My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2730 FEDERAL AVE EVERETT SHIPYARD 2018-01-02 MF Import
>
Address Records
>
FEDERAL AVE
>
2730
>
EVERETT SHIPYARD
>
2730 FEDERAL AVE EVERETT SHIPYARD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2022 10:27:30 AM
Creation date
11/5/2018 11:30:01 AM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2730
Tenant Name
EVERETT SHIPYARD
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION FOR DEVELOPER: <br />The following information is provided for the developer's benefit. These are not SEPA conditions but are <br />associated with other laws or requirements. All requirements are preliminary in nature, and are based upon <br />the preliminary site plan and the ordinances in effect at time of submittal for SEPA review. The proposal <br />must comply with all ordinances in effect at the time a complete building permit application is filed, including <br />those not specifically set forth herein Contact the Planning Department for information regarding appeals <br />processes for the requirements lister; in tl-' document. <br />1. Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br />2. City streets and alleys are to be kept clear of dirt and debris at all times during construction. Dust <br />suppression and street cleaning must occur as directed by the Public Works Inspector. <br />3. Any broken or damaged sidewalk shall be repaired/replaced per the City Public Works Inspector. <br />4. All exposed ground must be reseeded within 30 days of the completion of construction. If reseeding is <br />not practical due to weather or seasonal problems, the ground must be covered with mulch as directed <br />by the City Engineer. <br />5. Temporary erosion control measures for construction activity must be operational prior to <br />comroencement of any clearing or earthwork. <br />6. NFPA 13 sprinkler system is required unless structure is of Type I construction and complies as an open <br />parking garage. <br />7. NFPA 72 Fire Alarm System required. <br />8. This building will require a building permit from the City of Everett. <br />9. There are sanitary sewer mains in the vicinity of this work, which need to be located and marked, prior <br />to construction beginning. Sewer mains located in the proposed building footprint will need to be re- <br />routed. <br />11. Zoning and shoreline permit requirements will be addressed in the shoreline permit decision document. <br />12. The International Fire Code requires that all new structures shall provide Fire Department access roads <br />to within 150 feet of all portions of the ground floor. Fire Department access roads (Fire Lanes) shall <br />provide a minimum of 20 feet in width of unobstructed, paved driving surface with a minimum clear <br />heigPtt of 13'6". Inside turn radii must be 35 feet. Slope approach and departure angles must not <br />exceed 10 degrees. Fire lane grade must not exceed 15 percent. Fire lane construction must comply <br />with AASHTO H30 load capacity. Fire Lanes will be posted and maintained as required by the Fire <br />Department. <br />13. A fire hydrant is required within 200 driving feet, but not closer than 50 feet, of every structure. Location <br />of the hydrant(s) shall be approved by the Fire Marshal. <br />14. An approved automatic fire detection system shall be provided as required by City Ordinance No. 1902- <br />92, Chapter 16.76, of the Everett Municipal Code. <br />Plans fcr such system shall be submitted to the Fire Marshal for review and approval prior to installation. <br />Submittal shall include cut sheets of all equipment intended for use. Appropriate trip tests, witnessed by <br />3 ��jS <br />
The URL can be used to link to this page
Your browser does not support the video tag.