Laserfiche WebLink
. . , , LSI Adapt <br />The conclusions and recommendations presented in this repurt are based, in part, on thc explorations that <br />we performed for this s[udy. If variations in subsurface conditions are discovered during earthwork, we <br />may need to modify this report. The future perfbrmance and integriry of the tower ;oundations will <br />depend largely on proper initial site preparation, drainage, and construction procedures. Monitoring by <br />experienced geotechnical personnel should be considerad an integral parl of the construction process. We <br />are available to provide geotechnical engineering services during the earthwork and foundation <br />conswction phases of the project. If variations in the subgrade conditions are observed at that time, we <br />would be able to provide additional geotechnical recommendations, thus minimizing delays as L�e project <br />develops. We are also available to review preliminary plans and specifications before construction <br />begins, and to provide geotechnical inspection and testing services during construction. <br />Sprint PCS AuEvs� 4, 2003 �/7 <br />Adapt Projcct No. 11'A03 �/730 � Pagc 10 <br />