My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gibson Traffic Consultants Inc 10/18/2018
>
Contracts
>
6 Years Then Destroy
>
2019
>
Gibson Traffic Consultants Inc 10/18/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 11:03:22 AM
Creation date
10/25/2018 11:03:17 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Gibson Traffic Consultants Inc
Approval Date
10/18/2018
End Date
12/31/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Transportation Mitigation Fee Study
Tracking Number
0001458
Total Compensation
$15,100.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E.X 14 ► l T 6-,IA <br /> EX IA 1 6 1 T Gvm�hs%�-r ic�/1 <br /> •. . , raffic Consultants, Inc. <br /> Transportation Planners and Traffic Engineers <br /> September 17, 2018 Proposal No.: 18-224—FP-1 <br /> Ryan L. Sass, P.E. <br /> City Engineer I Public Works - Engineering <br /> 3200 Cedar <br /> Everett WA 98201 <br /> 425.257.8942 <br /> Dear Ryan: <br /> Per your request, Gibson Traffic Consultants (GTC) is pleased to provide you with a fee proposal to conduct <br /> the City of Everett Mitigation Fee Evaluation Based on GTC's experience, GTC can complete evaluation on <br /> a time and materials basis not to exceed$15,100. <br /> SCOPE OF WORK <br /> 1. Documented transportation mitigation revenue by year since 2014 and 3 Hrs. $450 <br /> comparison to prior tracking. (Raw data Provided by city) <br /> 2. Explore/update the increase in construction costs since the present fee was 2 Hrs. $300 <br /> updated in 2014 and the increased future trip forecast from the latest PSRC model <br /> 3. Update the transportation impact fee rates for up to 20 other jurisdictions in 5 Hrs. $750 <br /> Washington State using easily available material and MRSC Data. Document in a <br /> graphical format <br /> 4. Considered the merits of a CBD and Paine Field sub area verses city-wide impact 10 Hrs. $1,500 <br /> fees, i.e.,with and without Paine Field sub area <br /> 5. Establish projects eligible for the cost fee basis by determining any existing 30 Hrs. $4,500 <br /> deficiencies and future capacity need due to development like the September 2009 <br /> mitigation memo. <br /> 6. Identify if and what Transportation Management strategies/plan should be added 5 Hrs. $750 <br /> to take advantage of the discount in the Metro Area <br /> 7. Calculate a fee per unit type and per SF for main categories that include any pass- 10 Hrs. $1,500 <br /> by reduction or Metro zone discount. <br /> 8. Administration hours for report/memo writing reviewing, initial draft comments 15 Hrs. $2,250 <br /> and producing final report and power point presentation. <br /> 9. Meetings—Assumes only 2 local meetings 4 Hrs. $600 <br /> 10. Management Reserve @ =20% maybe authorized on a per task basis for additional <br /> or unforeseen tasks. $2,500 <br /> TOTAL CONTRACT AMOUNT INCLUDING MANAGEMENT RESERVE 84 Hrs. $15,100 <br /> 2813 Rockefeller Avenue,Suite B•Everett WA,98201 <br /> Tel:425-339-8266•Fax:425-258-2922•E-mail:info@gibsontraffic.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.