GENERAL NOTES: <br /> 1. THE CONTRACTOR SHALL NOTIFY TOWER NETWORK CARRIER OF ANY 22. ALL EXISTING CONSTRUCTION, EQUIPMENT, AND FINISHES NOTED TO BE 49. GENERAL CONTRACTOR IS TO COORDINATE ALL POWER INSTALLATION 141110,-. <br /> ERRORS, OMISSIONS, OR INCONSISTENCIES AS THEY MAY BE DISCOVERED REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND WILL WITH POWER COMPANY AS REQUIRED. CONTRACTOR TO REPORT POWER cex <br /> IN PLANS, DOCUMENTS, NOTES, OR SPECIFICATIONS PRIOR TO STARTING BE REMOVED FROM THE SITE WITH THE FOLLOWING EXCEPTIONS: INSTALLATION COORDINATION SOLUTION(S) TO NETWORK CARRIER ` ,,, at&t <br /> CONSTRUCTION INCLUDING, BUT NOT LIMITED BY, DEMOLITION. THE A. PROPERTY NOTED TO BE RETURNED TO THE OWNER. REPRESENTATIVE, PROJECT CONSTRUCTION MANAGER AND ARCHITECT. ,, <br /> CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ANY ERROR, SIGNS AND PLACEMENT: Your world.Delivered. <br /> B. PROPERTY NOTED TO BE REMOVED BY THE OWNER. 1. LOW LEVEL BLUE NOTICE SIGNS - PLACE AT SITE ENTRY ACCESS <br /> OMISSION, OR INCONSISTENCY AFTER THE START OF CONSTRUCTION WHICH 50. ANY SUBSTITUTIONS OF MATERIALS AND/OR EQUIPMENT, MUST BE / <br /> HAS NOT BEEN BROUGHT TO THE ATTENTION OF TOWER NETWORK CARRIER APPROVED BY TOWER NETWORK CARRIER CONSTRUCTION MANAGER. POINTS ONLY. <br /> CONSTRUCTION PROJECT MANAGER AND SHALL INCUR ANY EXPENSES TO 23. THE GOVERNING AGENCIES, CODE AUTHORITIES, AND BUILDING INSPECTORS - ROOFTOPS: PLACE SIGNS ON THE INSIDE OF ROOF HATCH; PLACE ON 8"SHALL PROVIDE THE MINIMUM STANDARDS FOR CONSTRUCTION TECHNIQUES, ACCESS DOOR UNLESS DOOR IS USED BY GENERAL PUBLIC OR BUILDING / / <br /> RECTIFY THE SITUATION. THE MEANS OF CORRECTING ANY ERROR SHALL MATERIALS, AND FINISHES USED THROUGHOUT THE PROJECT. TRADE 51. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL REMEDY TENANTS ON A REGULAR BASIS FOR ACCESS - IN THESE CASES CONSULT <br /> FIRST BE APPROVED BY TOWER NETWORK CARRIER CONSTRUCTION STANDARDS AND/OR PUBLISHED MANUFACTURERS SPECIFICATIONS MEETING ALL FAULTY, INFERIOR, AND/OR IMPROPER MATERIALS, DAMAGED GOODS, <br /> PROJECT MANAGER. / CONSTRUCTION MANAGER. <br /> OR EXCEEDING DESIGN REQUIREMENTS SHALL BE USED FOR INSTALLATION. AND/OR FAULTY WORKMANSHIP FOR ONE (1) YEAR AFTER THE PROJECT IS - WATER TANKS: PLACE SIGNS ON COMPOUND GATE. �� ,' amt.,r,r l.to MI . <br /> 2. PRIOR TO THE SUBMISSION OF BIDS, CONTRACTORS INVOLVED SHALL VISIT COMPETE AND ACCEPTED UNDER THIS CONTRACT; UNLESS NOTED OTHERWISE - NOTICE , <br /> 24. WHEN REQUIRED STORAGE OF MATERIALS OCCURS, THEY SHALL BE EVENLY IN THE CONTRACT BETWEEN THE OWNER AND THE CONTRACTOR. NETWORK CARRIER OWNED SITES: PLACE ONE SIGN ON COMPOUND <br /> THE JOB SITE TO FAMILIARIZE THEMSELVES WITH ALL CONDITIONS GATE; ALL SIGNS SHALL BE SECURED WITH EITHER STAINLESS STEEL ZIP <br /> HEOTHE PROJECT. CONTRACTORS PRIOR TO THE DISTRIBUTED OVER ROUGH FRAMED FLOORS OR ROOFS SO AS NOT TO (EXCEPTION) THE ROOFING SUBCONTRACTOR SHALL FURNISH A MAINTENANCE TIES OR STAINLESS TECH SCREWS. <br /> COMMENCEMENT AFFECTINGTHE PROPOSED CONSTRUCTION,PROJECT. <br /> CTHE CORCOHAVING BEENE EXCEED THE DESIGNED LIVE LOADS FOR THE STRUCTURE. TEMPORARY AGREEMENT FOR ALL WORK DONE, COSIGNED BY THE GENERAL CONTRACTOR, E <br /> AWARDED THIS PROJECT SHALL VISIT THE CONSTRUCTION SITE WITH THE SHORING AND/OR BRACING IS TO BE PROVIDED WHERE THE STRUCTURE HAS TO MAINTAIN THE ROOFING IN A WATERTIGHT CONDITION FOR A PERIOD OF 2. CONSTRUCTION COORDINATOR PARTICIPATION IN SIGN LOCATION: <br /> CONSTRUCTION/CONTRACT DOCUMENTS TO VERIFY FIELD CONDITIONS AND NOT ATTAINED THE DESIGN STRENGTH FOR THE CONDITIONS PRESENT. TWO (2) YEARS STARTING AFTER THE DATE OF SUBSTANTIAL COMPLETION OF NETWORK CARRIER CONSTRUCTION MANAGER SHALL MEET WITH ALL 00 <br /> ® <br /> THE PROJECT, UNLESS OTHERWISE WRITTEN IN THE CONTRACT BETWEEN THE CONSTRUCTION COORDINATOR'S TO OUTLINE CRITERIA FOR SIGN PLACEMENT. <br /> CONFIRM THAT THE PROJECT WILL BE ACCOMPLISHED AS SHOWN. PRIOR 25. PRIOR TO THE POURING OF ANY NEW SLAB OVER AN EXISTING SLAB THE OWNER AND THE CONTRACTOR. <br /> TO PROCEEDING WITH CONSTRUCTION, ANY ERRORS, OMISSIONS, OR EMPHASIS SHALL BE PLACED ON "CHALLENGING" SITES, WHERE THEill o <br /> s_ <br /> SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR SHALL VERIFY LOCATIONS OF ALL OPENINGS, CHASES, AND NETWORK CARRIER CONSTRUCTION MANAGERS SHALL GIVE CONSTRUCTION _I PACIFIC TELECOM SERVICES, <br /> DISCREPANCIESVERBALLYEQUIPMENT WHICH ARE TO BE IMPLEMENTED INTO THE NEW WORK. ALL 52. THE CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION FOR THE SAFETY COORDINATOR'S AS MUCH GUIDANCE ON EACH SPECIFIC SITUATION AS LLC <br /> ARCHITECT/ENGINEER AND INO <br /> WRITING. ITEMS DESIGNATED TO BE ABANDONED SHALL BE NOTED AND DISCUSSED OF THE OWNER'S EMPLOYEES, WORKMEN, AND ALL TIMES DURING THE POSSIBLE, HOWEVER, CONSTRUCTION COORDINATOR'S SHALL BE <br /> 3. FOR COLLOCATION SITES: CONTACT TOWER OWNER REPRESENTATIVE FOR WITH THE OWNER AND TOWER NETWORK CARRIER CONSTRUCTION PROJECT CONSTRUCTION OF THE PROJECT. ENCOURAGED TO PARTNER WITH NETWORK CARRIER CONSTRUCTION MANAGER BeyondthisPoint You are enteringanarea <br /> PORTICIPATIOIN BID WALK. MANAGER AS PART OF THE AS-BUILT DRAWING PACKAGE. IN DECIDING PLACEMENT PERTAINING TO CHALLENGING SITES. A SITE VISIT Where RF Emissions may exceed the FCC <br /> 53. THE CONTRACTOR SHALL BE REQUIRED TO PAY FOR ALL NECESSARY PERMITS MAY BE REQUIRED TO FULFILL REQUIREMENTS. CONSTRUCTION COORDINATOR General Population Exposure Limits <br /> 26. SEAL ALL PENETRATIONS THROUGH FIRE-RATED AREAS WITH U.L. LISTED OR AND/OR FEES WITH RESPECT TO THE WORK TO COMPLETE THE PROJECT. SHALL IDENTIFY ALL SIGN LOCATIONS AT THE A&E WALK. PLEASE SEE SIGN <br /> 4. DRAWINGS ARE NOT TO BE SCALED, WRITTEN DIMENSIONS TAKE FIRE MARSHALL APPROVED MATERIALS IF APPLICABLE TO THIS FACILITY AND BUILDING PERMIT APPLICATIONS SHALL BE FILED BY THE OWNER OR HIS <br /> PRECEDENCE, THIS SET OF DOCUMENTS IS INTENDED TO BE USED FOR OR PROJECT SITE. DETAIL AND SIZE. foworkilgintansignsan nmeguidelines <br /> DIAGRAMMATIC PURPOSES ONLY, UNLESS NOTED OTHERWISE. THE REPRESENTATIVE. CONTRACTOR SHALL OBTAIN PERMIT AND MAKE FINAL forworl<inginanRFenvironment <br /> PAYMENT FOR SAID DOCUMENT. 3. SIGN DISBURSEMENT FROM WAREHOUSE: ` ' \ <br /> GENERAL CONTRACTOR'S SCOPE OF WORK SHALL INCLUDE FURNISHING 27. BUILDING INSPECTORS AND/OR OTHER BUILDING OFFICIALS ARE TO BE SIGN INVENTORY SHALL BE ACCESSIBLE AT NETWORK CARRIER WAREHOUSE <br /> ALL MATERIALS, EQUIPMENT, LABOR, AND ANY REQUIREMENTS DEEMED NOTIFIED PRIOR TO ANY GRADING, CONSTRUCTION, AND ANY OTHER PROJECT 54. THE ARCHITECT/ENGINEER IN CHARGE SHALL SIGN AND SEAL ALL DRAWINGS TO BE DISBURSED AS PART OF THE GENERAL CONTRACTOR BOM AS CALLED 8828 REGISTERED <br /> NECESSARY TO COMPLETE PROJECT AS DESCRIBED IN THE DRAWINGS EFFORT AS MANDATED BY THE GOVERNING AGENCY. AND/OR SPECIFICATIONS. OUT IN A&E DRAWINGS FOR EACH SITE. ARCHITECT <br /> AND OWNER'S PROJECT MANUAL. // ' /~ <br /> 28. CONTRACTOR TO PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF 55. TOWER NETWORK CARRIER WILL REVIEW AND APPROVE SHOP DRAWINGS AND • / ,I ` <br /> 5. THE ARCHITECTS/ENGINEERS HAVE MADE EVERY EFFORT TO SET FORTH IN NOT LESS THAN 2-A OR 2-Al OBC WITHIN 75 FEET TRAVEL DISTANCE TO SAMPLES FOR CONFORMANCE WITH DESIGN CONCEPT. TOWER NETWORK <br /> THE CONSTRUCTION AND CONTRACT DOCUMENTS THE COMPLETE SCOPE OF ALL PORTIONS OF PROJECT AREA DURING CONSTRUCTION. CARRIER PROJECT APPROVAL OF A SEPARATE ITEM SHALL NOT INCLUDE ,✓RICHARD :HLLA <br /> WORK. CONTRACTORS BIDDING THE JOB ARE NEVERTHELESS CAUTIONED THAT APPROVAL OF AN ASSEMBLY IN WHICH THE ITEM FUNCTIONS. , STATE OF WASHINGTON <br /> MINOR OMISSIONS OR ERRORS IN THE DRAWINGS AND OR SPECIFICATIONS 29. THE PROJECT, WHEN COMPLETED, SHALL COMPLY WITH LOCAL SECURITY <br /> SHALL NOT EXCUSE SAID CONTRACTOR FROM COMPLETING THE PROJECT AND CODES AND TITLE-24 ENERGY CONSERVATION REQUIREMENTS. 24 TITLE- <br /> IMPROVEMENTS IN ACCORDANCE WITH THE INTENT OF THESE DOCUMENTS. ( 56. ALL ANTENNAS MOUNTED ON ROOF SUPPORT FRAMES TO BE PROVIDED BY EXPIRATION DATE OF THE <br /> LICENSE:08/20/13 <br /> WHEN APPLICABLE) TOWER NETWORK CARRIER COMMUNICATIONS. <br /> THE BIDDER SHALL BEAR THE RESPONSIBILITY OF NOTIFYING (IN WRITING) <br /> THE ARCHITECT/ENGINEER OF ANY CONFLICTS, ERRORS, OR OMISSIONS PRIOR 30. ALL GLASS AND GLAZING IS TO COMPLY WITH CHAPTER 54 OF THE U.S. 57. CONTRACTOR TO PROVIDE TRENCH AS REQUIRED TO INSTALL BOTH <br /> TO SUBMISSION OF CONTRACTOR'S PROPOSAL. IN THE EVENT OF CONSUMER SAFETY COMMISSION - SAFETY STANDARDS FOR ARCHITECTURAL ELECTRICAL AND TELEPHONE UNDERGROUND CONDUITS (#40 PVC) PER S.C.E. <br /> DISCREPANCIES THE CONTRACTOR SHALL PRICE THE MORE COSTLY OR GLAZING MATERIALS (42 FR 1428, CFR PART 1201) AND LOCAL SECURITY WORKORDER. BACKFILL WITH CLEAN SAND AND COMPACT TO THE <br /> EXTENSIVE WORK, UNLESS DIRECTED OTHERWISE. REQUIREMENTS. SATISFACTION OF THE DISTRICTS INSPECTOR. REPLACE FINISH GRADE WITH <br /> MATCHING MATERIALS (GRASS, ASPHALT, CONCRETE, ETC.) <br /> 6. DRAWINGS ARE NOT TO BE SCALED UNDER ANY CIRCUMSTANCE. TOWER NETWORK 31. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT EXISTING <br /> CARRIER IS NOT RESPONSIBLE FOR ANY ERRORS RESULTING FROM THIS PRACTICE IMPROVEMENTS, EASEMENTS, PAVING, CURBING, ETC. DURING CONSTRUCTION. 58. CONTRACTOR TO PROVIDE HEAVY STEEL PLATES AT OPEN TRENCHES FOR <br /> WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALE SHOWN ON PLANS. UPON COMPLETION OF WORK, CONTRACTOR SHALL REPAIR ANY DAMAGE SAFETY AND TO PROTECT EXISTING GROUND SURFACES FROM HEAVY <br /> THAT MAY HAVE OCCURRED DUE TO CONSTRUCTION ON OR ABOUT THE EQUIPMENT UTILIZED DURING CONSTRUCTION. <br /> 7. OWNER, CONTRACTOR, AND TOWER NETWORK CARRIER CONSTRUCTION PROPERTY. <br /> PROJECT MANAGER SHALL MEET JOINTLY TO VERIFY ALL DRAWINGS AND 59. CONTRACTOR TO PATCH AND REPAIR ALL GROUND SURFACES WITHIN THE <br /> SPECIFICATIONS PRIOR TO THE START OF CONSTRUCTION. 32. CONTRACTOR SHALL KEEP GENERAL WORK AREA CLEAN AND HAZARD FREE CONSTRUCTION AREA AS NECESSARY TO PROVIDE A UNIFORM SURFACE AND <br /> DURING CONSTRUCTION AND DISPOSE OF ALL DIRT, DEBRIS, AND RUBBISH. MAINTAIN EXISTING SURFACE DRAINAGE SLOPES. <br /> 8. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN AUTHORIZATION TO CONTRACTOR SHALL REMOVE EQUIPMENT NOT SPECIFIED AS REMAINING ON <br /> PROCEED WITH CONSTRUCTION PRIOR TO STARTING WORK ON ANY ITEM NOT THE PROPERTY OR PREMISES. SITE SHALL BE LEFT IN CLEAN CONDITION 60. CONTRACTOR TO REPLACE LANDSCAPE VEGETATION THAT WAS DAMAGED DUE <br /> CLEARLY DEFINED BY THE CONSTRUCTION DRAWINGS/CONTRACT DOCUMENTS. AND FREE FROM PAINT SPOTS, DUST, OR SMUDGES OF ANY NATURE. TO CONSTRUCTION, AND TO MODIFY REMAINING IRRIGATION LINES TO <br /> OPERATING CONDITION, PROVIDING FULL COVERAGE TO IMPACTED AREAS. <br /> 9. THE CONTRACTOR SHALL PERFORM WORK DURING OWNER'S PREFERRED 33. NEW CONSTRUCTION ADDED TO EXISTING CONSTRUCTION SHALL MATCH IN <br /> HOURS TO AVOID DISTURBING NORMAL BUSINESS. FORM, TEXTURE, FINISH, AND IN MATERIALS EXCEPT AS NOTED IN THE PLANS 61. IN THE CASE OF ROOFTOP SOLUTIONS FOR EQUIPMENT AND/OR ANTENNA <br /> AND SPECIFICATIONS. FRAMES WHERE PENETRATION OF EXISTING ROOFING MATERIALS OCCUR, <br /> 10.THE CONTRACTOR SHALL PROVIDE TOWER NETWORK CARRIER PROPER INSURANCE THE GENERAL CONTRACTOR SHALL COORDINATE WITH BUILDING OWNER AND <br /> LA v-CD <br /> CERTIFICATES NAMING TOWER NETWORK CARRIER AS ADDITIONAL INSURED, AND 34. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY BACKING, BLOCKING, BUILDING ROOFING CONTRACTOR OF RECORD FOR INSTALLATION, PATCH, <br /> TOWER NETWORK CARRIER PROOF OF LICENSE(S) AND PE & PD INSURANCE. AND/OR SLEEVES REQUIRED FOR THE INSTALLATION OF FIXTURES, REPAIR OR ANY AUGMENTATION TO THE ROOF, AND HAVE THE WORK <br /> MECHANICAL EQUIPMENT, PLUMBING, HARDWARE, AND FINISH ITEMS TO GUARANTEED UNDER THE ROOFING CONTRACTOR'S WARRANTY FOR MOISTURE 71' < OD <br /> 11. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT DESCRIBED IN INSURE A PROPER AND COMPLETE JOB. PENETRATION OR AND OTHER FUTURE BREACH OF ROOFING INTEGRITY. >-- rn <br /> THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE SOLELY <br /> RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, 35. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A PROJECT LEVEL, 62. IN THE CASE OF ROOFTOP SOLUTIONS WITH THE INSTALLATION OF ANTENNAS WITHIN O m <br /> SEQUENCES, AND PROCEDURES FOR COORDINATING ALL PORTIONS OF THE STRAIGHT, AND TRUE ACCORDING TO THE PLANS. THE CONTRACTOR SHALL CONCEALED (SHROUDED) SUPPORT FRAMES OR TRIPODS, THE GENERAL CONTRACTOR 5 <br /> U <br /> WORK UNDER THE CONTRACT. COMPARE THE LINES AND LEVELS OF THE EXISTING CONDITIONS WITH THOSE SHALL COORDINATE WITH THE FRP DESIGNER/FABRICATOR TO ENSURE THAT THE FINAL I- <br /> SHOWN ON THE PLANS PRIOR TO THE START OF ANY CONSTRUCTION. TOWER FRP SHROUD IS SIMULATING (IN APPEARANCE) DESIGNATED EXISTING EXTERIOR <br /> 12. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS NETWORK CARRIER SHALL BE NOTIFIED OF ANY ERRORS, OMISSIONS, OR N CC <br /> ACCORDING TO MANUFACTURER'S/VENDOR'S SPECIFICATIONS UNLESS NOTED INCONSISTENCIES PRIOR TO ANY CONSTRUCTION. BUILDING FACADE MATERIALS, TEXTURES, AND COLORS. THE CONTRACTOR SHALL W <br /> OTHERWISE OR WHERE LOCAL CODES OR ORDINANCES TAKE PRECEDENCE. FURTHERMORE ENSURE THE USE OF COUNTERSUNK FASTENERS IN ALL FRP > N L�ij <br /> CONSTRUCTION. WHEN PHOTOSIMULATIONS ARE PROVIDED, THE CONTRACTOR SHALL <br /> 36. THE CONTRACTOR IS TO PROVIDE PROTECTION FOR ADJOINING PROPERTIES <br /> 13. ALL WORK PERFORMED ON THE PROJECT AND MATERIALS INSTALLED SHALL FROM PHYSICAL HARM, NOISE, DUST, DIRT, AND FIRE AS REQUIRED BY THE ENSURE THAT FINAL CONSTRUCTION REPRESENTS WHAT IS INDICATED IN <br /> BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS, AND GOVERNING AGENCIES. PHOTOSIMULATION. SHOP DRAWINGS SHALL BE PROVIDED TO THE GENERAL F� <br /> CONTRACTOR, CONSTRUCTION COORDINATOR, AND ARCHITECT PRIOR TO FABRICATION <br /> ORDINANCES. CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH <br /> ALL LAWS, ORDINANCES, RULES, REGULATIONS AND LAWFUL ORDERS OF ANY 37. WHERE SPECIFIED, MATERIALS TESTING SHALL BE TO THE LATEST STANDARDS AND CONSTRUCTION. <br /> PUBLIC AUTHORITY, MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS, AND AND/OR REVISIONS AVAILABLE AS REQUIRED BY THE GOVERNING AGENCY 63. IN THE CASE OF ROOFTOP SOLUTIONS FOR EQUIPMENT AND/OR ANTENNA FRAMES <br /> LOCAL AND STATE JURISDICTIONAL CODES BEARING ON THE PERFORMANCE RESPONSIBLE FOR RECORDING THE RESULTS. WHERE ANCHORING TO A CONCRETE ROOF SLAB IS REQUIRED, CONTRACTORS SHALL <br /> OF THE WORK. CONFIRM (PRIOR TO SUBMITTING BID) WITH CONSULTING CONSTRUCTION COORDINATOR <br /> 38. THE CONTRACTOR IS RESPONSIBLE FOR THE STORAGE OF ALL MATERIALS AND ARCHITECT THE PRESENCE OF POST TENSION TENDONS WITHIN THE ROOF SLAB - <br /> 14. GENERAL CONTRACTOR SHALL PROVIDE, AT THE PROJECT SITE, A FULL AND SHALL NOT DO SO ON PUBLIC PROPERTY WITHOUT A PERMIT TO DO RESULTING FROM AN UNDOCUMENTED DESIGN CHANGE IN THE EXISTING BUILDING <br /> SET OF CONSTRUCTION DOCUMENTS UPDATED WITH THE LATEST REVISIONS SO FROM THE GOVERNING AGENCIES FOR THIS PURPOSE. <br /> AND ADDENDA OR CLARIFICATIONS FOR USE BY ALL PERSONNEL INVOLVED "AS-BUILT DRAWING SET" - HAVING INDICATED AN ORIGINAL DESIGN SOLUTION OF <br /> WITH THE PROJECT. THIS SET IS A VALID CONTRACT DOCUMENT ONLY IF 39. GENERAL NOTES AND STANDARD DETAILS ARE THE MINIMUM REQUIREMENTS REINFORCED CONCRETE W/ EMBEDDED STEEL REBAR. IN THE EVENT POST TENSION <br /> THE TITLE SHEET IS STAMPED "FOR CONSTRUCTION" AND EACH TO BE USED IN CONDITIONS WHICH ARE NOT SPECIFICALLY SHOWN SLAB SOLUTION IS PRESENT, CONTRACTOR SHALL INCLUDE PROVISIONS FOR X-RAY <br /> SUCCESSIVE SHEET BEARS THE ARCHITECT'S SIGNED WET STAMP. OTHERWISE. PROCEDURES (INCLUDED IN BID) FOR ALL PENETRATION AREAS WHERE ANCHORING <br /> OCCURS. <br /> 15. A COPY OF GOVERNING AGENCY APPROVED PLANS SHALL BE KEPT IN A 40. TRADES INVOLVED IN THE PROJECT SHALL BE RESPONSIBLE FOR THEIR <br /> PLACE SPECIFIED BY THE GOVERNING AGENCY, AND BY LAW, SHALL BE OWN CUTTING, FITTING, PATCHING, ETC., SO AS TO BE RECEIVED 64. GENERAL & SUB CONTRACTORS SHALL USE STAINLESS STEEL METAL LOCKING TIES FOR <br /> AVAILABLE FOR INSPECTION AT ALL TIMES. THE PLANS ARE NOT TO BE USED PROPERLY BY THE WORK OF OTHER TRADES. ALL CABLE TRAY TIE DOWNS AND ALL OTHER GENERAL TIE DOWNS (WHERE <br /> BTHE WORKMEN. ALLEINR AGENCY SETS SHALL REFLECT THEOSAME APPLICAB41. ALL DEBRIS AND REFUSE IS TO BE REMOVED FROM THE PROJECT PREMISES NETWORKLE).CARRIERSTIC ZIP PROJECTS.TIES <br /> RECOMMEN ED MANUFACTURE FOR <br /> SHALLUSE <br /> BE: PANDUIT CORP. <br /> INFORMATION AS GOVERNING AGENCY APPROVED PLANS. THE CONTRACTOR <br /> SHALL ALSO MAINTAIN ONE SET OF PLANS, IN GOOD CONDITION, COMPLETE AND SHALL BE LEFT IN A CLEAN (BROOM FINISH) CONDITION AT ALL TIMES METAL LOCKING TIES MODEL NO. MLT4S-CP UNDER SERIES-304 (OR EQUAL). PANDUIT <br /> WITH ALL REVISIONS, ADDENDA, AND CHANGE ORDERS ON THE PREMISES AT BY EACH TRADE AS THEY PERFORM THEIR OWN PORTION OF THE WORK. PRODUCT DISTRIBUTED BY TRIARC. REVISIONS <br /> ALL TIMES UNDER THE DIRECT CARE OF THE SUPERINTENDENT. THE <br /> CONTRACTOR SHALL SUPPLY TOWER NETWORK CARRIER CONSTRUCTION 42. TOWER NETWORK CARRIER DOES NOT GUARANTEE ANY PRODUCTS, FIXTURES, 65. ALL WORK TO BE DONE BETWEEN HOURS OF 8:00 AM AND 5:00 PM, EXCLUDING NO. DATE DESCRIPTION INITIAL <br /> PROJECT MANAGER. WITH A COPY OF ALL REVISIONS, ADDENDA, AND/OR AND/OR ANY EQUIPMENT NAMED BY A TRADE OR MANUFACTURER. GUARANTEE HOLIDAYS A 02/24/12 ISSUED FOR PCD REVIEW TB <br /> CHANGE ORDERS AT THE CONCLUSION OF THE WORK AS A PART OF THE OR WARRANTY THAT MAY BE IN EFFECT IS DONE SO THROUGH THE COMPANY 0 03/19/12 ISSUED FOR FINAL CONSTRUCTION WJR <br /> AS-BUILT DRAWING RECORDS. OR MANUFACTURER PROVIDING THE PRODUCT, FIXTURE, AND/OR EQUIPMENT 1 04/19/12 REVISED FOR FINAL CONSTRUCTION WJR <br /> ONLY: UNLESS SPECIFIC RESPONSIBILITY IS ALSO PROVIDED BY THE 2 04/24/12 REVISED FOR FINAL CONSTRUCTION AF , <br /> 16. THE STRUCTURAL COMPONENTS OF ADJACENT CONSTRUCTION OR FACILITIES CONTRACTOR/SUBCONTRACTOR IN WRITTEN FORM. 3 05/14/12 REVISED FOR FINAL CONSTRUCTION PHD <br /> ARE NOT TO BE ALTERED BY THIS CONSTRUCTION PROJECT UNLESS NOTED <br /> OTHERWISE. 43. CAUTION! CALL BEFORE YOU DIG! BURIED UTILITIES EXIST IN THE AREA 4 09/11/12 ISSUED FOR FINAL CONSTRUCTION SS <br /> AND UTILITY INFORMATION SHOWN MAY NOT BE COMPLETE. CONTACT 5 09/18/12 SUBMITTAL SET PHD <br /> 17. THE CONTRACTOR SHALL STUDY THE STRUCTURAL, ELECTRICAL, MECHANICAL, THE ONE-CALL UTILITY LOCATE SERVICE A MINIMUM OF 48 HOURS PRIOR <br /> AND PLUMBING PLANS AND CROSS CHECK THEIR DETAILS, NOTES, TO CONSTRUCTION. 1-800-424-5555. <br /> DIMENSIONS, AND ALL REQUIREMENTS PRIOR TO THE START OF ANY WORK. <br /> 44. CONTRACTOR TO REPLACE AND/OR REROUTE ANY EXISTING UNDERGROUND <br /> 18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF UTILITIES ENCOUNTERED DURING TRENCHING AND GENERAL CONSTRUCTION. <br /> THE PROJECT AND SITE WHILE THE WORK IS IN PROGRESS UNTIL THE JOB NOT FOR CONSTRUCTION UNLESS <br /> IS COMPLETE. 45. CONTRACTOR TO LOCATE ALL UTILITIES PRIOR TO PLACEMENT OF MONOPOLE LABELED AS CONSTRUCTION SET <br /> FOOTING AND OTHER STRUCTURES TO BE PLACED IN GROUND. SEE GENERAL <br /> 19. THE CONTRACTOR HAS THE RESPONSIBILITY OF LOCATING ALL EXISTING NOTE #6 ON THIS SHEET. <br /> UTILITIES WHETHER OR NOT SHOWN ON THE PLANS, AND TO PROTECT THEM SHEET TITLE <br /> FROM DAMAGE. THE CONTRACTOR, OR SUBCONTRACTOR AS SPECIFIED IN THE 46. SEE CIVIL DRAWINGS FOR ADDITIONAL SITE INFORMATION. <br /> AGREEMENT BETWEEN SUBCONTRACTOR AND CONTRACTOR, SHALL BEAR THE GENERAL NOTES <br /> EXPENSES OF REPAIR AND/OR REPLACEMENT OF UTILITIES OR OTHER 47. CONTRACTOR TO DOCUMENT ALL WORK PERFORMED WITH PHOTOGRAPHS AND <br /> PROPERTY DAMAGE BY OPERATIONS IN CONJUNCTION WITH THE EXECUTION SUBMIT TO TOWER NETWORK CARRIER ALONG WITH REDLINED CONSTRUCTION SET. <br /> OF THE WORK. <br /> 48. CONTRACTOR TO DOCUMENT ALL CHANGES MADE IN THE FIELD BY MARKING <br /> 20. THE REFERENCES ON THE DRAWINGS ARE FOR CONVENIENCE ONLY AND UP (REDLINING) THE APPROVED CONSTRUCTION SET AND SUBMITTING THE SHEET NUMBER <br /> SHALL NOT LIMIT THE APPLICATION OF ANY DRAWING OR DETAIL. REDLINED SET TO TOWER NETWORK CARRIER UPON COMPLETION. <br /> 21. ALL DIMENSIONS ON THE PLANS ARE TO FACE OF STUD (F.O.S.) UNLESS <br /> G_1 <br /> NOTED OTHERWISE (U.N.O.). 2707 Colby Ave B1209-035 <br /> THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED. <br />