Laserfiche WebLink
Section 15: ELECTRICAL PERMIT FEES. A fee for each electrical <br /> permit shall be paid to the Building Official as set forth herein: <br /> TYPE OF WORK FEE <br /> Single Family (New) <br /> 100 Amp 16.00 <br /> 150 20.00 <br /> 200 24.00 <br /> 300 30.00 <br /> 400 45.00 <br /> 500 56.00 <br /> 600 64.00 <br /> 800 75.00 <br /> In excess of <br /> 800 Amp Service Max. of <br /> 100.00 <br /> Multiple Family (New) Same as for <br /> New Single Family <br /> House Meter 16.00 <br /> New Circuits, Circuit 5.00 for 1 <br /> Extensions & Alterations to 4 ckts & <br /> 2.00 each additional <br /> Feeders & Altered <br /> Services Under 600 Volts <br /> Not exceeding 100 Amp 10.00 <br /> Not exceeding 150 Amp 15.00 <br /> Not exceeding 200 Amp 20.00 <br /> Not exceeding 300 Amp 30.00 <br /> Not exceeding 400 Amp 35.00 <br /> Not exceeding 600 Amp 55.00 <br /> Not exceeding 1000 Amp 75.00 <br /> Not exceeding 1500 Amp 100.00 <br /> Exceeding 1500 Amp 125.00 <br /> Feeders & Altered <br /> Services over 600 Volts <br /> 1 KVD or less 5.00 <br /> 5 KVD or less 10.00 <br /> 15 KVD or less 25.00 <br /> 20 KVD or less 30.00 <br /> 30 to 50 KVD 40.00 <br /> Over 50 KVD 50.00 <br /> Commercial <br /> Job Cost: <br /> 250.00 or less 10.00 <br /> 251.00 - 1000.00 10.00 plus 2% <br /> 1001.00 - 4000.00 30.00 plus 1% <br /> -5- <br />