My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 Contractor, take whatever steps are necessary to correct those deficiencies pursuant to <br /> 2 Section 1-05.7. <br /> 3 The Contractor will not be allowed an extension of contract time because of a delay in <br /> 4 the performance of the work attributable to the exercise of the Engineer's right <br /> 5 hereunder. <br /> 6 <br /> I <br /> 7 Upon correction of all deficiencies, the Engineer will notify the Contractor and the <br /> 8 Contracting Agency, in writing, of the date upon which the work was considered physically <br /> 9 complete. That date shall constitute the Physical Completion Date of the contract, but shall <br /> I <br /> 10 <br /> 11 not imply acceptance of the work or that all the obligations of the Contractor under the <br /> contract have been fulfilled. <br /> 12 <br /> I <br /> 13 1-05.11(3) Operational Testing <br /> 14 <br /> 15 It is the intent of the Contracting Agency to have at the Physical Completion Date a <br /> I16 complete and operable system. Therefore when the work involves the installation of <br /> 17 machinery or other mechanical equipment; street lighting, electrical distribution or signal <br /> 18 systems; irrigation systems; buildings; or other similar work it may be desirable for the <br /> Engineer to have the Contractor operate and test the work for a period of time after finalI19 <br /> 20 inspection but prior to the physical completion date. Whenever items of work are listed in <br /> 21 the Contract Provisions for operational testing they shall be fully tested under operating <br /> 22 conditions for the time period specified to ensure their acceptability prior to the Physical <br /> I 23 Completion Date. During and following the test period, the Contractor shall correct any <br /> 24 items of workmanship, materials, or equipment which prove faulty, or that are not in first <br /> 25 class operating condition. Equipment, electrical controls, meters, or other devices and <br /> I 26 equipment to be tested during this period shall be tested under the observation of the <br /> 27 Engineer, so that the Engineer may determine their suitability for the purpose for which <br /> 28 they were installed. The Physical Completion Date cannot be established until testing <br /> I 29 and corrections have been completed to the satisfaction of the Engineer. <br /> 30 <br /> 31 The costs for power, gas, labor, material, supplies, and everything else needed to <br /> I <br /> 32 <br /> 33 successfully complete operational testing, shall be included in the unit contract prices <br /> related to the system being tested, unless specifically set forth otherwise in the proposal. <br /> 34 <br /> 35 Operational and test periods, when required by the Engineer, shall not affect a <br /> I36 manufacturer's guaranties or warranties furnished under the terms of the contract. <br /> 37 <br /> 38 <br /> 111 39 .:- _rT. , I Z- <br /> 40 1-05.13 Superintendents, Labor and Equipment of Contractor <br /> 41 (August 14, 2013 APWA GSP) <br /> I 42 <br /> 43 Delete the sixth and seventh paragraphs of this section. <br /> 44 <br /> I <br /> 45 . -0 ,14,GR <br /> 46 1-05.14 Cooperation With Other Contractors <br /> 47 <br /> 48 1-O. .4,27V5 GR1 <br /> I 49 Section 1-05.14 is supplemented with the following: <br /> 50 <br /> I <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 19 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.