My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9929 EVERGREEN WAY HORIZON BANK 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
9929
>
HORIZON BANK
>
9929 EVERGREEN WAY HORIZON BANK 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2018 3:35:24 PM
Creation date
10/30/2018 3:33:20 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9929
Tenant Name
HORIZON BANK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL INFORMATION <br />1. Puget Sound Energy is the natural gas provider in this 2�ea. To initiate new <br />service orders, please contact Marilyn Uavis Westlund at (425)356-7512 at least <br />90 days prior to the required in-service date. <br />Any relocation of existing gas facilities for this development will be at the <br />developer's sole expense, and requires 90 days minirnum notice. Please contact <br />Elai�e Babby at (206)224-2018 to coordinate relocation requests. <br />2. The Snohomish County PUD currently has sufficient capacity to serve the <br />proposed development. For further information about the electrical service <br />requirements for this project, please call f:urt Martin of the District's Customer <br />Engineering Office, Everett at 258-8291. <br />3. Verizon Northwest has facilities near this location. However, any building <br />entrances must be coordinated at least 60 days in advance. The cost of any <br />relocation of Verizon facilities that is required to construct thc new apartments <br />will be at the total expense of the developer. Any relocation will take 60 to 120 <br />days. Please contact Mike Hupf, Engineer at (425)356-40�2 or Mike Bly, <br />Engineer at (425)356-4034 if you have any questions regarding this building <br />entrance. <br />4. Verizon Northwest will provide service to the site. However, new telephone cable <br />construction will be required in conjunction with the site development. Verizon's <br />engineering will begin when they are notified of your construction schedules and <br />telephone requiremenis. <br />5. It will be the developer's responsibility to provide a suitable combination of <br />conduit and trenching and/or riser conduit to accommodate Verizon's network <br />communications cable within the complex. Provided that an acceptable <br />combination of conduit and/or trenching is incorporated into the project to <br />accommodate Verizon's entrance cable, there �,vill be no costs to the d2���loper <br />for Verizon's cable. <br />6. If a rearrangement of existing cables on premises or on the right-of-�vay is <br />necessary, appropriate charges will ba estimated and Verizon's Guaranty of <br />Payment form will be forwardec+ tn y�u for your signature. Prior to <br />commencement of Verizon's Enginea; ing for such rearrangement, a deposit will <br />be required. To insure timely ie�eohone service, Verizon requests ninety (90) <br />days lead time for engineering, procurement, and installation of cable and/or <br />Verizon's equipment. <br />Please contact Michael Hupf, Engineer, at (425)356-4052 or Mike Bly, Engineer <br />at (425)356-4034 should you require additional information. <br />S:\ftiidJiy\1VN\5'ORD�S[PAIS�PA #Ui.05911onzon I3anF:.dot <br />10 <br />�4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.