My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 . , if's t;=111 � <br /> 2 Section 1-07.7 is supplemented with the following: <br /> 3 <br /> 4 Z- 7, %C,G171 <br /> 5 (March 13, 1995) <br /> 6 If the sources of materials provided by the Contractor necessitates hauling over roads <br /> 7 other than State Highways, the Contractor shall, at the Contractor's expense, make all <br /> 8 arrangements for the use of the haul routes. <br /> 9 <br /> 101-07.9.GRI <br /> 11 Wages <br /> 12 <br /> 13 1-O. 9(1).GR1 <br /> 111 <br /> 14 General <br /> 15 <br /> 16 @OZ 9( )J! T?',Gf i <br /> 17 Section 1-07.9(1) is supplemented with the following: <br /> 18 <br /> 19 fid. ccs.),op T(.7; <br /> 20 (January 5, 2018) <br /> 21 The Federal wage rates incorporated in this contract have been established by the <br /> 22 Secretary of Labor under United States Department of Labor General Decision No. <br /> 23 WA180001. I <br /> 24 <br /> 25 The State rates incorporated in this contract are applicable to all construction <br /> 26 activities associated with this contract. <br /> 27 <br /> 28 m_a t ) , P (71- <br /> 29 (April 2, 2007) <br /> 30 Application of Wage Rates for the Occupation of Landscape Construction <br /> 31 State prevailing wage rates for public works contracts are included in this contract <br /> 32 and show a separate listing for the occupation: <br /> 33 <br /> 34 Landscape Construction, which includes several different occupation <br /> 35 descriptions such as: Irrigation and Landscape Plumbers, Irrigation and <br /> 36 Landscape Power Equipment Operators, and Landscaping or Planting <br /> 37 Laborers. <br /> 38 <br /> 39 In addition, federal wage rates that are included in this contract may also include <br /> 40 occupation descriptions in Federal Occupational groups for work also specifically <br /> 41 identified with landscaping such as: <br /> 42 <br /> 43 Laborers with the occupation description, Landscaping or Planting, or <br /> 44 <br /> 45 Power Equipment Operators with the occupation description, Mulch Seeding <br /> 46 Operator. <br /> 47 <br /> 48 If Federal wage rates include one or more rates specified as applicable to <br /> 49 landscaping work, then Federal wage rates for all occupation descriptions, specific <br /> 50 or general, must be considered and compared with corresponding State wage rates. <br /> I <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 26 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.