Laserfiche WebLink
+ �a <br /> Section 9 <br /> Impervious surface or area is defined by the Washington State Stormwater Management <br /> Manual for Western Washington. <br /> Section 10 <br /> The charge schedule in effect at the time of permit issuance shall apply to the <br /> charge assessed for system development charges. <br /> Section 11 Section 11 of Ordinance 3095-08 (codified at EMC 14.08.135.x)is <br /> amended as follows, with underlines added and strikeouts deleted: <br /> A. - - -• - . : - - •• -: If the applicant is changing water service size due <br /> to a change in the land use or constructing new facilities on a site previously <br /> connected to the water and/or the sewer system, credit for both water and sewer <br /> connection charges shall be given for the previous service size historical water <br /> and/or the sewer system. -- <br /> B. In the event an applicant has paid water charges but was not previously <br /> charge g only. In the case where there is an existing water service and customer is <br /> only connecting to sewer,there shall be a system development charge only for <br /> sewer based on existing water service size. <br /> • <br /> 10 <br />