My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/10/24 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/10/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2018 9:22:32 AM
Creation date
10/30/2018 9:21:09 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+ �a <br /> Section 9 <br /> Impervious surface or area is defined by the Washington State Stormwater Management <br /> Manual for Western Washington. <br /> Section 10 <br /> The charge schedule in effect at the time of permit issuance shall apply to the <br /> charge assessed for system development charges. <br /> Section 11 Section 11 of Ordinance 3095-08 (codified at EMC 14.08.135.x)is <br /> amended as follows, with underlines added and strikeouts deleted: <br /> A. - - -• - . : - - •• -: If the applicant is changing water service size due <br /> to a change in the land use or constructing new facilities on a site previously <br /> connected to the water and/or the sewer system, credit for both water and sewer <br /> connection charges shall be given for the previous service size historical water <br /> and/or the sewer system. -- <br /> B. In the event an applicant has paid water charges but was not previously <br /> charge g only. In the case where there is an existing water service and customer is <br /> only connecting to sewer,there shall be a system development charge only for <br /> sewer based on existing water service size. <br /> • <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.