Laserfiche WebLink
GENERAL INFORMATION <br />1. Puget Sound Energy is the natural gas provider in this 2�ea. To initiate new <br />service orders, please contact Marilyn Uavis Westlund at (425)356-7512 at least <br />90 days prior to the required in-service date. <br />Any relocation of existing gas facilities for this development will be at the <br />developer's sole expense, and requires 90 days minirnum notice. Please contact <br />Elai�e Babby at (206)224-2018 to coordinate relocation requests. <br />2. The Snohomish County PUD currently has sufficient capacity to serve the <br />proposed development. For further information about the electrical service <br />requirements for this project, please call f:urt Martin of the District's Customer <br />Engineering Office, Everett at 258-8291. <br />3. Verizon Northwest has facilities near this location. However, any building <br />entrances must be coordinated at least 60 days in advance. The cost of any <br />relocation of Verizon facilities that is required to construct thc new apartments <br />will be at the total expense of the developer. Any relocation will take 60 to 120 <br />days. Please contact Mike Hupf, Engineer at (425)356-40�2 or Mike Bly, <br />Engineer at (425)356-4034 if you have any questions regarding this building <br />entrance. <br />4. Verizon Northwest will provide service to the site. However, new telephone cable <br />construction will be required in conjunction with the site development. Verizon's <br />engineering will begin when they are notified of your construction schedules and <br />telephone requiremenis. <br />5. It will be the developer's responsibility to provide a suitable combination of <br />conduit and trenching and/or riser conduit to accommodate Verizon's network <br />communications cable within the complex. Provided that an acceptable <br />combination of conduit and/or trenching is incorporated into the project to <br />accommodate Verizon's entrance cable, there �,vill be no costs to the d2���loper <br />for Verizon's cable. <br />6. If a rearrangement of existing cables on premises or on the right-of-�vay is <br />necessary, appropriate charges will ba estimated and Verizon's Guaranty of <br />Payment form will be forwardec+ tn y�u for your signature. Prior to <br />commencement of Verizon's Enginea; ing for such rearrangement, a deposit will <br />be required. To insure timely ie�eohone service, Verizon requests ninety (90) <br />days lead time for engineering, procurement, and installation of cable and/or <br />Verizon's equipment. <br />Please contact Michael Hupf, Engineer, at (425)356-4052 or Mike Bly, Engineer <br />at (425)356-4034 should you require additional information. <br />S:\ftiidJiy\1VN\5'ORD�S[PAIS�PA #Ui.05911onzon I3anF:.dot <br />10 <br />�4 <br />