <br /> Pigeon Creek main channel and providing water <br /> quality control . <br /> (2 ) The Wood Creek Phase I Basin Plan shall be imple- <br /> mented by upgrading the Wood Creek drainage system <br /> and providing water detention and quality control <br /> facilities. <br /> ( 3 ) The Everett drainage basin plans shall be imple- <br /> mented as they are prepared by providing controls <br /> on flooding , erosion, deposition, water quality <br /> degradation and other storm water runoff problems. <br /> There shall be included in the foregoing the acquisition and <br /> installation of all valves, fittings, chambers, easements, rights- <br /> of-way, land and other capital improvements which may be required. <br /> - 2 - <br />