Laserfiche WebLink
. p <br /> • 3 <br /> 1 80-13 ELECTRICAL PERMIT FEES. A fee for each electrical permit <br /> shall be paid to the Building Official as set forth herein: <br /> 2 <br /> TYPE OF WORK FEE <br /> 3 <br /> Single Family (New) <br /> 4 <br /> 100 Amp. 16.00 <br /> 5 150 20.00 <br /> 200 24.00 <br /> 6 300 30.00 <br /> 400 45.00 <br /> 7 500 56.00 <br /> 600 64.00 <br /> 8 800 75.00 <br /> 9 In excess of <br /> 800 Amp Service 100.00 <br /> 10 <br /> Multiple Family (New) Same as for New <br /> 11 Per Meter Single Family <br /> 12 House Meter 16.00 <br /> 13 New Circuits, Circuits 5.00 for 1 <br /> Extensions & Alterations to 4 ckts & <br /> 14 2.00 each additional ckt. <br /> 15 Altered Services <br /> Under 600 Volts <br /> 16 <br /> Not exceeding 100 Amp 10.00 <br /> 17 Not exceeding 150 Amp 15.00 <br /> Not exceeding 200 Amp 20.00 <br /> 18 Not exceeding 300 Amp 25.00 <br /> Not exceeding 400 Amp 35.00 <br /> 19 Not exceeding 600 Amp 55.00 <br /> Not exceeding 1000 Amp 75.00 <br /> 20 Not exceeding 1500 Amp 100.00 <br /> Exceeding 1500 Amp 125.00 <br /> 21 <br /> Feeders & Altered <br /> 22 Services over 600 Volts <br /> 23 1 KVA or less 5.00 <br /> 5 KVA or less 10.00 <br /> 24 15 KVA or less 25.00 <br /> 20 KVA or less 30.00 <br /> 25 30 to 50 KVA 40.00 <br /> Over 50 KVA 50.00 <br /> 26 <br /> Commercial <br /> 27 <br /> Job Cost: <br /> 28 <br /> 250.00 or less 10.00 <br /> 29 <br /> 251.00 - 1000.00 10.00 plus 2% <br /> 30 <br /> 1001.00 - 4000.00 30.00 plus 1% <br /> 31 Over 4000.00 70.00 and Y2 of 1% <br /> 32 <br /> - 41 - <br />