Laserfiche WebLink
,, v: <br />TO: <br />FROM: <br />DATE: <br />SUBJECT: <br />PROPOSAL: <br />LOCATION: <br />MEMORANDUM <br />Steve Ingalsbe, Planning Department <br />Dennis Roberson, Engineering/Public Services <br />August 20, 2007 <br />REV I 07-010 <br />Proposed 1800 sq. ft. addition to existing 5,200 sq. ft. <br />7107 Evergreen Way <br />A review of this project by the Engineering/Public Services Department indicates that the <br />following conditions should apply: <br />1. A Public Works Permit is required for this project. Detailed drawings in accordance <br />with City Design and Construction Standards shall be submitted to the Public Works <br />Department, showing site parking layout, landscaping, utilities, storm drainage, <br />temporary construction erosion control, and all required improvements in the public <br />right-of-way. Public Works Department approval of these drawings is required prior <br />to any permits being issued. All improvements shall be completed and approved <br />warranted before the Occupancy Permit is issued/final approval is granted. <br />2. Any grading/fill on this site shall be done so as to not impact the surrounding <br />properties. <br />3. This project must comply with the current City of Everett Building Code. <br />4. The driveway on Evergreen Way must be relocated as shown on the proposed plan per <br />city standards. <br />5. City streets and alleys are to be kept clear of dirt and debris at all times during <br />construction. Dust suppression and street cleaning must occur as directed by the <br />Public Works Inspector. <br />6. Any broken or damaged sidewalk shall be repaired/replaced per the City Public Works <br />Inspector. <br />7. Temporary erosion control measures for construction activity must be operational <br />prior to commencement of any clearing or earthwork. <br />Jf' (/ e q/2o /,x <br />OEOVROOEIISON/REV 107.01017107 EVERGREEN WAY) <br />