My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 to closure. Closure hours will begin on 7:00pm Friday for 16 continuous Calendar days. <br /> 2 All lane shall be open to traffic by Monday 2:30pm. <br /> 3 These two single continuous on-lane closure events can't happen at the same time. <br /> 4 During these two events, the Contractor shall work continuously and reopen lane to traffic <br /> 5 immediately following completion of work. Cement Concrete Roadway shall be re- <br /> 6 opened to traffic as soon as compressive strength of 2,500psi is reached. <br /> 7 <br /> 8 General notes <br /> 9 <br /> 10 Contractor shall return lanes to normal operations at the end of each working day or <br /> 11 provide temporary pavement markings and temporary traffic control devices. Tape <br /> 12 maybe used for temporary pavement marking for a maximum of one week. If temporary <br /> 13 pavement markings are used for longer than one week, raised pavement markers shall <br /> 14 be used. <br /> 15 <br /> 16 ADA compliant pedestrian and bicycle access must be maintained or detours provided at <br /> 17 all times. <br /> 18 <br /> 19 If the Engineer determines the permitted closure hours adversely affect traffic, the <br /> 20 Engineer may adjust the hours accordingly. The Engineer will notify the Contractor in <br /> 21 writing of any change in closure hours. <br /> 22 <br /> 23 *** <br /> 24 <br /> 25 If the Engineer determines the permitted closure hours adversely affect traffic, the <br /> 26 Engineer may adjust the hours accordingly. The Engineer will notify the Contractor in <br /> 27 writing of any change in the closure hours. <br /> 28 <br /> 29 Lane closures are not allowed on any of the following: , <br /> 30 <br /> 31 1. A holiday, <br /> 32 <br /> 33 2. A holiday weekend; holidays that occur on Friday, Saturday, Sunday or Monday <br /> 34 are considered a holiday weekend. A holiday weekend includes Saturday, <br /> 35 Sunday, and the holiday. <br /> 36 <br /> 37 3. After*** 2:30pm *** on the day prior to a holiday or holiday weekend, and <br /> 38 <br /> 39 4. Before *** 7:OOam*** on the day after the holiday or holiday weekend. <br /> 40 <br /> 4117 i <br /> 42 1-07.23(1) Construction Under Traffic <br /> 43 (May 2, 2017 APWA GSP) <br /> 44 <br /> 45 Revise the third sentence of the second paragraph to read: <br /> 46 <br /> 47 Accessibility to existing or temporary pedestrian push buttons shall not be impaired; if <br /> 48 approved by the Contracting Agency activating pedestrian recall timing or other <br /> 49 accommodation may be allowed during construction. <br /> 50 <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 56 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.