Laserfiche WebLink
g. 'fhe more of6ce windows that are visible to the �arking area, the safer the area <br />is from assaults and thefts. <br />h. If utilizing fencing, it should be 6 feet c�ain link. <br />During the final stages of construction, please contact Dick T6omberry, Crime <br />Prevendon Officer, at 259-0416 for further security recommendadons. <br />2. The Snohomish County PUD cumndy has sufficient capacity to serve the proposed <br />development. For further i�focmation about the electrical service requ'vements for this <br />project, please call Kurt Mmtin of the Disa�icYs Customer Engioeering Office, Everett <br />at 258-8291. <br />GTE Northwen Incocporated will provide service to the site. However, new telephone <br />cabte consavction w'ill be required in conjunction with the s'tc development. GTE's <br />engineeriag will begin when they are notified of your consauction schedules and <br />telep6one requirements. <br />It will be the developer's responsibility to provide a suitable combination of conduit <br />and trenchiag and/or riser conduit ro accommodate G1'E's netsvork communicadons <br />cable within the complez. Provided that an acceptable combination of coeduit and/or <br />a'eaching is incorporated into the projecc to accommodate GTE's entrance cable, there <br />will be ao costs to the developer for GTE's cable. <br />If a rearrangement of existing cables on pmmises or on the right-of-way is necessary, <br />appropriate charges will be eslimated and G1'E's Guaranty of Paymeat form will bc <br />forwarded co you for your signature: Prior to cammencement of GTE's engineering <br />for such rearrangement, a deposit w��l be required. To insure dmely telephone service, <br />GTE requests ninety (JO) days lead time for engineering, procurement, aad insreliation <br />of cable and/or GTE's equipment. <br />Please contact Mic6ael Hupf, Senior Engineer, at 356-4052 should you roquire <br />addi6onal informatioa. <br />C\MO�M�AVe►A!q),Dp� <br />