My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 "ADA Features Surveying", lump sum. <br /> 3 <br /> I 4 The unit Contract price per lump sum for "ADA Features Surveying" shall be full pay for <br /> 5 all the Work as specified. <br /> 6 <br /> I 7 ..--,,,::.:',„?",.q:;-.--; <br /> 8 1-05.7 Removal of Defective and Unauthorized Work <br /> 9 (October 1, .2005 APWA GSP) <br /> I <br /> 10 <br /> 11 Supplement this section with the following: <br /> 12 <br /> 13 If the Contractor fails to remedy defective or unauthorized work within the time specified <br /> 14 in a written notice from the Engineer, or fails to perform any part of the work required by <br /> 15 the Contract Documents, the Engineer may correct and remedy such work as may be <br /> 16 identified in the written notice, with Contracting Agency forces or by such other means <br /> 17 as the Contracting Agency may deem necessary. <br /> 18 <br /> 19 If the Contractor fails to comply with a written order to remedy what the Engineer <br /> I <br /> 20 determines to be an emergency situation, the Engineer may have the defective and <br /> 21 unauthorized work corrected immediately, have the rejected work removed and <br /> 22 replaced, or have work the Contractor refuses to perform completed by using <br /> I <br /> 23 Contracting Agency or other forces. An emergency situation is any situation when, in the <br /> 24 opinion of the Engineer, a delay in its remedy could be potentially unsafe, or might cause <br /> 25 serious risk of loss or damage to the public. <br /> I 26 <br /> 27 Direct or indirect costs incurred by the Contracting Agency attributable to correcting and <br /> 28 remedying defective or unauthorized work, or work the Contractor failed or refused to <br /> I <br /> 29 <br /> 30 perform, shall be paid by the Contractor. Payment will be deducted by the Engineer from <br /> monies due, or to become due, the Contractor. Such direct and indirect costs shall <br /> 31 include in particular, but without limitation, compensation for additional professional <br /> I 32 services required, and costs for repair and replacement of work of others destroyed or <br /> 33 damaged by correction, removal, or replacement of the Contractor's unauthorized work. <br /> 34 <br /> 35 No adjustment in contract time or compensation will be allowed because of the delay in <br /> I <br /> 36 the performance of the work attributable to the exercise of the Contracting Agency's <br /> 37 rights provided by this Section. <br /> 38 <br /> I 39 The rights exercised under the provisions of this section shall not diminish the <br /> 40 Contracting Agency's right to pursue any other avenue for additional remedy or <br /> 41 damages with respect to the Contractor's failure to perform the work as required. <br /> I 42 <br /> 43 <br /> I <br /> I <br /> I <br /> VoteeeeMIM <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> ISTATE FUND#GCB2316; COE WO#3644 17 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.