Laserfiche WebLink
COMcheck Software Version 3.9.1 <br /> Mechanical Requirements <br /> Description <br /> 90.1 (2007) Standard <br /> The following list provides more delailed descriplions of lhe requirements in Section 4 of lhe Mechanical Compliance <br /> Certificate. <br /> Requirements Specific To: HVAC System 1 : <br /> U 1. Equipmenl minimum efficiency: <br /> � 2. For cooling systems<=240 kBtWh,mazimum hol gas bypass capacity must bo no more than 50%�olal cooling capaciry. <br /> Requirements Specific To: HVAC System 2 : <br /> � 1. Equipmenl minimum eKciency: <br /> U 2. In�egra�ed air economizer is required for individual cooling sys�ems over 65 kBtWh or 135 kB1uRi(dapending on Gimale zone),and <br /> allows modulation of outdoor air and retum air dampers�o provide up to 100%of the design supply air quantity as outdoor air for <br /> caoling.All air economizers shall be capable of aulomatically redudng outdoor air in�ake lo lhe design minimum ou�door air quanlity <br /> when outdoor air intake will no longor reduce coding energy usage.Refer lo code Section 6.5.1.1.3(or details on high-limit shutoff <br /> control types and settings. <br /> U 3. Air ewnomizer dampers can be sequenced with the cooling equipment and not coMmlled exc�usively by mixed aIr temperature. <br /> - Exception:Syslem coMrolled 1rom space lemperature(su:h as single-zone systems). <br /> � 4. For coolinc�systems=240 kBW/h,mazimum hot gas bypass capacity must be no more than 50%lotal cooling capacity. <br /> Requirements Specific To:Water Heater 1 : <br /> � 1. Water heatin�equipment meets ASHRAE 90.1-1999 minimum etfidency requirements: <br /> � 2. Service water hea�ing syslem design loads for the puipose of sizin�systems and equipmen[must bo delermined in accordance with <br /> manufacturers'published sizing guidelines. <br /> � 3. �nsulation must be provided for the first 0 R ol oullet piping(or a constant lemperalure nonrecirculating slorage syslern and f�r Ihe inlet <br /> pipta between the storage lank and a heat Irep in a slorago system. <br /> U 4. TemperaWre contmis must be provided thal allow for staage temperature adjuslmeN from 120'F or Iower to a maximum�emperature <br /> compatiblo with lhe intended use excepl when the manufaclurefs inslallalion insWctions speci(y a higher minimum thermostat setting <br /> lo minimize condensation and resulting cortosion. Documentation of the installation instructions must ba pmvided to be ezempted trom <br /> lhis requirement. <br /> � 5. Hoal lraps must be provided on inlet and outlet vertipl pipe risers sarving slorage water heaters and storage tanks not having integral <br /> heat lraps and serving a nonredreulating system. <br /> Heal traps musl be installed as Gose as practical to lhe storage tank.Acceptable heat treps are either <br /> a) a device specifically desi�ned for�he purpose or <br /> b)an arrangement of tubing that fortns a loop of 360'F, or <br /> c)piping lhat tmm the point of wnnection lo the water heater(inlel or outlel)indudes a length of piping direded downwards before <br /> conneCion to lhe mrtical piping of�he supply water or hot water distribution system. <br /> Generic Requirements: Must be met by all systems to which the requirement is applicable: <br /> 1. Tho system or zone contml must be a proc�rammable lhertnoslat or other automatic control meeling the following criteria: <br /> a)capable of setting back lemperature l0 55°F during hea�ing and setting up to BS°F during cooling, <br /> b)capable of automatically setting back or shutting down systems during unoaupied hours using 7 different,iay schedules, <br /> c)have an accessib�e 2-hour occupant ovartide, <br /> d)have a battery back•up c�pable of maintaining programmed seltings lor at least 10 hours without power. <br /> Exception(s): <br /> - A setback or shutoH conlml is not required on thermostals that conWl systems servirg areas Ihat opf�rata conlinuously. <br /> 2. All pipes:,erving space�conditioning syslems musl be insuWted as follows: <br /> Hot waler piping for healing systems: <br /> 1 in.tor pipes<=1 tl2-in.nominal ci2meter, <br /> 2 in.for pipes>7 112-in.nominal diameter. <br /> Chilled water,re(ngerant,and brine F�ipinc�systems: <br /> 1 in.insulation for pipes<=7 12-in.nominal diameter, <br /> 1 V2 in.insulafion for pipes>1 1Y2-In.nominal diamelar. �� <br /> Sleam piping: <br /> 1 1l2 in.insulalion for pipes<=7 1l2-in.nominal diame�er, <br /> 3 in.insulation for pipes>1 1YL-in.nominal diamaler. <br /> 6cception(s): <br /> - Factory-installed piping within FIVAC equipment. <br /> - Pipinc�thal conveys tluids having a dosign operating lemperature mnge between 60°F and 105°F. <br /> Projed Title: 7-Eleven Inc Report date:OB127/12 <br /> Dala filename:J12012 Projeds\72-00169 1029573 Everott,WA Evergreen Way�MEP�Energy Calcs112-00769 Everett WA.cck Page 6 of 8 <br />