My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7407 EVERGREEN WAY BOSTON CHICKEN 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
7407
>
BOSTON CHICKEN
>
7407 EVERGREEN WAY BOSTON CHICKEN 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2018 11:42:32 AM
Creation date
10/17/2018 11:40:55 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7407
Tenant Name
BOSTON CHICKEN
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION FOR DEVELOPER: <br />Thc fotlowing infortnation is providcd for thc dcvcloper's bcnefit. Tl�csc arc not SEPA conditions. <br />All requirements are prcliminary in naturc, and arc based upon the prcliminaq� site plan and thc <br />ordinances in effect at time of submittal for SEPA revicw. The proposal must comply with all <br />ordinances in effect at the time a complete building permit applicntion is filed, including those <br />not specifically set (orth herein. (Exception: For vesting under the Zoning Code, pleasc refer to <br />Sxtion 44 of thc Zoning Codc). Contact thc Planning Dcpartruent for infamiation regarding <br />appeals processes for thc requirements listcd in this document. <br />Detailed drawings in accordance with city detign and construction standards shall <br />be submitted to the Public Works Department showing site parking layout. <br />Landscapin�, utilities, storm drainage, temporary construction erosion control, and <br />all required improvements in the public right-of-way. Public Works Department <br />approval of these drawings is required prior to any permits being issued. All <br />improvements shall be completed, approved and warranted before the Occupancy <br />Permit is issued. <br />2. On-site detention of stormwater runoff from impervious areas may be required per <br />City standards if there will be an increase in the amount of impervious surface on <br />the site. <br />3. Treatment of stormwater runoff from the paved areas must occur, per City <br />standards, prior to discharge of the stormwater from the site or to a stream or <br />wetland. <br />4. This project is classi6ed as a redevelopment project. As such, the City allows <br />more flexibility than with new projects when designing and constructing <br />stormwater treatment facilities. On this site, either a baf�lo-type oiVwater <br />separator in series with a vegetated swale, or a wetpond by itsel£ will be required <br />ro treat stormwater runoff from paved surfaces. All treatment facilities must be <br />designed and constructed according to City standards. <br />5. When a vegetated swale is provided for treatment of storm water, a minimum of <br />10 feet of essentially flat �round must be provided between the swale and any <br />adjacent buildings. <br />6. Special charges for connection to the public sewer and water systems in <br />accordance with Ordinance 1171-85 and subsequent revision area applicable. <br />These charges are based on projected water usage and can be substantial. <br />Applicant is encouraged to obtain a copy of the Ordinance and deternune estimate <br />of charges prior to building permit application. The actual chazges shall be <br />computed by the Public Works Department per tlie ordinance in eftect at the time <br />and according to the information on the approved plans at the time of building <br />permit issuance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.