Laserfiche WebLink
ORDINANCE NO. 4L.1 - 7'7 <br /> AN ORDINANCE authorizing the design and construction of <br /> a new concrete prestressed girder bridge to replace the <br /> existing Maple Heights timber trestle bridge and creating <br /> a special design and construction fund entitled "Maple <br /> Heights Bridge Replacement". <br /> WHEREAS, the City Council of the City of Everett is aware of the hazards <br /> to pedestrians and motor vehicles at the existing Maple Heights Bridge <br /> crossing due to the substandard width of the structure; and <br /> WHEREAS, the City Council of the City of Everett is aware that the <br /> existing structure is nearing the end of its useful lifespan and load <br /> limitations have been placed on the structure; and <br /> WHEREAS, at an open house meeting at View Ridge School on April 19, <br /> 1977, 100% of all persons in attendance expressed the position that the <br /> existing structure was dangerous and should be replaced; and <br /> WHEREAS, the City Council in June 1975 did pass Ordinance No. 359-75 <br /> which appropriated $48,000 for the Phase I preliminary design study and <br /> Phase II detail design phase with the understanding that additional funding <br /> might be required at a later date to complete Phase II; and <br /> WHEREAS, the City Council on May 18, 1977, after reviewing the Phase I <br /> preliminary design study did select the Concrete Prestressed Girder (Alternate <br /> #3) as the recommended choice for a structure to replace the existing Maple <br /> Heights Bridge and by Resolution 1298, directed the Mayor to prepare this <br /> Plans and Systems Ordinance which officially authorizes and funds the detail <br /> design and construction of this structure; <br /> NOW, THEREFORE, BE IT ORDAINED THAT: <br /> Section 1 <br /> A special design and construction fund is hereby established <br /> as Furid No. 321 entitled MAPLE HEIGHTS BRIDGE REPLACEMENT. <br /> All revenue and expenditures for the design, construction and <br /> associated activities required to design and construct the <br /> improvement shall be recorded in this fund. <br /> Section 2 <br /> Approval of the "Supplemental Agreement to Phase I Maple Heights <br /> Bridge Preliminary Engineering Study to provide for Phase II follow- <br /> on detail design and Phase III construction support," for a cost <br /> not to exceed $50,600 is hereby granted and the Mayor is authorized <br /> to enter into formal contract with the consultant for the design of <br /> the replacement structure based on design Alternate Number 3 (Concrete <br /> Prestressed Girder) as presented in the Preliminary Design Study. <br />