Laserfiche WebLink
• . . <br /> • <br /> f • <br /> 1 Section 23. That Section 303 of the Uniform Mechanical Code be, and is hereby <br /> 2 amended by the addition of a new Subsection 303 (e) which reads: <br /> 3 Section 303 (e) To Whom Permits May Be Issued: A permit required <br /> by this code may be issued to any person, company, corporation, firm <br /> 4 or contractor not acting in violation of any current contractor <br /> licensing law. <br /> 5 <br /> Section 24. That Section 304 of the Uniform Mechanical Code be, and is hereby <br /> 6 <br /> amended by deleting: <br /> 7 <br /> Section 304. Any person desiring a permit required by this Code, shall, at <br /> 8 the time of filing an application therefore, pay a fee as required by this <br /> Section. <br /> 9 <br /> 1. For the issuance of each permit. $ 3.00 <br /> 10 2. For the installation or relocation <br /> of each forced-air or gravity-type <br /> 11 furnace or burner, including ducts <br /> and vents attached to such appliance, <br /> 12 up to and including 100,000 Btu/h. 4.00 <br /> 3. For the installation or relocation <br /> 13 of each forced-air or gravity-type <br /> furnace or burner, including ducts <br /> 14 and vents attached to such appliance <br /> over 100,000 Btu/h. 5.00 <br /> 15 4. For the installation or relocation <br /> of each floor furance, including <br /> 16 vent. 4.00 <br /> 5. For the installation or relocation <br /> 17 of each suspended heater, recessed <br /> wall heater or floor mounted unit <br /> 18 heater. 4.00 <br /> 6. For the installation, relocation or <br /> 19 replacement of each appliance vent <br /> installed and not included in an <br /> 20 appliance permit. 2.00 <br /> 7. For the repair of, alteration of, or <br /> 21 addition to each heating appliance, <br /> refrigeration unit, cooling, absorption, <br /> 22 or evaporative cooling system, including <br /> installation of controls regulated by <br /> 23 this Code. 4.00 <br /> 8. For the installation or relocation of <br /> 24 each boiler or compressor to and <br /> including three horsepower, or each <br /> 25 absorption system to and including <br /> 100,000 Btu/h. 4.00 <br /> 26 9. For the installation or relocation of <br /> each boiler or compressor over three <br /> 27 horsepower to and including 15 horse- <br /> power, or each absorption system <br /> 28 over 100,000 Btu/h and including <br /> 500,000 Btu/H. 7.50 <br /> 29 10. For the installation or relocation of <br /> each boiler or compressor over 15 <br /> 30 horsepower to and including 30 horse- <br /> power, or each absorption system <br /> 31 over 500,000 Btu/h to and including <br /> 1,000,000 Btu/h. 10.00 <br /> 32 <br /> - 10 - <br />